Email, Licensee Response to Request for Additional Information Emergency TS Change for TS 3.8.1, AC Sources-Operating( TAC Nos. ME3505 and ME3506)
ML100710405
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 03/12/2010
From: Parker L
Pacific Gas & Electric Co
To: Baldwin T, Wang A
Plant Licensing Branch IV, Pacific Gas & Electric Co
Wang, A B, NRR/DORL/LPLIV, 415-1445
Shared Package
ML100710385 List:
References
TAC ME3505, TAC ME3506
Download: ML100710405 (3)


Text

From: Parker, Larry M [LMP1@pge.com]

Sent: Friday, March 12, 2010 12:24 PM To: Wang, Alan; Baldwin, Thomas (DCPP)

Cc: Lent, Susan; Burkhardt, Janet; Baldwin, Thomas (DCPP); Guldemond, Bill; West, Ryan

Subject:

RE: Diablo Canyon Emergency TS Change For TS 3.8.1 (ME3505 and ME3506)

Attachments: RAI 1-6 Draft Response.doc; Diesel relay setpoint changes.pdf

Alan, Attached are our DRAFT responses to these RAI's.

Larry Parker DCPP Licensing Supervisor 104/5/23B 805-545-3386 (desk) 805-441-5526 (mobile)

From: Wang, Alan [1]

Sent: Friday, March 12, 2010 7:56 AM To: Parker, Larry M; Baldwin, Thomas (DCPP)

Cc: Lent, Susan; Burkhardt, Janet

Subject:

Diablo Canyon Emergency TS Change For TS 3.8.1 (ME3505 and ME3506)

Tom and Larry, By letter dated March 11, 2010, Pacific Gas and Electric Company (PG&E), the licensee for Diablo Canyon Power Plant, Unit Nos 1 and 2 (DCPP), requested a change to Technical Specification 3.8.1, AC Sources - Operating.

The US Nuclear Regulatory Commission (NRC) staff has determined that the following additional information is needed to complete its review of the subject license amendment request for DCPP. This request was discussed with Larry Parker of your staff on March 12, 2010, and it was agreed that a response would be provided within 1 day of receipt of this email.

If circumstances result in the need to revise the requested response date, please contact me at (301) 415-1445 or via e-mail at Alan.Wang@nrc.gov.

REQUEST FOR ADDITIONAL INFORMATION

1. Provide a detailed list and descriptions of all compensatory measures being used during this extended Allowed Outage Time (AOT) for the Offsite Circuit. This list shall include demonstrated operability of remaining offsite circuit(s), demonstrated operability of all site Emergency Diesel Generators (EDGs), demonstrated operability of all safety busses and the necessary circuits which provide them power from the offsite sources and the EDGs, demonstrated operability of all supporting vital DC systems, demonstrated functionality of both switchyards (230 kV and 500 kV) to support output of both main generators and provide stable offsite power to the plant safety systems, controls in place to prevent maintenance, testing of and protect the aforementioned systems and components during the extended AOT as well as avoid possible plant transients or abnormal plant evolutions, details of plans made with the Transmission

Operator for oversight of transmission system operation during this AOT to ensure continued availability and reliability.

2. Provide detailed information concerning ability of the offsite circuits to also provide the necessary power and voltage for starting of all required 1E loads as a result of the scenarios which caused the problems with the running 1E loads.
3. Provide a description of and describe whether training has been completed for any procedures required for the configuration of the plant during the extended AOT. For example, a procedure for restarting a 1E pump that would happen to trip on overload.
4. Provide a detailed description of the maintenance plan and the post maintenance operability testing required to implement compensatory measures for the purpose of justifying the 24-hour AOT extension.
5. Provide a detailed discussion about the effects on plant operations under the current configuration with the automatic transfers being disabled.
6. Confirm that a dual unit trip is part of the Diablo Canyon Power Plant (DCPP) licensing basis in addition to being required by the Transmission Provider.

E-mail Properties Mail Envelope Properties (855985CB2A096741901904980FD8CB6C02EED2A8)

Subject:

RE: Diablo Canyon Emergency TS Change For TS 3.8.1 (ME3505 and ME3506)

Sent Date: 3/12/2010 12:24:21 PM Received Date: 3/12/2010 12:24:22 PM From: Parker, Larry M Created By: LMP1@pge.com Recipients:

Alan.Wang@nrc.gov (Wang, Alan)

Tracking Status: None TRB1@pge.com (Baldwin, Thomas (DCPP))

Tracking Status: None Susan.Lent@nrc.gov (Lent, Susan)

Tracking Status: None Janet.Burkhardt@nrc.gov (Burkhardt, Janet)

Tracking Status: None TRB1@pge.com (Baldwin, Thomas (DCPP))

Tracking Status: None WGG4@pge.com (Guldemond, Bill)

Tracking Status: None RAWD@pge.com (West, Ryan)

Tracking Status: None Post Office:

exchange18.Utility.pge.com Files Size Date & Time MESSAGE 944166 3/12/2010 RAI 1-6 Draft Response.doc 36928 Diesel relay setpoint changes.pdf 896362 Options Expiration Date:

Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: