DCL-04-111, Inservice Inspection Report for Diablo Canyon Unit 1 Twelfth Refueling Outage
| ML042590351 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 09/07/2004 |
| From: | Becker J Pacific Gas & Electric Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| DCL-04-111 | |
| Download: ML042590351 (64) | |
Text
Pacific Gas and Electric Company James R. Becker Vice President-Diablo Canyon Operations and Station Director Diablo Canyon Power Plant PO. Box 56 Avila Beach, CA 93424 September 7, 2004 805.545.3462 Fax: 805.545.4234 PG&E Letter DCL-04-1 11 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 50-275, OL-DPR-80 Diablo Canyon Unit 1 Inservice Inspection Report for Unit 1 Twelfth RefuelinQ Outage
Dear Commissioners and Staff:
In accordance with ASME Section Xl, paragraph IWA 6230, enclosed is the Diablo Canyon Inservice Inspection Report. This report provides the results of the Unit 1 Twelfth Refueling Outage Inservice Inspections of Class 1 and 2 components and supports.
ddm/469/R0237144 cc/enc:
Bruce S. Mallett David L. Proux Girija S. Shukla State of California, Pressure Vessel Unit cc:
Diablo Distribution 40-A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway a Comanche Peak
- Diablo Canyon
- Palo Verde
- South Texas Project
- Wolf Creek
Enclosure PG&E Letter DCL-04-1 11 INSERVICE INSPECTION REPORT FOR DCPP UNIT I TWELFTH REFUELING OUTAGE
Diablo Canyon Power Plant Unit 1 USNRC Docket No. 50-275 Operating License No. DPR-80 Prepared By:
Reviewed BT Approved B]
Commer ial Operation Date, May 7,1985 Thomas L. Alcott and Chris Beard, ISI Specialists f
James Hill, Lead ISI Specialist Jg by; I1
- - 1/
a Patrick Nugent, Manager rSS Engineering This report is submitted as required by ASME Boiler and Pressure Vessel Code,Section XI, to the United States Nuclear Regulatory Commission.
It
SECTION A.
B.
C.
D.
TABLE OF CONTENTS TITLE Introduction ASME Code Data Report Form NIS-1 (Basis of Summary)
- 1.
Class I
- 2.
Class 2 Class 1 Components I.
Vessels
- a. Reactor Vessel
- 2.
Piping
- 3.
Integral Attachments
- 4.
Supports Class 2 Components
- 1.
Vessels
- 2.
Piping
- 3.
Integral Attachments
- 4.
Supports E.
F.
G.
System Pressure Tests Preservice Inspection Items Repairs and Replacements I.
ASME Code Data Report Form NIS-2 (Indexed by System)
Containment Examinations Augmented Examinations H.
I.
SECTION A INTRODUCTION
SECTION A INTRODUCTION Inservice inspection (1SI) of scheduled ASME Section XI Class 1 and 2 components and their supports at Pacific Gas and Electric Company's Diablo Canyon Power Plant (DCPP)
Unit I was completed during the twelfth refueling outage from March through May, 2004. The DCPP Unit 1 twelfth refueling outage (lR12) was the first outage in the third period within the second 10-year ISI interval.
In addition to the ASME Code examinations reported here, a 100% bare metal examination was conducted on the reactor vessel top head penetration nozzles. The reactor bottom head penetration nozzles also received a visual examination. No evidence of boric acid leakage was found. Regional NRC staff reviewed these examinations, and results are on file at the plant site.
This report is submitted as required by ASME Section XI, paragraph IWA-6220, and is organized in several sections. An introduction is provided in Section A. Section B contains the completed ASME Code Data Report Form NIS-1 for Class I and 2 components. Sections C and D detail the Class 1 and 2 examinations performed, date of examination (for group items or for more than one type of examination performed, the date provided is the most recent examination date), any unusual conditions noted, corrective actions if required, and explanatory remarks.
System pressure tests on Class I. and 2 systems conducted during the period following IRi 1, and up to and including IR12, are reported in Section E.
Preservice inspections were performed on certain components, as required after repairs or replacements. These items are detailed in Section F.
Section G of this report, Repairs and Replacements, contains the completed ASME Code Data Report Form NIS-2 for those IR12 work packages closed prior to July 8, 2004 and for any pre-1R12 work packages closed after July 1, 2002. NIS-2 reports for IR12 work packages that are closed after July 7, 2004 will be included in the next outage report.
Corrective actions and work order package documentation are on file at DCPP and are referenced by work order number in the NIS-2 reports.
Containment exams are reported in Section H.
Augmented exams are reported in Section I.
SECTION B ASME CODE DATA NIS-1 FORMS
FORM NIS-1 OWNER'S DATA REPORT FOR INSERVICE INSPECTIONS As required by the Provisions of the ASME Code Rules
- 1.
Owner Pacific Gas & Electric Company. 77 Beale St.. San Francisco. CA 94106
- 2.
Plant Diablo Canyon Power Plant, P.O. Box 56. Avila Beach, CA 93424
- 3.
Plant Unit One
- 4. OwnerCertificateofAuthorization(ifrequired)
N/A
- 5.
Commercial Service Date 05/07/85 6. National Board Number for Unit N/A
- 7.
Component Inspected ASME Code Class I Items Component or Manufacturer or Installer Manufacturer or State or Province National Board Appurtenance Installer Serial No.
No.
No.
Reactor Vessel Combustion Engineering CE 66104 11475-76 20760 Westinghouse Reactor Vessel Combustion Engineering CE 66204 11475-76 20760 Head Westinghouse Steam Gen 1-1 Westinghouse 1041 N/A 68-12 Steam Gen 1-2 Westinghouse 1042 N/A 68-13 Steam Gen 1-3 Westinghouse 1043 N/A 68-14 Steam Gen 14 Westinghouse 1044 N/A 68-15 Pressurizer Westinghouse 1051 N/A 68-30 Reactor Coolant Westinghouse 507 N/A N/A Pump 1-2 Class I Valves Various N/A N/A N/A Class I Supports Various N/A N/A N/A Class I Piping Wismer & Becker/Kellog N/A N/A N/A Note: Supplemental sheets in form of lists, sketches, or drawings may be used provided (1) size is 8 1/2 in. x 11 in., (2) information in items I through 6 on this data report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
FORM NIS-I (back)
- 8.
Examination Dates 03/04 to 05/04
- 9.
Inspection Period Identification:
Third (I l1' to 12"')
- 10.
Inspection Interval Identification:
Second
- 11.
Applicable Edition of Section'XI 1989 Addenda None
- 12.
Date/Revision of Inspection Plan:
December 2002. Revision 2
- 13.
Abstract of Examinations and Tests. Include a list of examinations and tests and a statement concerning status of work required for current interval. Refer to ISI Report
- 14.
Abstract of Results of Examinations and Tests.
Refer to 1SI Report
- 12.
Abstract of Corrective Measures.
Refer to ISI Report We certify that a) the statements made in this report are correct, b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI, and c) corrective measures taken conform to the rules of the ASME Code, Section Xl.
Certificate of Authorization No. (if applicable)
Expiration mate Date AyausT 31 20 0OŽ Signed Engineering Manager By J!.L /
Owner Patr(A-Nugent CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and/or the State or Province of California and employed byH. S. B. I. & I. Co. of Harford. CT have inspected the components described in this Owners' Data Report during the period 03/04 to 05/04
. and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Data Repart in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners'Data Report.
Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
Date..
47/
20 C Commissions CA 1828, NB 9990 A.N.I.C.
Inspsos Signature/Kenny Kim National Board, State, Province and No.
FORM NIS-1 OWNER'S DATA REPORT FOR INSERVICE INSPECTIONS As required by the Provisions of the ASME Code Rules 1.
2.
3.
5.
7.
Owner Pacific Gas & Electric Company. 77 Beale St.. San Francisco, CA 94106 Plant Diablo Canyon Power Plant. P.O. Box 56. Avila Beach. CA 93424 Plant Unit One
- 4. Owner Certificate of Authorization (if required) N/A Commercial Service Date 05/07/85 6. National Board Number for Unit N/A Component Inspected ASME Code Class 2 Items Component or Manufacturer or Installer Manufacturer or State or Province National Board Appurtenance Installer Serial No.
No.
No.
Steam Gen 1-1 Westinghouse 1041 N/A 68-12 Steam Gen 1-3 Westinghouse 1043 N/A 68-14 Steam Gen 1-4 Westinghouse 1044 N/A 68-15 Class 2 Piping Various N/A N/A N/A Supports Class 2 Piping M.W. Kellogg/ Pullman N/A N/A N/A Power Note: Supplemental sheets in form of lists, sketches, or drawings may be used provided (1) size is 8 1/2 in. x I1 in., (2) information in items I through 6 on this data report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
FORM NIS-I (back)
- 8.
Examination Dates 03/04 to 05/04
- 9.
Inspection Period Identification:
Third (I It to 12d')
- 10.
Inspection Interval Identification:
Second
- 11.
Applicable Edition of Section Xl 1989 Addenda None
- 12.
Date/Revision of Inspection Plan:
December 2002, Revision 2
- 13.
Abstract of Examinations and Tests. Include a list of examinations and tests and a statement concerning status of work required for current interval. Refer to lSI Report
- 14.
Abstract of Results of Examinations and Tests.
Refer to IS1 Report
- 12.
Abstract of Corrective Measures.
Refer to ISI Report We certify that a) the statements made in this report are correct, b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI, and c) corrective measures taken conform to the rules of the ASME Code,Section XI.
Certificate of Authorization No. (if applicable)
Expiration Doe.
Date Ayt huS 31 20 OL Signed Eneineerina Manaper By Go Owner Patrick Wth-ent CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and/or the State or Province of California and employed by H. S. B. I. & I. Co. of Harford. CT have inspected the components described in this Owners' Data Report during the period 03/04 to 05/04
, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Data Repot in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners'Data Report.
Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
Date 7
20
.....Commissions CA 1828. NB 9990 A.N.I.C.
National Board, State, Province and No.
SECTION C CLASS ONE COMPONENTS
PG&E SECOND INTERVAL, THIRD PERIOD, FIRST REFUELING OUTAGE REPORT (1R12)
ASME SECTION XI SYSTEMS - CLASS I DIABLO CANYON POWER PLANT - UNIT 1 MAJOR ITEM: REACTOR VESSEL PAGE 1 of 2 CATEGORY COMPONENT/
WELD OR EXAM EXAM ITEM DESCRIPTION LINE COMPONENT NO.
TYPE DATE COMMENTS RESULTS B-A B 1.22 Head Welds -
Meridional Head Welds -
Meridional B1.40 Head to Flange Weld (1/3)
B-G-1 B6.10 RPV1 Closure Head Nuts Additional RPVI Closure Exams Head Nuts B6.30 RPVI Closure Hd Studs RPVI Closure Hd Studs B6.50 RPV1 Closure Washers RPV I Closure Hd RPV I Closure Hd RPV I Closure Hd RPV I Closure Hd RPV Bolting
> 2" diam.
RPV Bolting
> 2" diam.
RPV Bolting
> 2" diam.
RPV Bolting
> 2" diam.
RPV Bolting
> 2" diam.
1-446E 1-446F 6-446A 6-446A RPVI Nuts 37 to 54 RPVI Nuts 3 to 36 RPV1 Studs 37 to 54 RPVI Studs 37 to 54 RPVI Washer 37 to 54 UT UT MT UT MT MT MT UT VT-I 4-7-04 4-7-04 4-5-04 4-5-04 NRI NRI NRI NRI 4-13-04 4-15-04 4-13-04 4-13-04 4-13-04 RI - Nut 150, A0605797, Refer to System-07 NIS-2 for Repair RI - Nuts: 1, 9, 18, 30, & 32, A0605797, Refer to System-07 NIS-2 for Repair NRI NRI NRI NRI NRI
PG&E DIABLO CANYON POWER PLANT - UNIT I SECOND INTERVAL, THIRD PERIOD, FIRST REFUELING OUTAGE REPORT (IR12)
MAJOR ITEM: REACTOR VESSEL ASME SECTION XI SYSTEMS - CLASS I CATEGORY COMPONENT /
WELD OR EXAM EXAM ITEM DESCRIPTION LINE COMPONENT NO.
TYPE DATE B-0 1314.10 RPVI: Welds in RVI CRDM E-3 RV] CRDM 56 Weld PT 3-31-04 CRD Housing RPVl: Welds in RVI CRDMC-5 RVI CRDM 57 Weld PT 3-31-04 CRD Housing RPVI: Welds in RVI CRDM C-3 RVI CRDM 73 Weld PT 3-31-04 CRD Housing PAGE 2 of 2 COMMENTS RESULTS NRI NRI NRI
PG&E DIABLO CANYON POWER PLANT - UNIT I SECOND INTERVAL, THIRD PERIOD, FIRST REFUELING OUTAGE REPORT (1R12)
MAJOR ITEM: STEAM GENERATORS ASME SECTION XI SYSTEMS - CLASS 1 PAGE 1 of2 CATEGORY COMPONENT /
WELD OR EXAM EXAM ITEM DESCRIPTION LINE COMPONENT NO.
TYPE DATE COMMENTS RESULTS B-B B2.40 Tubesheet to Head Steam Gen. 1-1 Channel W 1-1 UT 4-26-04 Weld (1/3) one third NRI
PG&E DIABLO CANYON POWER PLANT -
UNIT I SECOND INTERVAL, THIRD PERIOD, FIRST REFUELING OUTAGE REPORT (1R12)
MAJOR ITEM: STEAM GENERATORS ASME SECTION XI SYSTEMS - CLASS I CAT 1116.20 STEAM GENERATOR TUBING PAGE 2 of 2 The following percentages apply to inservice tubes.
SCOPE PROBE TYPE SG 1-1 SG 1-2 SG 1-3 SG 1-4 Full length (except Rows I Bobbin 100%
100%
100%
100%
and 2 U-bends)
Rows I and 2 U-bends Plus Point 100%
100%
100%
100%
Rows 13 to 17 U-bends Plus Point 20%
20%
20%
20%
Repeat PWSCC indications at Plus Point 100%
100%
100%
100%
dents and top of tubesheet Hot Leg top-of tubesheet Plus Point 100%
100%
100%
100%
> 5 volt dented TSP Plus Point 100% at I H to 4H 100% at IH to 7C 20% at IH to 7H 100% at IH to 6H intersections (Note 1) 20% at 5H to 7H 20% at 6C 20% at 7H
> 2 and < 5 volt dented TSP Plus Point 100% at I H to 4H 100% at I H to 7C 20% at IH 100% at I H to 6H intersections (Note 1) 20% at 5H 20% at 6C 20% at 7H
> 0.21 volt and < 2 volt Plus Point 100% I H NA NA NA dented TSP intersections (Note 1) 20% 2H Distorted OD bobbin signals Plus Point 100% of DOS greater 100% of DOS greater 100% of DOS greater 100% of DOS greater (DOS) at TSP intersections than 1.4 bobbin volts than 1.4 bobbin volts than or equal to 1.7 than or equal to 1.7 bobbin volts bobbin volts Distorted ID bobbin signals Plus Point 100%
100%
100%
100%
(DIS) at TSP intersections
> 5 volt free span dings Plus Point 100%
100%
100%
100%
Baseline TSP ligament Plus Point 100%
100%
100%
100%
indications Tubes plugged 29 91 10 10 Note 1: For each 20% sample, inspect at least 50 dents, or else inspect 100% if there are less than 50 dents.
PG&E DIABLO CANYON POWER PLANT - UNIT I SECOND INTERVAL, THIRD PERIOD, FIRST REFUELING OUTAGE REPORT (1R12)
MAJOR ITEM: Pumps, Piping ASME SECTION XI SYSTEMS - CLASS I PAGE 1 of 2 CATEGORY COMPONENT /
WELD OR EXAM EXAM ITEM DESCRIPTION LINE COMPONENT NO.
TYPE DATE COMMENTS RESULTS B-G-I B6.180 Pump Bolting
> 2" diam.
B-G-2 RCP 1-2 Main Flange Bolts RCP 1-2 Bolts 10-17 UT 4-1-04 NRI B7.50 Pipe Bolting
< 2" diam.
Pipe Bolting
< 2" diam.
Pipe Bolting
< 2" diam.
B7.70 Pipe Bolting
< 2" diam.
Pipe Bolting
< 2" diam.
Pipe Bolting
< 2" diam.
Pipe Bolting
< 2" diam.
S6-727-6 S6-56-1.5 S6-57-1.5 S6-254-1 OSPL+
S6-255-IOSPL+
S6-256-1OSPL+
RV-8010C Inlet Flg 12 Studs & Nuts (WIB-991 W]B-992) 4 Studs & Nuts (WIB-1004/WIB-1005) 4 Studs-Nuts V-89481:
16 Studs & Nuts V-8948C:
16 Studs & Nuts V-8948D:
16 Studs & Nuts V-8740B:
16 Studs & Nuts VT-I VT-I 4-17-04 NRI 4-19-04 VT-I 4-17-04 NRI NRI VT-I 4-17-04 VT-I 4-17-04 VT-I 4-17-04 NRI NRI NRI S6-2576-8 VT-I 4-17-04 NRI
PG&E DIABLO CANYON POWER PLANT - UNIT 1 SECOND INTERVAL, THIRD PERIOD, FIRST REFUELING OUTAGE REPORT (lR12)
MAJOR ITEM: Pumps, Piping ASME SECTION XI SYSTEMS - CLASS 1 PAGE 2 of 2 CATEGORY COMPONENT/
WELD OR EXAM EXAM ITEM DESCRIPTION LINE COMPONENT NO.
TYPE DATE COMMENTS RESULTS B-J See RI-ISI B-L-I B12.10 RCP 1-2: Pump Casing Weld RCP 1-2 Girth Weld RCP 1-2 Girth Weld VT-I 4-21-04 Code Case N-481. VT-2 exam performed with system pressure test. WCAP-13044 and WCAP-13045 demonstrate compliance to Code Case N-481 for Westinghouse primary loop pump casings.
NRI
PG&E SECOND INTERVAL, THIRD PERIOD, FIRST REFUELING OUTAGE REPORT (IR12)
ASME SECTION XI SYSTEMS - CLASS I DIABLO CANYON POWER PLANT - UNIT I MAJOR ITEM: Piping PAGE 1 of 2 CATEGORY COMPONENT /
WELD OR EXAM EXAM ITEM DESCRIPTION LINE COMPONENT NO.
TYPE DATE COMMENTS RESULTS RI-ISI RC Out Lp 2: Pipe Welds > 4" diam RC Pp Dis Lp 2:
Pipe Welds > 4" diam Lp 2 xover Stub:
Pipe Welds < 4" diam Chg Line Lp 3:
Pipe Welds < 4" diam Chg Line Lp 3' Pipe Welds < 4" diam Chg Line Lp 3:
Pipe Welds < 4" diam
- 2-29SPL
- 10-27.5SPL S6-1 147-3SPL S6-50-3SPL S6-50-3SPL S6-50-3SPL WIB-RC-2-2 WIB-RC-2-1 7 WIB-89A WIB-221 WIB-222 WIB-223 UT 4-15-04 Substituted for WIB-RC-2-9 (One Sided Exam)
NRI NRI UT 4-16-04 Substituted for WIB-RC-2-10 (One Sided Exam)
UT UT UT UT 4-14-04 NRI 4-09-04 NRI 4-09-04 NRI 4-09-04 NRI
PG&E SECOND INTERVAL, THIRD PERIOD, FIRST REFUELING OUTAGE REPORT (1R12)
ASME SECTION XI SYSTEMS - CLASS 1 DIABLO CANYON POWER PLANT - UNIT 1 MAJOR ITEM: Piping PAGE2of 2 CATEGORY COMPONENT /
WELD OR EXAM EXAM ITEM DESCRIPTION LINE COMPONENT NO.
TYPE DATE COMMENTS RESULTS Rl-ISI Accumulator Inj.
Loop-I Pzr Pwr RV PCV-456 Pzr Pwr RV PCV-456 Pzr Pwr RV PCV-456 HL Recirc before V-8702 S6-253-1OSPL S6-1195-3SPL S6-1195-3SPL S6-1195-3SPL S6-109-14SPL WIB-42 UT WIB-446 UT WIB-449 UT 04-15-04 03-31-04 Substituted for WIB-445 (One Sided Exam) 03-31-04 03-31-04 Substituted for WIB-454 (Access) 04/02/04 NRI NRI NRI WIB-447 UT NRI WIB-230 UT NRI
PG&E DIABLO CANYON POWER PLANT - UNIT I SECOND INTERVAL, THIRD PERIOD, FIRST REFUELING OUTAGE REPORT (1R12)
MAJOR ITEM: INTEGRAL ATTACHMENTS ASME SECTION XI SYSTEMS - CLASS I CATEGORY COMPONENT /
WELD OR EXAM EXAM ITEM DESCRIPTION LINE COMPONENT NO.
TYPE DATE B-K-I B10.10 Accumulator S6-255-1OSPL 57N-4V Paramount PT 4-23-04 Injection Lp 3 RHR Pp 1-1 Inj S6-3845-6SPL 42-44V Paramount PT 4-01-04 Cold Leg 2 RHR Pp 1-2 Inj S6-3847-6SPL 58N-60R X309A-H PT 4-25-04 Cold Leg 4 B 10.20 RC Pump 1-2 RCP 1-2 Lug Weld No. 3 PT 4-21-04 Support Lug PAGE I of I COMMENTS RESULTS NRI NRI NRI NRI
PG&E DIABLO CANYON POWER PLANT - UNIT 1 SECOND INTERVAL, THIRD PERIOD, FIRST REFUELING OUTAGE REPORT MAJOR ITEM: PIPING SUPPORTS (1R12)
ASME SECTION XI SYSTEMS - CLASS I PAGE 1 of 1 CATEGORY F-A SUPPORTS Fl.10 TO Fl.70 SUPPORT COMPONENTS The required inservice inspections were performcd on 74 Class I hangers during the twelfth refueling outage between the dates of 07/02/02 and 07/07/04. All supports found acceptable. Data reports are on file.
LINE SUPPORT LINE SUPPORT LINE SUPPORT LINE SUPPORT LINE SUPPORT 16 10-13SL 56 22-289SL 15 11-144R S1 2152-9 1992 2169-32 109 12-3SL 1991 22-41OSL 15 43-lOCS 51 2152-17 109 12-144SL 1993 22-545SL 15 48-22CS 51 2180-18 109 12-226SL 1994 22-411SL 15 11-15OR 51 2152-12 255 12-139SL 2576-8 40-29R 30 56N-132V 51 2152-18 2575 10-34SL 236 10-30R 1995 12-102R 51 2152-63 2576 10-26SL 236 10-87R 1995 57N-102V 959 216942 237 12-137SL 236 10-133R 24 52-9V 1992 2169-21 3846 13-7SL 3845 42-44V 24 52-41Rl 1992 2169-33 3846 13-9SL 3845 42-42V 1172 11-148R 1992 218243 13 11-105SL 3845 42-54V 1172 11-149R 1992 2169-22 13 11-1IOSL 14 52-16R 51 2152-13 1992 2169-34 1171 11.154SL 14 52-17R 51 2180-15 1992 218242 1171 11-155SL 14 11-137R 51 43-3R1 1992 2156-67 1172 11-131SL 14 52-36V 51 2180-16 1992 2156-85 1195 11-94SL 15 42-4V 51 181-28 1992 2169-19 1195 11-126SL 15 Il-IOOR 51 2152-15 1992 2169-23 195 1-132SL 15 42-64V 51 43-2R 1992 218245 u
,4
SECTION D CLASS TWO COMPONENTS
PG&E SECOND INTERVAL, THIRD PERIOD, FIRST REFUELING OUTAGE REPORT (1R12)
ASME SECTION Xl SYSTEMS - CLASS 2 DIABLO CANYON POWER PLANT - UNIT I MAJOR ITEM: STEAM GENERATORS PAGE I of I CATEGORY COMPONENT/
WELD OR EXAM EXAM ITEM DESCRIPTION LINE COMPONENT NO.
TYPE DATE COMMENTS RESULTS C-A C 1.10 Shell Circ. Welds C1.20 Head Circ. Welds Cl.30 Tubesheet-to-Shell Weld C-B C2.21 Nozzle-to-Shell Weld Nozzle-to-Shell Weld C2.22 Nozzle Inside Radius Section Steam Generator 1-3 Steam Generator 1-4 Steam Generator 1-1 SG 1-4 to K15-225-28V SG 1-4 to K15-225-28V SG 1-4 to K15-225-28V Girth W3-5 accessible 20%
Girth W4-7 accessible 20%
Girth WI one third Main Steam Nozzle-to-Head Weld Main Steam Nozzle-to-Head Weld Main Steam Nozzle Inside Radius UT UT UT UT MT UT 4-5-04 4-7-04 4-26-04 NRI NRI NRI 4-7-04 4-7-04 4-7-04 NRI NRI NRI
PG&E DIABLO CANYON POWER PLANT - UNIT I SECOND INTERVAL, THIRD PERIOD, FIRST REFUELING OUTAGE REPORT (lR12)
MAJOR ITEM: PIPING ASME SECTION XI SYSTEMS - CLASS 2 PAGE 1 of 1 CATEGORY COMPONENT /
WELD'OR EXAM EXAM ITEM DESCRIPTION LINE COMPONENT NO.
TYPE DATE COMMENTS RESULTS C-F-I See RI-ISI C-F See RI-ISI
PG&E DIABLO CANYON POWER PLANT - UNIT I SECOND INTERVAL, THIRD PERIOD, FIRST REFUELING OUTAGE REPORT (1R12)
MAJOR ITEM: PIPING ASME SECTION XI SYSTEMS - CLASS 2 PAGE 1 o I CATEGORY COMPONENT /
WELD OR EXAM EXAM ITEM DESCRIPTION LINE COMPONENT NO.
TYPE DATE COMMENTS RESULTS RI-ISI RHR Injection to Hot Leg 1&2 Steam Gen 1-1 Feed Wtr Sup Steam Gen 1-1 Feed Wtr Sup RWST Out Hdr Containment Spray Wtr Supply Containment Spray Wtr Supply Containment Spray Wtr Supply Containment Spray Wtr Supply S1-985-12111P K16-554-16V K16-554-16V S2-221-18 S2-261-12 S2-261-12 S2-261-12 S2-261-12 WIC-95 WICG94-1 B WICG94-I C RB-221-7 RB-261-14 RB-261-15 RB-261-4 RB-261-19 UT UT UT UT UT UT UT UT 3-18-04 Previous Record RI. Tracking 4-23-04 4-23-04 4-2-04 3-24-04 3-24-04 3-24-04 3-24-04 Substituted for RB-221-4 Substituted for RB-222-13 Substituted for RB-222-14 RI NRI NRI NRI NRI NRI NRI NRI
PG&E SECOND INTERVAL, THIRD PERIOD, FIRST REFUELING OUTAGE REPORT (1R12)
ASME SECTION XI SYSTEMS - CLASS 2 DIABLO CANYON POWER PLANT - UNIT I MAJOR ITEM: INTEGRAL ATTACHMENTS PAGE I of I CATEGORY COMPONENT /
WELD OR EXAM EXAM ITEM DESCRIPTION LINE COMPONENT NO.
TYPE DATE COMMENTS RESULTS C-C C3.20 Steam Gen Steam Line K15-226-Outlet 1-3 28V Steam Gen Steam Line K15-225-Outlet 1-4 28V Stm Gen FW Line K16-555-Supply 1-2 16V Stm Gen FW Line K16-557-Supply 1-3 16V 1026-IV Attachmient Lugs 1028-IV Attachment Lugs 1039-9V Attachment Paramount 1042-9V Attachment Paramount MT MT MT MT 4-15-04 4-15-04 4-15-04 4-15-04 NRI NRI NRI NRI
PG&~E DIABLO CANYON POWER PLANT - UNIT I SECOND INTERVAL, THIRD PERIOD, FIRST REFUELING OUTAGE REPORT MAJOR ITEM: PIPING SUPPORTS (IR1I2)
ASME SECTION XI SYSTEMS - CLASS 2 PAGE I of I CATEGORY F-A SUPPORTS Fl.10 TO Fl.70 SUPPORT COMPONENTS The required inservice inspections were performed on 37 Class 2 hangers prior to and during the twelfth refueling outage between the dates of 07/02/02 and 07/07/04. Results were found acceptable. Data reports are on file.
LINE SUPPORT LINE SUPPORT LINE SUPPORT LINE SUPPORT LINE SUPPORT 985 10-18SL 225 1033-4SL 3551 288-1R
.R -
985 10-19SL 225 1033-6SL 110 55S-90A 985 10-39SL 225 1033-2SL 110 57S-21V 985 10-35SL 1065 1033-15SL 110 72-13V 508 11-37SL 1066 1033-16SL 512 54S-28R 508 36SL 1066 1033-28SL 985 40-47R 508 11-35SL 557 1049-ISL 985 40-59R 2576 10-33SL 556 1049-4SL 2576 10-132SL 556 1049-5SL 57 22-452SL 985 56N-28R R
57 22-488SL 985 56N-78R 226 1030-16SL 985 56N-79R 226 1033-3SL 508 58N-49R 226 1033-5SL 508 58N-52A 225 1031-2SL 508 42-5R
SECTION E SYSTEM PRESSURE TESTS End of 2nd Interval System Hydrostatic Test Performed at NOP IAW Code Case N-498-1
PG&E SECOND INTERVAL, THIRD PERIOD, FIRST REFUELING OUTAGE REPORT (I R12)
ASME SECTION Xi SYSTEMS - CLASS I & 2 DIABLO CANYON POWER PLANT -
UNIT I MAJOR ITEM: PRESSURE TESTS PAGE I of 4 TEST CLASS DESCRIPTION EXAM COMMENTS NO.
DATE RESULTS 2
3.
4 5
6 7
8 Reactor Coolant System and Connected Piping Excess Letdown between 8166 & 8167 Pressurizer Auxiliary spray Alternate Charging RHR & SI to Cold Legs Charging Injection Inside Cont.
Safety Injection Inside Cont, From 8905A-D to 8949A-D RHR Between 8702 & 8701 5-18-04 5-18-04 5-18-04 5-18-04 5-18-04 5-18-04 5-18-04 5-18-04 STP-R8A STP-R8A STP-R8A STP-R8A End of Interval Exam, STP-R8A STP-R8A End of Interval Exam, ISI P-S1-22 STP-R8A NRI NRI NRI NRI NRI NRI NRI NRI
PG&E SECOND INTERVAL, THIRD PERIOD, FIRST REFUELING OUTAGE REPORT (1R12)
ASME SECTION XI SYSTEMS - CLASS 1 & 2 DIABLO CANYON POWER PLANT -
UNIT 1 MAJOR ITEM: PRESSURE TESTS PAGE 2 of 4 TEST CLASS DESCRIPTION EXAM COMMENTS NO.
DATE RESULTS 2
3 8
11 14 17 18 20 21 22 Auxiliary Feedwater Pumps X-2 & X-3 Auxiliary Feedwater Pump X-1 Discharge Charging Pumps Discharge Piping Charging Injection 8803A & B to 8801 A & B Regenerative HX and Letdown Piping Accumulator Injection Loops 1-4, Sample Lines t 9352A-D, Test & Fill lines to 8878A-D Accumulator, RHR & Charging Test Lines RWST Supply to Chg PP Suction, 8805A & B to 8924 Safety Injection Pump Discharge to 8802A & B and Cold Legs Safety Injection Pumps Discharge to Hot Legs from 8802A & B to 8904A-D 5-26-04 6-9-04 5-26-04 4-26-04 5-26-04 5-18-04 5-11-04 3-24-04 5-18-04 5-18-04 End of Interval Exam End of Interval Exam End of Interval Exam End of Interval Exam End of Interval Exam End of Interval Exam End of Interval Exam End of Interval Exam End of Interval Exam End of Interval Exam NRI NRI NRI NRI NRI NRI NRI NRI NRI NRI
PG&E SECOND INTERVAL, THIRD PERIOD, FIRST REFUELING OUTAGE REPORT (IR12)
ASME SECTION Xi SYSTEMS - CLASS I & 2 DIABLO CANYON POWER PLANT -
UNIT 1 MAJOR ITEM: PRESSURE TESTS PAGE 3 of 4 TEST CLASS DESCRIPTION EXAM COMMENTS NO.
DATE RESULTS 24 26 27 28 30 31 32 35 38 44 RHR Hot Leg Injection from 8703 to 8740 A & B RWST Supply to Eductors Containment Spray Pump Discharge Piping to 9015A
& B Containment Spray Pump Discharge Piping from 9015A & B to 9006A & B CCW Supply & Return to Cont Fan Coolers, RCPs and XS Letdowvn Heat Exchanger Steam Generator Nitrogen Supply RX Vessel Level Indication and Vent System Primary Water Supply to PZR Relief Tank (pen 52)
Fuel Transfer Tube to Refueling Canal Inside Cont Instrument Air Supply Header (pen 52) 12-05-02 5-08-04 4-23-04 4-23-04 5-13-04 5-03-04 5-18-04 5-13-04 5-01-04 4-15-04 End of Interval Exam, ISI P-RHR-24 End of Interval Exam, V-311 End of Interval Exam, STP M-86H, STP P-CSP-A2 End of Interval Exam, STP M-86H, STP P-CSP-A2 End of Interval Exam End of Interval Exam End of Interval Exam, R8A End of Interval Exam End of Interval Exam (Relief Request PRS-4, RI Not Used)
End of Interval Exam NRI NRI NRI NRI NRI NRI NRI NRI NRI NRI
PG&E SECOND INTERVAL, THIRD PERIOD, FIRST REFUELING OUTAGE REPORT (1R12)
ASME SECTION XI SYSTEMS - CLASS I & 2 DIABLO CANYON POWER PLANT -
UNIT I MAJOR ITEM: PRESSURE TESTS PAGE 4 of 4 TEST CLASS DESCRIPTION EXAM COMMENTS NO.
DATE RESULTS 45 2
Service Air Penetration Header (pen 52) 4-15-04 End of Interval Exam NRI
SECTION F PRESERVICE INSPECTION ITEMS
PG&E DIABLO CANYON POWER PLANT - UNIT t SECOND INTERVAL, THIRD PERIOD, FIRST REFUELING OUTAGE REPORT (IR12)
MAJOR ITEM: PSI ASME SECTION XI SYSTEMS - CLASS I & 2 PRESERVICE INSPECTION ITEMS PAGE I of I The required preservice inspections were performed on 9 components and 7 supports during the twelfth refueling outage.
Name of WokOdrOther CATEGORY Component System Exam Type Work Order Ident.
No.
Line No B -G -1 RPV Nuts 1,9,18,30,32, 50 7
PT C0188286 RPV Nuts B-G-2 RCS-I -8033A VT-1 (I 2Studs &Nuts)
V-O8861 RCS-1-8033B 7
VT-I C0184892 (I 2Studs &Nuts)VTIC18924 RCS-1-8010A 7
VT-i R0233714 729 RCS-1-8010B 7
VT-I R0233716 728 RCS-1-8010C 7
VT-I R0233717 727 SG 1-4PMW Bolt 4
VT-I C0188365 SG 1-4 B -J_
WIB-337 7
PT C0188753 727 E-A Containment Liner Nelson 45 VT-3 C0184590 Containment Studs Structure F-A 22-212SL 8
VT-3 C0182773 54 48-17R 7
VT-3 C0188604 727 11-14SL 7
VT-3 C0188398 1171 11-136SL 7
VT-3 C0182767 14 11-81SL 9
VT-3 C0182727 3845 2156-81 9
VT-3 C0188295 1992 11-18SL 7
VT-3 C0182703 14
SECTION G REPAIRS AND REPLACEMENTS
I FORM NIS-2 OWNER'S REPORT OF REPAIR OR REPLACEMENT As Required by the Provisions of ASME Code Section XI
- 1. Owner Pacific Gas and Electric Company 77 Beale Street, San Francisco, CA 94106 Date July 7, 2004 Sheet I
of I
Unit I
- 2. Plant Diablo Canyon Power Plant P.O. Box 56, Avila Beach, CA 93424
- 3. Work Performed by Owner See Above Repair Org. P.O. No.. Job No., etc.
- 4. Identification of System Feedwater System (03)
- 5. (a) Applicable Construction Code (See Work Order) 19 Edition (b) Applicable Edition of Section XI Utilized for Repairs or Replacements -
Addenda, Code Cases N/A
- 1989, No Addenda, Code Case N416-1
- 6. Identification of components Repaired or Replaced, and Replacement Components.
IV ASMIE Manufactures Other Repaired Code Name of Name of SeilNat'l Work Order Idnt ear Relcdrr tme Component Manufacture Noa bd. No No.
LIdneNo Built Replacedm or Stamped No)
FW-1-379 Velan Valve 0403 N/A R0224250 571 N/A Replaced (20)
No El
- 7. Description of Work (20) Replaced Disc
- 8. Tests Conducted:
Hydrostatic El Pneumatic a
Nominal Operating Pressure Q Other Pressure PSIG Test Temp. _
'F E]
Pressure Test Conducted IAW Code Case N-416-1
- 9. Remarks CERTIFICATE OF COMPLIANCE We certify that the statements made in this repoyprre c
,X is Replacement comforms to Section Xl of the ASME Code. Signed I-=fE Engineering Manager Zb; /o'4 (Owner or Owner's Designee)
Patrick NAent (Title)
(Date)
CERfIFICATE OF INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of California, employed by HSBCT of Hartford, CT have inspected the Replacement described in this Report on A
3 1,20 0 -4 and state that to the best of my knowledge and belief, this repair or replacement has been constructed in accordance with Sectidn Xl of the ASME Code. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair or replacement described in this Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal Iry oropft amage or loss of any kind arising from or confected %vjth this inspection.
Inspector
&%t&-t's,
4
/ ;a Commissions CA 1828 -NB 9990 A.N.I.C
_iKennyAb. Kim (Title)
Pbate)
(State or Province, National Board)
Note:
upplemental sheets in the form of lists, sketches, or drawings may be used provided (1) size is 8 1/2 x II in., (2) information in items I through 4 on this data report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
FORM NIS-2 OWNER'S REPORT OF REPAIR OR REPLACEMENT As Required by the Provisions of ASME Code Section XI
- 1. Owner Pacific Gas and Electric Company 77 Beale Street, San Francisco, CA 94106
- 2. Plant Diablo Canyon Power Plant Date July 7, 2004 Sheet I
of I
Unit I
P.O. Box 56, Avila Beach, CA 93424
- 3. Work Performed by Owner See Above Repair Org. P.O. No., Job No., etc.
- 4. Identification of System Feedwater System (03)
- 5. (a) Applicable Construction Code (See Work Order) 19 Edition (b) Applicable Edition of Section XI Utilized for Repairs or Replacements -
Addenda, Code Cases N/A
- 1989, No Addenda, Code Case N-416-1
- 6. Identification of components Repaired or Replaced, and Replacement Components.
ASIME Name of of Manufactures at'l ork Order Other Year Repaired Code Component Manufacture MNo No.
ent,.
Built Replaced, or
^
Stamped SerlNo.
W. No Line No Replacement (Yes or No) 1048-IR PG&E N/A N/A C0178556 554 N/A Replaced (19)
D No
- 7. Description of Work (19) Removed/Reinstalled Parts By Welding
- 8. Tests Conducted:
Hydrostatic E]
Pneumatic El NominalOperatingPressure E Other Pressure PSIG Test Temp.
OF E - Pressure Test Conducted IAW Code Case N416-1
- 9. Remarks CERTIFICATE OF COMPLIANCE We certify that the statements made in this repo 1-;e correo&s Replacement comforms to Section Xl of the ASME Code. Signed Add=
\\,7-Engineering Manager R3/ / o' (Owner or Owner's Designee)
Patrick Nuf nt (Title)
(Date)
CERTfFICATE OF INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of California, employed by HSBCT of Hartford, CT have inspected the Replacement described in this Report on A44umtf3
,20 0V and state that to the best of my knowledge and belief, this repair or replacement has been constructed in acc6rdance'with Section XI of the ASME Code. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair or replacement described in this Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injor propery e
ge or loss of any kind arising from or onnected with this inspection.
Inspector AtLu 3
- j. crtg Commissions CA 1828-NB9990 A.N.I.C ny D. Kim (Title)
(Date)
(State or Province, National Board)
Note: Supp emental sheets in the form of lists, sketches, or drawings may be used provided (1) size is 8 12 x 1I1 in., (2) information in items I through 4 on this data report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
FORM NIS-2 OWNER'S REPORT OF REPAIR OR REPLACEMENT As Required by the Provisions of ASME Code Section XI
- 1. Owner Pacific Gas and Electric Company 77 Beale Street, San Francisco, CA 94106
- 2. Plant Diablo Canyon Power Plant P.O. Box 56, Avila Beach, CA 93424 Date July 7, 2004 Sheet I
of 2
Unit I
- 3. Work Performed by Owner See Above Repair Org. P.O. No., Job No., etc.
- 4. Identification of System Turbine Steam Supply System (04)
- 5. (a) Applicable Construction Code (See Work Order) 19 Edition (b) Applicable Edition of Section XI Utilized for Repairs or Replacements -
Addenda, Code Cases N/A
- 1989, No Addenda, Code Case N-416-1
- 6. Identification of components Repaired or Replaced, and Replacement Components.
ASME NManuractures t'l work Order Other Year Repaired Code Component Manuracture ria bd. No No.
LideNo Built Replacemdnt o
Stamper No)
MS-1-FCV-38 Velan Valve NF N/A C0176933 594 N/A Replaced (5)
Yes MS-1-2015 Anchor Darling 0480-1/71 N/A C0185674 727 N/A Replaced (5)
E No S/G 1-1 Westinghouse 1041 68-12 C0185792 SGI-I 1968 Replaced (21) a Yes S/G 1-2 Westinghouse 1042 68-13 C0188362 SGI-2 Replaced (2) l Yes S/G 1-4 Westinghouse 1044 68-15 C0188425 SGlI4 Replaced (2) l Yes
- 7. Description of Work (21) Removed Tube, Installed Welded Plug (5) Replaced Bonnet Bolting (2) Replaced Hand Hole Bolting
- 8. Tests Conducted:
Hydrostatic El Pneumatic E
NominalOperatingPressure El Other Pressure PSIG Test Temp. _F El Pressure Test Conducted IAW Code Case N416-1
- 9. Remarks CERTIFICATE OF COMPLIANCE We certify that the statements made in this repoie cos Replacement comforms to Section XI of the ASME Code. Signed JHi/,.
Engineering Manager
/
3 A/o 1 (Owner or Owvner's Designee)
Patrick Nul7t (Title)
(Date)
CERTItiCATE OF INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of California, employed by HSBCT of Hartford, CT have inspected the Replacement described in this Report on A
,20 c4*
and state that to the best of my knowledge and belief, this repair or replacement has been constructed in accordance with Sectin Xl of the ASME Code. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair or replacement described in this Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal iury orpropert Mage or loss of any kind arising from or connected with this inspection.
Z Inspector Ahq'ttocct3/, a zCommissions CA 1828-NB 9990 A.N.I.C
..-4'enny D. Kim (Title) aDate)
(State or Province, National Board)
Note: Supplemental sheets in the form of lists, sketches, or drawings may be used provided (1) size is 8 1/2 x I I in., (2) information in items I through 4 on this data report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
FORM NIS-2 OWNER'S REPORT OF REPAIR OR REPLACEMENT As Required by the Provisions of ASME Code Section XI
- 1. Owner Pacific Gas and Electric Company 77 Beale Street, San Francisco, CA 94106
- 2. Plant Diablo Canyon Power Plant P.O. Box 56, Avila Beach, CA 93424 Date July 7, 2004 Sheet 2
of 2
Unit I
- 3. Work Performed by Owner See Above Repair Org. P.O. No., Job No., etc.
- 4. Identification of System Turbine Steam Supply System (04)
- 5. (a) Applicable Construction Code See Work Order 19 Edition (b) Applicable Edition of Section XI Utilized for Repairs or Replacements -
Addenda, Code Cases N/A
- 1989, No Addenda, Code Case N-416-1
- 6. Identification of components Repaired or Replaced, and Replacement Components.
Name of Nm o Manufacture Nat'l Work Order Other Year Repaired C
-V o dA e
NmoNaofSerial Nat' NWorOde Ident.
.ca Replaced, or Cd Component Manufacture No No.
Line No Built Replacemen o
Stamped No.
1L-4Wesinghoe 1044 6
8-15
_1_-4 (YReplacem (2s or No)
S/G 14-Westinghouse 1044 68-15 C0188365 SGI-3 N/A Replaced (22)
D Yes S/GI1-3 Westinghouse 1043 68-14 C0188426 SGI-3 N/A Replaced (2) 0 1 Yes MS-1-FCV-760 Fisher Control 4933082 N/A C0188765 1012 N/A Replaced (3) 0 No MS-1-FCV-24 Fisher Control 5727537 N/A C0 189695 3916 N/A Replaced (23) 0 No MS-1-FCV-41 Schuttle N690548 N/A R0150971 228 N/A Replaced (5) 0 No K oerting MS-I-FCV-41 o
of N/A R0150971 228 N/A Replaced (3) 0 No MS-1-5166 AnchorDarling EA998-1-1 N/A R0233336 593 N/A Replaced (3) 0 No
-f
- 7. Remark's (2) Replaced Hand Hole Bolting (3) Replaced Valve Internals (5) Replaced Bonnet Bolting (Applicable Manufacturer's Data Report lo be Attached)
(22) Replaced Primary Manway Bolting (23) Seal Welded Body-to-Bonnet
FORM NIS-2 OWNER'S REPORT OF REPAIR OR REPLACEMENT As Required by the Provisions of ASME Code Section XI
- 1. Owner Pacific Gas and Electric Company 77 Beale Street, San Francisco, CA 94106
- 2. Plant Diablo Canyon Power Plant Date July 7, 2004 Sheet I
of 2
Unit I
P.O. Box 56, Avila Beach, CA 93424
- 3. Work Performed by Owner See Above Repair Org. P.O. No., Job No., etc.
- 4. Identification of System Turbine Steam Supply System (04)
- 5. (a) Applicable Construction Code (See Work Order) 19 Edition (b) Applicable Edition of Section XI Utilized for Repairs or Replacements -
Addenda, Code Cases N/A
- 1989, No Addenda, Code Case N-416-1
- 6. Identification of components Repaired or Replaced, and Replacement Components.
ASIME Manufactures Nat'l
\\ 'ork Order Other
'ar Repaired Code Component Manufacture Serial bd. No No.
Ident.
Built Replaced, or Stamped NmofNmofNo.
Line No Replacement (Yes or No) 3-31R PG&E N/A NIA C0178773 593 N/A Replaced (17)
D No 3-34R PG&E N/A N/A C0178774 593 N/A Replaced (17)
El No 10-113SL Pacific Scientific 446 N/A C0182702 1040 N/A Replaced(IO)
El Yes 12-66SL Pacific Scientific 1552 N/A C0182706 1020 N/A Replaced (10)
El Yes 10-20SL Pacific Scientific 675 N/A C0182715 1041 N/A Replaced (1O)
No
- 7. Description of Work (17) Modified Suppport (10) Replaced Snubber
- 8. Tests Conducted:
Hydrostatic El Pneumatic E
Nominal Operating Pressure E3 Other Pressure PSIG Test Temp.
OF E
Pressure Test Conducted IAW Code Case N4 16-1
- 9. Remarks CERTIFICATE OF COMPLIANCE We certify that the statements made in this report9 correct a Replacement comforms to Section XI of the ASME Code. Signed r'/-
/ \\Engineering Manager
'/;J/7' (Owner or Owner's Designee)
Patrick Nugent/1 (Title)
(Date)
CERTIFIVATE OF INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of California, employed by HSBCT of Hartford, CT have inspected the Replacement described in this Report on
,20 0.4 and state that to the best of my knowledge and belief, this repair or replacement has been constructed in accomance with Section XI of the ASME Code. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair or replacement described in this Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal inju ry r proper
'mage or loss of any kind arising from or con ected with this inspection.
Inspector u~7'.
Commissions CA 1828 - NB3 9990 A.N.I.C Xenny D. Kim (Title)
(bate)
(State or Province, National Board)
Note: S lemental sheets in the form of lists, sketches, or drawings may be used provided (1) size is 8 1/2 x 11 in., (2) information in items I through 4 on this data report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
FORM NIS-2 OWNER'S REPORT OF REPAIR OR REPLACEMENT As Required by the Provisions of ASME Code Section XI
- 1. Owvner Pacific Gas and Electric Company 77 Beale Street, San Francisco, CA 94106 Date July 7, 2004 Sheet 2
of 2
Unit I
- 2. Plant Diablo Canyon Power Plant P.O. Box 56, Avila Beach, CA 93424
- 3. Work Performed by Owner See Above Repair Org. P.O. No., Job No., etc.
- 4. Identification of System Turbine Steam Supply System (04)
- 5. (a) Applicable Construction Code See Work Order 19 Edition Addenda, Code Cases N/A (b) Applicable Edition of Section XI Utilized for Repairs or Replacements -
- 1989, No Addenda, Code Case N-416-1
- 6. Identification of components Repaired or Replaced, and Replacement Components.
Name Or Name Or Manufacture Nat'l Work Order Other eRepaired ASIIE NmoNmefSerial Na'I
'okOdr Mnt er Rpaeo Code Component Manufacture bd. No No.
Ident Built Rtplaced, od N.Line N~o Replacement Ye Stamped 16-72ASL Pacific Scientific 674 N/A C0182769 3917 N/A Replaced (I10) 0 Yes
__________=_
__[-I
- 7. Remarks (10) Replaced Snubber (Applicable Manufacturcr's Data Reports to be Attached)
FORM NIS-2 OWNER'S REPORT OF REPAIR OR REPLACEMENT As Required by the Provisions of ASME Code Section XI
- 1. Owner Pacific Gas and Electric Company 77 Beale Street, San Francisco, CA 94106
- 2. Plant Diablo Canyon Power Plant Date July 7, 2004 Sheet I
of 2
Unit 1
P.O. Box 56, Avila Beach, CA 93424
- 3. Work Performed by Owner See Above Repair Org. P.O. No., Job No., ctc.
- 4. Identification of System Reactor Coolant System (07)
- 5. (a) Applicable Construction Code (See Work Order) 19 _
Edition (b) Applicable Edition of Section XI Utilized for Repairs or Replacements -
Addenda, Code Cases N/A
- 1989, No Addenda, Code Case N.416-1
- 6. Identification of components Repaired or Replaced, and Replacement Components.
ASME M~anufactures N'lOther Repaired Code Cmoetanacre Serial bd oIor re denL.
Ya Replaced, or Stamped Namepe o Namea f or W. No No.
Line No Built Replacement l
(Yes or Noo)
RCS-I-RV-8010C Crosby Valve UIA N/A C0178168 727 Unk Replaced (4)
Yes RCS-0-RV-8010 Crosby Valve U2C N/A C0178203 Stock Unk Replaced (20)
Yes RCS-1-8033A Velan Valve NF N/A C0184829 14 N/A Replaced (5) 0 Yes RCS-1-8033B Velan Valve NF N/A C0184892 14 N/A Replaced (5)
D Yes Rx Vessel 1-1 Combustion Eng.
CE66104 20760 C0188154 Rx Vessel 1-1 1970 Replaced (24) 0 Yes
- 7. Description of Work (4) Replaced Valve (5) Replaced Bonnet Bolting (20) Replaced Disc (24) Replaced CETNA Drive Sleeve
- 8. Tests Conducted:
Pneumatic 0
NominalOperatingPressure 0 Other Pressure PSIG Test Temp.
IF 0
Pressure Test Conducted lAW Code Case N-416-1
- 9. Remarks CERTIFICATE OF COMPLIANCE We certify that the statements made in this reposrre co is Repair / Replacement comforms to Section XI, of the ASME Code. Signed I(c Engineering Manager (Owner or Owner's Designee)
Patrick NSgent (Title)
(Date)
CER IFICATE OF INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of California, employed by HSBCT,
of Hartford, CT have inspected the Repair / Replacement described in this Report on
,20 e0 and state that to the best of my knowledge and belief, this repair or replacement has been constructed in accoance with Sectj6n XI of the ASME Code. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair or replacement described in this Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injuy or prop a ge or loss of any kind arising from or connected with this'inspe tion.
Inspector 3/ o ccs Commissions CA 1828-NB9990 A.N.I.C K
y D. Kim (Title)
$Date)
(State or Province, National Board)
Note: Suppi ental sheets in the form of lists, sketches, or drawings may be used provided #) size is 8 1/2 x 11 in., (2) information in items 1 through 4 Vn this data report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
FORM NIS-2 OWNER'S REPORT OF REPAIR OR REPLACEMENT As Required by the Provisions of ASME Code Section XI
- 1. Owner Pacific Gas and Electric Company 77 Beale Street, San Francisco, CA 94106
- 2. Plant Diablo Canyon Power Plant P.O. Box 56, Avila Beach, CA 93424 Date July 7, 2004 Sheet 2
of 2
Unit I
- 3. Work Performed by Owner See Above Repair Org. P.O. No., Job No., etc.
- 4. Identification of System Reactor Coolant System (07)
- 5. (a) Applicable Construction Code See Work Order 19 _
Edition (b) Applicable Edition of Section XI Utilized for Repairs or Replacements -
Addenda, Coi
- 1989, No de Cases N/A Addenda, Code Case N-416-1
- 6. Identification of components Repaired or Replaced, and Replacement Components.
Manuracture NtI Work Other
'ar Repaired ASNIE Component Manufacture NW.No LneNo Built RepacemopCde Name Of Name Of Se~nr.ial bd. No Orde Ident.
Replacef.ment.
Statmped NO. o.
Lne o Relaceent (Yes or No)
Rx Vessel l-1 Combustion Eng CE66104 20760 C0188286 Rx. Vessel l-1 1970 Repaired (25) 0 Yes Line-727 PG&E N/A N/A C0188753 727 N/A Repaired (26) 0 Yes RCS-l-RV-8010A Crosby Valve U12Sl N/A R0233714 729 2000 Replaced (4) 0 Yes RCS-1-RV-8010B Crosby Valve U12S2 N/A R0233716 728 2000 Replaced (4) 0 Yes RCS-1-RV-8010C Crosby Valve U2A N/A R0233717 727 2000 Replaced (4) 0 Yes RCS-1-8000C Velan Valve NF N/A C0188201 1195 N/A Replaced (31) 0 Yes
-0
-0
__X_
-[I
-5o
- 7. Remarks (4)Replc (Applicable Manufacturer' Data tobe
)0 (25)
Repaired L d
(26)
Repaired L I
Threade Yoke to_ Pso a
ne
- 7. Remarks (4) Replaced Valve (Applicable Manufacturer's Data Repoits to be Attached)
(25) Repaired Linear Indications on six RPV Nuts by Grinding (26) Repaired Linear Indications on pipe by Grinding (3 1)Welded Threaded Yoke to Press. Boundary (Bonnet)
FORM NIS-2 OWNER'S REPORT OF REPAIR OR REPLACEMENT As Required by the Provisions of ASME Code Section XI
- 1. Owner Pacific Gas and Electric Company 77 Beale Street, San Francisco, CA 94106
- 2. Plant Diablo Canyon Power Plant Date July 7, 2004 Sheet I
of 2
Unit I
P.O. Box 56, Avila Beach, CA 93424
- 3. Work Performed by Owner See Above Repair Org. P.O. No., Job No., etc.
- 4. Identification of System Reactor Coolant System (07)
- 5. (a) Applicable Construction Code (See Work Order) 19 Edition (b) Applicable Edition of Section XI Utilized for Repairs or Replacements -
Addenda, Code Cases N/A
- 1989, No Addenda, Code Case N-416-1
- 6. Identification of components Repaired or Replaced, and Replacement Components.
ASIME Nameor Name of Manufactures Nat'l Work Order Other cr Repaired Code NaeorNae fLine No Replacement (Yes or Component Mlanufacture No.
1 bd. No No.ico Built R eplaced, or x
tamped o No) 11-18SL Pacific Scientific 16987 N/A C0182703 14 N/A Replaced (10)
El Yes11-136SL Pacific Scientific 2767 N/A C0182767 14 N/A Replaced (10)
El Yes 11-14SL Pacific Scientific 23083 N/A C0188398 1171 N/A Replaced(26)
El Yes 11-14SL Pacific Scientific 23803 N/A C0188471 1171 N/A Replaced(27)
El Yes48-17R PGE N/A N/A C0188604 727 N/A Replaced (17)
El No
- 7. Description of Work (10) Replaced Snubber (17) Modified Suppport (26) Replaced U-Bolt (27) Added Shim Plate By Welding
- 8. Tests Conducted:
Pneumatic E Nominal Operating Pressure El Other Pressure PSIG Test Temp.
OF El Pressure Test Conducted IAW Code Case N-416-1
- 9. Remarks CERTIFICATE OF COMPLIANCE We certify that the statements made in this repovre corr t is Replacement comforms to Section XI of the ASME Code. Signed 1%
/
Engineering Manager II/3/ 0' (Owner or Owner's Designee)
Patrick Nug it (Title)
(Date)
CERTIVICATE OF INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of California, employed by HSBCT of Hartford, CT have inspected the Replacement described in this Report on it 3
,20 0 and state that to the best of my knowledge and belief, this repair or replacement has been constructed in accordance with Section XI of the ASME Code. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair or replacement described in this Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal inju ar property aage or loss of any kind arising from or con ected with this inspection.
/ r pr9 Inspector eted Commissions CA 1828 -NB 9990 A.N.I.C nny D. Kim (Title)
/JDate)
(State or Province, National Board)
Note: Supp emental sheets in the form of lists, sketches, or drawings maybe used provided (1) size is 8 1/2 x 1 in., (2) information in items I through 4 on this data report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
FORM NIS-2 OWNER'S REPORT OF REPAIR OR REPLACEMENT As Required by the Provisions otASME Code Section Xi
- 1. Owner Pacific Gas and Electric Company 77 Beale Street, San Francisco, CA 94106 Date July 7, 2004 Sheet 2
of 2
Unit I
- 2. Plant Diablo Canyon Power Plant P.O. Box 56, Avila Beach, CA 93424
- 3. Work Performed by Owner See Above Repair Org. P.O. No., Job No., etc.
- 4. Identification of System Reactor Coolant System (07)
- 5. (a) Applicable Construction Code See Work Order 1 9 Edition Addenda, Code Cases N/A
- 1989, No Addenda, Code Case N-416-1 (b) Applicable Edition of Section XI Utilized for Repairs or Replacements -
- 6. Identification of components Repaired or Replaced, and Replacement Components.
Manufacture NtI Work Other Repaired ASNI Nameof Namreof ltSerial ld No Buil Replacedarr
^
Code SeilOrder Ident.
ReplaceStampe C moetMn acueNo.
No.
Line No Replacement ft (Yes or No)48-17R PGE N/A N/A C0188744 727 N/A Replaced (17) 0 No 1_
T_
I
_ I_
T_
E 1_
T_
I_
I_
Tl TI
-_ 7_
T_
El T_11
° I_
T_
I
_ I T
I 1°T I_
1_
1 1
1°l I_
I_
I 1_
1l T_
_ I_
_ I_
Il
_IT I __
I_
I_
1_
1 1_1 1_
1_
1l T_
I_
I_
I_
1_
El 7._
Remark (17)_
Modified Suppport D ata R cpons lo bc_
_ _ _ _ __c l
E l
E
- 7. Remarks (1 7) Modified Suppport (Applicable Manufacturer's Data Reprts to be Attached)
FORM NIS-2 OWNER'S REPORT OF REPAIR OR REPLACEMENT As Required by the Provisions of ASME Code Section XI
- 1. Owner Pacific Gas and Electric Company 77 Beale Street, San Francisco, CA 94106 Date July 7, 2004 Sheet I
of 2
Unit I
- 2. Plant Diablo Canyon Power Plant P.O. Box 56, Avila Beach, CA 93424
- 3. Work Performed by Owner See Above Repair Org. P.O. No., Job No., etc.
- 4. Identification of System Chemical and Volume Control System (08)
- 5. (a) Applicable Construction Code (See Work Order) 19 _
Edition Addenda, Code Cases N/A (b) Applicable Edition of Section XI Utilized for Repairs or Replacements -
- 1989, No Addenda, Code Case N-416-1
- 6. Identification of components Repaired or Replaced, and Replacement Components.
ASME NameOr Nameo f
Manufactures Nat'lrk Order Other Year Repaired Code Component anufacture Ident.
Built Replaced, or Stamped NaeoNaeofSra.
b.N o
Line No Bit Replacement (Yes or CompnentManuactueNNo CVCS-1-8479B Anchor Darling 961048-1 N/A C0178787 1468 N/A Replaced (3)
El No CCP 1-1 Pacific Pumps 45612 N/A C0181060 CCP 1-1 N/A Replaced(26)
E Yes CVCS-1-8387B Velan Valve EB312-1-4 N/A C0183811 1474 N/A Replaced (4) 0 Yes CVCS-I-8387C Velan Valve EB312-1-2 N/A C0183930 1475 N/A Replaced (4)
Yes CVCS-1-8387C Velan Valve EB312-1-2 N/A C0183930 1475 N/A Replaced (27) 0 Yes
- 7. Description of Work (3) Replaced Valve Internals (4) Replaced Valve (26) Replaced Outboard and Inboard Seal Plates (27) Replaced Reducing Inserts
- 8. Tests Conducted:
Hydrostatic E]
Pneumatic 0
Nominal Operating Pressure El Other Pressure PSIG Test Temp. _
OF 0
Pressure Test Conducted IAW Code Case N-416-1
- 9. Remarks CERTIFICATE OF COMPLIANCE We certify that the statements made in this repo Replacement comforms to Section X of the ASME Code. Signed EngineeringManager (Owner or Owner's Designee)
Patrick Nuger4 (Title)
(Date)
CERTIFICATE OF INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of California, employed by HSBCT of Hartford, CT have inspected the Replacement described in this Report on 4f
, 20 Cp$
and state that to the best of my knowledge and belief, this repair or replacement has been constructed in accordance with Secti6n XI of the ASME Code. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair or replacement described in this Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injuim r property deage or loss of any kind arising from or connected with this inspection.
6 _S,>6t Inspector
/t4?1a~t3/, 2cav Commissions CA 1828-NB9990 A.N.I.C 1M~i~y D. Kim (Title)
YDate)
/
(State or Province, National Board)
Note: Supl1rmental sheets in the form of lists, sketches, or drawings may be used provided (1) size is 8 12 x 1I1 in., (2) information in items I through 4 on this data report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
FORM NIS-2 OWNER'S REPORT OF REPAIR OR REPLACEMENT As Rcquired by the Provisions of ASME Code Section XI
- 1. Owner Pacific Gas and Electric Company
- 2. Plant 77 Beale Street, San Francisco, CA 94106 Diablo Canyon Power Plant P.O. Box 56, Avila Beach, CA 93424 Date July 7, 2004 Sheet 2
of 2
Unit I
- 3. Work Performed by Owner See Above Repair Org. P.O. No., Job No.. etc.
- 4. Identification of System Chemical Volume Control System (08)
- 5. (a) Applicable Construction Code See Work Order 19 _
Edition (b) Applicable Edition of Section XI Utilized for Repairs or Replacements -
Addenda, Code Cases N/A
- 1989, No Addenda, Code Case N-416-1
- 6. Identification of components Repaired or Replaced, and Replacement Components.
NmoNaef Manufacture Nat'l WVork Other fer Repaired 2
CoASe Name Of Name Or Serial bd. No IOrde Ide NoBitk
- ear c
St ampeds r Component Manufacture No.ia Ni.
o Ordr.e Built Replaced, or StaCode N.N.Line No Replacement
"(Yes or No)
Line-58 PG&E N/A NIA CO 189019 58 N/A Replaced (6) a l
No CVCS-1-RV-8117 Crosby Valve N69972-N/A R0215275 4002 N/A Replaced (4) 0 No 00-0005 CVCS-1-RV-8121 Crosby Valve N69964-N/A R0223051 62 N/A Replaced (4) 0 No 00-0002 CVCS-1-8479B Velan Valve 961046-1 N/A C0188862 1468 N/A Replaced (4) 2 Yes D
OEl El E l
-=
-0
- 7. Remarks (6 )Replaced Flange Bolting (4) Replaced Valve (Applicable Manufacturer's Data Reports to be Attached)
FORM NIS-2 OWNER'S REPORT OF REPAIR OR REPLACEMENT As Required by the Provisions of ASME Code Section XI
- 1. Owner Pacific Gas and Electric Company 77 Beale Street, San Francisco, CA 94106
- 2. Plant Diablo Canyon Power Plant Date July 7, 2004 Sheet I
of I
Unit I
P.O. Box 56, Avila Beach, CA 93424
- 3. Work Performed by Owner See Above Repair Org. P.O. No., Job No., etc.
- 4. Identification of System Chemical and Volume Control System (08)
- 5. (a) Applicable Construction Code (See Work Order) 19 _
Edition (b) Applicable Edition of Section Xl Utilized for Repairs or Replacements -
Addenda, Code Cases N/A
- 1989, No Addenda, Code Case N-416-1
- 6. Identification of components Repaired or Replaced, and Replacement Components.
ASME Name of Name O
Manufactures at'I
\\'ork Order Other i'ear Repaired Code Serial IIdent.
Repaeo tme Component Manufacture bd. No No.
Line No Built Replacedent t(Yme or No)22-212SL Pacific Scientific 23101 N/A C0182773 54 N/A Replaced (10) a Yes 73-82 PG&E N/A N/A C0188862 1468 N/A Replaced (32)
No
- 7. Description of Work (10) Replaced Snubber (32) Deleted Pipe Support
- 8. Tests Conducted:
Hydrostatic al Pneumatic E
Nominal Operating Pressure E Other Pressure PSIG Test Temp. _
'F EJ Pressure Test Conducted IAW Code Case N-416-1
- 9. Remarks CERTIFICATE OF COMPLIANCE We certify that the statements made in this repis Replacement comforms to Section XI of the ASME Code. Signed PC-r e
m Engineering Manager Y/N Ar, (Owner or Owner's Designee)
Patrick N 'ent (Title)
(Date)
CER IFICATE OF INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of California, employed by HSBCT of Hartford, CT have inspected the Replacement described in this Report on
,cc t3l 20 ael and state that to the best of my knowledge and belief, this repair or replacement has been constructed in accordance with Sectidn XI of the ASME Code. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair or replacement described in this Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal inju r proprty d,<ge or loss of any kind arising from or conne ted with this inspection.
Inspector 2Z/,
6y Commissions CA 1828 -NB 9990 A.N.I.C Gnyt D. Kim (Title)
(Kate)
(State or Province, National Board)
Note: Suppmental sheets in the form of lists, sketches, or drawings may be used provided (I) size is 8 1/2 x II in., (2) information in items I through 4 on this data report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
FORM NIS-2 OWNER'S REPORT OF REPAIR OR REPLACEMENT As Required by the Provisions of ASME Code Section XI
- 1. Owner Pacific Gas and Electric Company
- 2. Plant 77 Beale Street, San Francisco, CA 94106 Diablo Canyon Power Plant P.O. Box 56, Avila Beach, CA 93424 Date July 7, 2004 Sheet I
of 2
Unit I
- 3. Work Performed by Owner See Above Repair Org. P.O. No., Job No., etc.
- 4. Identification of System Safety Injection System (09)
- 5. (a) Applicable Construction Code (See Work Order) 19 Edition (b) Applicable Edition of Section Xl Utilized for Repairs or Replacements -
Addenda, Code Cases N/A
- 1989, No Addenda, Code Case N-416-1
- 6. Identification of components Repaired or Replaced, and Replacement Components.
ASMIE Manufactures Na' okOdrOther Yer Repaired Code Serial I
Ident.
Replaced,or Stapd Component Manufacture No.
bd. No No.
LnNo Built Replaceden or(Stmed o
No)
SI-1-8805A Anchor Darling 6820-2-13 N/A C0174231 1987 N/A Replaced (5)
E Yes S-1-241 Contromatics N/A N/A C0179410 3136 N/A Replaced (29)
ED No Spool Piece PG&E N/A N/A C0182524 3136 N/A Replaced (30)
No SI-1-8821A Velan Valve 51 N/A C0188201 3849 N/A Replaced (3 1)
El Yes SI-l-8821B Velan Valve 25 N/A C0188201 3850 N/A Replaced (3 1)
E Yes
- 7. Description of Work (5) Replaced Bonnet Bolting (29) Replaced Valve with Blind Flange (30)1nstalled Temperary Spool Piece (3 1)Welded Threaded Yoke to Press. Boundary (Bonnet)
- 8. Tests Conducted:
Hydrostatic El Pneumatic 3 Nominal Operating Pressure El Other Pressure PSIG Test Temp.
°_ 1F El Pressure Test Conducted IAW Code Case N-416-1
- 9. Remarks
CERTIFICATE OF COMPLIANCE We certify that the statements made in this repypare corre pa t Replacement comforms to Section Xl of the ASME Code. Signed f 1tt Engineering Manager 7/;
/o0'-
(Owner or Owner's Designee)
Patrick Nugint (Title)
(Date)
CERTIFICATE OF INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of California.
employed by HSBCT of Hartford, CT have inspected the Replacement described in this Report on Zkmt-3
,20 C'5 and state that to the best of my knowledge and belief, this repair or replacement has been constructed in acqrdance with Section Xl of the ASME Code. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair or replacement described in this Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury,r property dar5Ze or loss of any kind arising from or connected with this inspection.
-1L 6-1 Inspector 2J atz X, 1
27.OO4 Commissions CA 1828 -NB 9990 A.N.I.C
'l-wdny D. Kim-(Title)
_iate)
(State or Province, National Board)
Note: Suppremental sheets in the form of lists, sketches, or drawings may Lie used provided (1) size is 8 I12 x I I in., (2) information in items I through 4 on this data report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
FORM NIS-2 OWNER'S REPORT OF REPAIR OR REPLACEMENT As Required by the Provisions of ASME Code Section XI I. Owner Pacific Gas and Electric Company 77 Beale Street, San Francisco, CA 94106
- 2. Plant Diablo Canyon Power Plant P.O. Box 56, Avila Beach, CA 93424 Date July 7, 2004 Sheet 2
of 2
Unit I
- 3. Work Performed by Owner See Above Repair Org. P.O. No., Job No., etc.
- 4. Identification of System Safety Injection System (09)
- 5. (a) Applicable Construction Code See Work Order 19 _
Edition (b) Applicable Edition of Section XI Utilized for Repairs or Replacements -
Addenda. Coi
- 1989, No de Cases N/A Addenda, Code Case N-416-1
- 6. Identification of components Repaired or Replaced, and Replacement Components.
amanurature Work Other Repaired 7 ASINE Naanufarnctureia Nat'l Order Ident.
Built Replaced, or Code Nampoenot Namu ue ofW~t
- b. No Buear r
Stamped Component Manufacture No.
No.
Line No Replacement (Yes or No)
Sl-1-8953A Rockwell Int.
NF N/A C0188842 N/A N/A Replaced (32) 0 No SI-l-RV-SI-I-RV-8856B Crosby Valve 8856A-N/A R0223038 119 N/A Replaced (4)
E No P G E V
a l v e
_ _ 2 7 _ ()
SI-1-8949C Velan Valve NF N/A C0183287 237 N/A Repaired (33) 0 No SI-1-8949A Velan Valve NF N/A C0180073 235 N/A Repaired (33) 0 No
.5.-
O5_
=__
O 0
El, O_
- 7. Remarks (4) Replaced Valve (Applicable Manufacturer's Data Repwut to be Attached)
(32) Tack Welds on Valve Bonnet (33) Machined Disc
FORM NIS-2 OWNER'S REPORT OF REPAIR OR REPLACEMENT As Required by the Provisions of ASME Code Section Xl
- 1. Owner Pacific Gas and Electric Company
- 2. Plant 77 Beale Street, San Francisco, CA 94106 Diablo Canyon Power Plant P.O. Box 56, Avila Beach, CA 93424 Date July 7, 2004 Sheet I
of 2
Unit I
- 3. Work Performed by Owner See Above Repair Org. P.O. No., Job No., etc.
- 4. Identification of System Safety Injection System (09)
- 5. (a) Applicable Construction Code (See Work Order) 19 Edition (b) Applicable Edition of Section Xi Utilized for Repairs or Replacements -
Addenda, Code Cases N/A
- 1989, No Addenda, Code Case N-416-1
- 6. Identification of components Repaired or Replaced, and Replacement Components.
ASME Manufactures Other Repaired
- Cod, Nameor Nameof b
na Nat'l Mork Ordr Y~lher
\\car Rpae~r g
A:I Component Manufacture Serial WNaNo N~o.'re Ident.
Built Replaced, or Stamped Nameor.
Namof bd. No No.
Line No Built Replacement t
(Yes or
-No) 11-81SL Pacific Scientific 304 N/A C0182727 3845 N/A Replaced (I0)
No 56-13 PG&E N/A N/A C0188291 1994 N/A Replaced (17) l No 2156-109 PG&E N/A N/A C0188293 1991 N/A Replaced (32)
No 2156-81 PG&E N/A N/A C0188295 1992 N/A Replaced (17)
E No 56-26 PG&E N/A N/A C0188299 1994 N/A Replaced (17)
E No
- 7. Description of Work (10) Replaced Snubber (17) Modified Suppport (32) Deleted Support
- 8. Tests Conducted:
Hydrostatic El Pneumatic El Nominal Operating Pressure El Other Pressure PSIG TestTemp.
°_
OF El Pressure Test Conducted lAW Code Case N-416-1
- 9. Remarks CERTIFICATE OF COMPLIANCE We certify that the statements made in this reporta corr e
Replacement comforms to Section XI of the ASME Code. Signed 64=1 Engineering Manager
-8/31( ID (Owner or Owner's Designee)
Patrick N1 nt (Title)
(Date)
CERTIFICATE OF INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of California, employed by HSBCT of Hartford, CT have inspected the Replacement described in this Report on Aqq t31,20 0IV and state that to the best of my knowledge and belief, this repair or replacement has been constructed in acc rdance with Sectiog XI of the ASME Code. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair or replacement described in this Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injuryW property d ge or loss of any kind arising from or connected with this inspection.
_,S Inspector act3/
2oe Commissions CA 1828 - NB 9990 A.N.I.C lKpeny D. Kiim (Title)
,(Date)
(State or Province, National Board)
Note: Supkmental sheets in the form of lists, sketches, or drawings may be used provided (I) size is 8 1/2 x II in., (2) information in items I through 4 on this data report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
FORM NIS-2 OWNER'S REPORT OF REPAIR OR REPLACEMENT As Required by the Provisions of ASME Code Section XI
- 1. Owner Pacific Gas and Electric Company 77 Beale Street, San Francisco, CA 94106
- 2. Plant Diablo Canyon Power Plant P.O. Box 56, Avila Beach, CA 93424 Date July 7, 2004 Sheet 2
of 2
Unit I
- 3. Work Performed by
- Owner See Above Repair Org. P.O. No., Job No., etc.
- 4. Identification of System Safety Injection System (09)
- 5. (a) Applicable Construction Code See Work Order 19 Edition (b) Applicable Edition of Section XI Utilized for Repairs or Replacements -
Addenda, Code Cases N/A
- 1989, No Addenda, Code Case N-416-1
- 6. Identification of components Repaired or Replaced, and Replacement Components.
Manufacture NaICokOte ASNIE Name Or NameOf Nat'l Work Ote ear Repaired Code NmofNmof Serial bN O
rdBuilt
.Replaced, or
-~
Cd Component Manufacture No.
No.
Line No Replacement ores or No) 56-27 PG&E N/A N/A C0188300 1994 N/A Replaced (17) 0 No 56-28 PG&E N/A N/A C0188302 1991 N/A Replaced (17)
El No 56-20 PG&E N/A N/A C0188304 1991 N/A Replaced (17)
D J
No
=_
-0 7__Remar s_17_Mo_
dified.
0u (Applicable Manufacturer's Data Reports to be Antachcd)
FORM NIS-2 OWNER'S REPORT OF REPAIR OR REPLACEMENT As Required by the Provisions of ASME Code Section Xi
- 1. Owner Pacific Gas and Electric Company 77 Beale Street, San Francisco, CA 94106
- 2. Plant Diablo Canyon Power Plant Date July 7, 2004 Sheet I
of I
Unit I
P.O. Box 56, Avila Beach, CA 93424
- 3. Work Performed by Owner See Above Repair Org. P.O. No., Job No., etc.
- 4. Identification of System Component Cooling Water System (14)
- 5. (a) Applicable Construction Code (See Work Order) 19 _
Edition (b) Applicable Edition of Section Xl Utilized for Repairs or Replacements -
Addenda, Code Cases N/A
- 1989, No Addenda, Code Case N-416-1
- 6. Identification of components Repaired or Replaced, and Replacement Components.
ASINE NamcOf Nameo f M anuractures Nat'l Work Order Other Year Repaired Code Component Manufacture N.a bd. No No.
Ident B uilt Replaced, or Stamped No)
CCW-1-585 Crane Nuclear D0649 N/A C0175757 180 N/A Replaced (4)
Yes Line-3291 PG&E N/A N/A C0188624 3291 N/A Replaced (33) 0 No
- 7. Description of Work (4) Replaced Valve (32) Cut and Rewelded to Restore Alignment Using New Material
- 8. Tests Conducted:
Hydrostatic El Pneumatic 0
Nominal Operating Pressure El Other Pressure PSIG Test Temp.
IF I
Pressure Test Conducted IAW Code Case NA416-1
- 9. Remarks CERTIFICATE OF COMPLIANCE We certify that the statements made in this report s
Replacement comforms to Section XI of the ASME Code. Signed Engineering Manager a/, A/cbL (Owner or Owner's Designee)
Pat nt (Title)
(Date)
CERI 'ICATE OF INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of California, employed by HSBCT of Hartford, CT have inspected the Replacement described in this Report on A
c 3I, 20 O0 l and state that to the best of my knowledge and belief, this repair or replacement has been constructed in accoidance with Section XI of the ASME Code. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair or replacement described in this Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property dpge or loss of any kind arising from or connected with this inspection.
Inspector
/3 C/.Zom Commissions CA 1828 - NB 9990 A.N.I.C ny D. Kifn (Title)
(pate)
(State or Province, National Board)
Note: Sup mental sheets in the form of lists, sketches, or drawings may be used provided (1) size is 8 1/2 x 1 1 in., (2) information in items I through 4 on this data report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
FORM NIS-2 OWNER'S REPORT OF REPAIR OR REPLACEMENT As Required by the Provisions of ASME Code Section Xl
- 1. Owner Pacific Gas and Electric Company 77 Beale Street, San Francisco, CA 94106
- 2. Plant Diablo Canyon Power Plant P.O. Box 56, Avila Beach, CA 93424 Date July 7, 2004 Sheet I
of I
Unit I
- 3. Work Performed by Owner See Above Repair Org. P.O. No., Job No., etc.
- 4. Identification of System Component Cooling Water System (14)
- 5. (a) Applicable Construction Code (See Work Order) 19 Edition (b) Applicable Edition of Section Xl Utilized for Repairs or Replacements -
Addenda, Code Cases N/A
- 1989, No Addenda, Code Case N.416-1
- 6. Identification of components Repaired or Replaced, and Replacement Components.
ASME amlanuractures Nat'l Work Order Other eear Rpaired Code Name or Name oreia d Not' N~or LinrNdRplremnteareo Component Manuracture.
No No..
dttBuilt Replaced, or tiStamped No)63-28R PG&E N/A N/A C0188586 3291 N/A Replaced (9)
El
- 7. Description of Work (9) Replaced Support Parts
- 8. Tests Conducted:
Pneumatic a
Nominal Operating Pressure El Other Pressure PSIG Test Temp.
IF E] Pressure Test Conducted IAW Code Case N-416-1
- 9. Remarks CERTIFICATE OF COMPLIANCE We certify that the statements made in this repo r e corr his Replacement comforms to Section Xl of the ASME Code. Signed Engineering Manager
/ 31 D0 (Owner or Owner's Designee)
Patrick N nt (Title)
(Date)
CER;FICATE OF INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of California, employed by HSBCT of Hartford, CT have inspected the Replacement described in this Report on Au,;31, 20 L' i and state that to the best of my knowledge and belief, this repair or replacement has been constructed in accordance wth Sectidn Xl of the ASME Code. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair or replacement described in this Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injuy or property,dpmage or loss of any kind arising from or connected with this inspection.
Inspector A14ptd*31, t3 4O Commissions CA 1828 -NB 9990 A.N.L.C Knny D. Kim (Title)
(Date)
(State or Province, National Board)
Note: Supplemental sheets in the form of lists, sketches, or drawings may be used provided (1) size is 8 1/2 x 1 1 in., (2) information in items I through 4 on this data report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
FORM NIS-2 OWNER'S REPORT OF REPAIR OR REPLACEMENT As Required by the Provisions ofASME Code Section XI
- 1. Owner Pacific Gas and Electric Company 77 Beale Street, San Francisco, CA 94106
- 2. Plant Diablo Canyon Power Plant P.O. Box 56, Avila Beach, CA 93424 Date July 7, 2004 Sheet I
of I
Unit I
- 3. Work Performed by Owner See Above Repair Org. P.O. No., Job No., etc.
- 4. Identification of System Liquid Radwaste System (19)
- 5. (a) Applicable Construction Code (See Work Order) 19 Edition Addenda, Code Cases N/A (b) Applicable Edition of Section XI Utilized for Repairs or Replacements -
- 1989, No Addenda, Code Case N.416-1
- 6. Identification of components Repaired or Replaced, and Replacement Components.
ASNIE N eoNaef Manufactures Na' okOdr Other Yer Repaired 5-Code Namepof Nufacmure Serial bNdo NorkOrder Ident.
Buil Replaced, or B
Stamped Cmoetanacueo.
bNoNo.
Line No Blt Replacement (Yes or No)
LWS-1-FCV-501 Contromatics, Inc NF N/A R0227773 749 N/A Replaced (3)
D No
-D
=
- 7. Description of Work (3) Replaced Valve Internals
- 8. Tests Conducted:
Pneumatic E
Nominal OperatingPressure El Other Pressure PSIG Test Temp.
OF EU Pressure Test Conducted IAW Code Case N4 16-1
- 9. Remarks CERTIFICATE OF COMPLIANCE We certify that the statements made in this report arporrect a1id >
Replacement comforms to Section XI of the ASME Code. Signed tn Engineering Manager 263v Si (Owner or Owner's Designee)
Patrick Nugeng (Title)
(Date)
CERTIFIATE OF INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of California, employed by HSBCT of Hartford, CT have inspected the Replacement described in this Report on
, 20 and state that to the best of my knowledge and belief, this repair or replacement has been constructed in accodance with Sectiofi Xl of the ASME Code. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair or replacement described in this Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury gr property dprge or loss of any kind arising from or connected with this inspection.
AS Inspector
- 37.
ZcM Commissions CA 1828 - NB 9990 A.N.I.C K
y D. Kifn (Title) ff (Date)
(State or Province, National Board)
Note: Sup nental sheets in the form of lists, sketches, or drawings may be used provided (I) size is 8 12 x 11 in., (2) information in items I through 4 on this data report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
FORM NIS-2 OWNER'S REPORT OF REPAIR OR REPLACEMENT As Required by the Provisions of ASME Code Section XI
- 1. Owner Pacific Gas and Electric Company 77 Beale Street, San Francisco, CA 94106
- 2. Plant Diablo Canyon Power Plant P.O. Box 56, Avila Beach, CA 93424 Date July 7, 2004 Sheet I
of I
Unit I
- 3. Work Performed by Owner See Above Repair Org. P.O. No., Job No.. etc.
- 4. Identification of System Liquid Radwaste System (19)
- 5. (a) Applicable Construction Code (See Work Order) 19 _
Edition (b) Applicable Edition of Section Xl Utilized for Repairs or Replacements -
Addenda, Code Cases N/A
- 1989, No Addenda, Code Case N-416-1
- 6. Identification of components Repaired or Replaced, and Replacement Components.
ASME Name of Name of Manuacturs Nat'l Work Order Oether ear Repared ode Component Manufacture Serial bd. No No.
Ident.
Built Replaced, or Stamped No.
Line No Replacement g
(Yes or No) 2161-56 PG&E N/A N/A C0188233 749 N/A Replaced (17) a No
- 7. Description of Work (17) Modified Suppport
- 8. Tests Conducted:
Hydrostatic El Pneumatic El Nominal Operating Pressure Cl Other Pressure PSIG Test Temp.
IF E1 Pressure Test Conducted IAW Code Case N-416-1
- 9. Remarks CERTIFICATE OF COMPLIANCE We certify that the statements made in this reportpe corri Replacement comforms to Section XI of the ASME Code. Signed 14 Engineering Manager a
I'/ i (Owner or Owner's Dcsignee)
Patrick Nugft (Title)
(Date)
CERTIFICATE OF INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of California, employed by HSBCT of Hartford, CT have inspected the Replacement described in this Report on 6A z4$c~3, 20_0_Xi and state that to the best of my knowledge and belief, this repair or replacement has been constructed in acicolance with SectioKXI of the ASME Code. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair or replacement described in this Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injur pro erty age or loss of any kind arising from or connected with this inspection.
ArZ Inspector 3a/et3/.
.zoo Commissions CA 1828-NB 9990 A.N.I.C ny D. Kim (Title)
(Date)
(State or Province, National Board)
Note: Sup emental sheets in the form of lists, sketches, or drawings may be used provided (1) size is 8 1/2 x I I in., (2) information in items I through 4 on this data report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
FORM NIS-2 OWNER'S REPORT OF REPAIR OR REPLACEMENT As Required by thc Provisions of ASME Code Section Xi
- 1. Owner Pacific Gas and Electric Company 77 Beale Street, San Francisco, CA 94106
- 2. Plant Diablo Canyon Power Plant P.O. Box 56, Avila Beach, CA 93424 Date July 7,2004 Sheet I
of I
Unit I
- 3. Work Performed by Owner See Above Repair Org. P.O. No., Job No., etc.
- 4. Identification of System Containment Structure (45)
- 5. (a) Applicable Construction Code (See Work Order) 19 Edition (b) Applicable Edition of Section XI Utilized for Repairs or Replacements -
Addenda, Code Cases N/A
- 1989, No Addenda, Code Case N-416-1
- 6. Identification of components Repaired or Replaced, and Replacement Components.
ASMIE NmoNaef Manuractures Na' okOdr Other Yer Repaired Code Component anfactureIdent Replaced, or l
Stamped Nao.NaefSeil bdN o
Line No Bit Replacement (Yes or GRNo) 6E General Electric 6.343.315 N/A C0184590 N/A N/A Replaced (34) 0 Yes 6E General Electric 6.343.315 N/A C0184810 N/A N/A Replaced (35) 0 Yes 6E General Electric 6.343.315 N/A COI 8481 1 N/A N/A Rcpl aced (36) 0 Yes MP63 PG&E NF N/A C0177589 647 N/A Replaced (6) 0 No
- 7. Description of Work (6 )Replaced Flange Bolting (34) Added Weld Attachments to Containment Liner (35) Installed GE Enclosure Ring (36) Installed Conax Penetration
- 8. Tests Conducted:
Hydrostatic El Pneumatic El Nominal Operating Pressure El Other Pressure PSIG Test Temp.
°_
OF El Pressure Test Conducted IAW Code Case N416-1
- 9. Remarks CERTIFICATE OF COMPLIANCE We certify that the statements made in this rep pare an Replacement comforms to Section XI of the ASME Code. Signed I
l E
Engineering Manager I/3I 10 (Owner or Owner's Designee)
Patrick Ny£ nt (Title)
(Date)
CERTWICATE OF INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of California, employed by HSBCT of Hartford, CT have inspected the Replacement described in this Report on Z
i53/,20 0 ;
and state that to the best of my knowledge and belief, this repair or replacement has been constructed in accrdance with Sect io Xl of the ASME Code. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair or replacement described in this Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal inju;Worproperty,amage or loss of any kind arising from or connected with this inspection.
Inspector
/ufac&3/,
- Zoo g Commissions CA 1828 -NB 9990 A.N.I.C
)Znny D. Kim (Title)
/ (Date)
/
(State or Province, National Board)
Note: S emental sheets in the form of lists, sketches, or drawings may be used provided (1) size is 8 1/2 x I I in., (2) information in items I throug1f 4 on this data report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
FORM NIS-2 OWNER'S REPORT OF REPAIR OR REPLACEMENT As Required by the Provisions of ASME Code Section XI
- 1. Owner Pacific Gas and Electric Company
- 2. Plant 77 Beale Street, San Francisco, CA 94106 Diablo Canyon Power Plant P.O. Box 56, Avila Beach, CA 93424 Date July 7, 2004 Sheet I
of I
Unit I
- 3. Work Performed by Owner See Above Repair Org. P.O. No., Job No., etc.
- 4. Identification of System Low Level Measurement(48)
- 5. (a) Applicable Construction Code (See Work Order) 19 Edition Addenda, Code Cases N/A (b) Applicable Edition of Section XI Utilized for Repairs or Replacements -
- 1989, No Addenda, Code Case N-416-1
- 6. Identification of components Repaired or Replaced, and Replacement Components.
N m ofN m of Manufactures N'
'k OdrOther Repaired Code Comeo l
Naneor Serial Nat' WorkOrder Ident.
Year Replaced, or l
Stamped Component Manuracture No.
bW.
No No.
Line No Built Replacement (Yes or No)
Reactor Vessel Seal Table (Unit-)
Westinghouse N/A N/A C0187978 N/A N/A Replaced (36)
No
- 7. Description of Work (36) Shorten Incore Flux Thimbles E-5, E-9, F-8, H-13, H-15, N4, and N-14
- 8. Tests Conducted:
Hydrostatic El Pneumatic 0
Nominal OperatingPressure El Other Pressure PSIG TestTemp.
IF 0 Pressure Test Conducted IAW Code Case N-416-1
- 9. Remarks CERTIFICATE OF COMPLIANCE We certify that the statements made in this reporeorr eis Replacement comforms to Section Xl of the ASME Code. Signed Engineering Manager 1/,l/D 7 (Owner or Owner's Designee)
Patrick Nugei (Title)
(Date)
CERTIFICATE OF INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of California, employed by HSBCT of Hartford, CT have inspected the Replacement described in this Report on
,20 20 and state that to the best of my knowledge and belief, this repair or replacement has been constructed in accordance with Section XI of the ASME Code. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair or replacement described in this Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property dage or loss of any kind arising from or connected with this inspection.
M.
Inspector 3'!,
szor Commissions CA 1828-NB9990 A.N.I.C Kelny D. Kim (Title)
V(Date)
(State or Province, National Board)
Note: Suppkmental sheets in the form of lists, sketches, or drawings may be used provided (1) size is 8 1/2 x II in., (2) information in items 1 through 4 on this data report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
FORM NIS-2 OWNER'S REPORT OF REPAIR OR REPLACEMENT As Required by the Provisions of ASME Code Section XI
- 1. Owner Pacific Gas and Electric Company 77 Beale Street, San Francisco, CA 94106
- 2. Plant Diablo Canyon Power Plant Date July 7, 2004 Sheet I
of I
Unit I
P.O. Box 56, Avila Beach, CA 93424
- 3. Work Performed by Owner See Above Repair Org. P.O. No., Job No., etc.
- 4. Identification of System Warehouse Spare Parts(85)
- 5. (a) Applicable Construction Code (See Work Order) 19 Edition (b) Applicable Edition of Section XI Utilized for Repairs or Replacements -
Addenda, Code Cases N/A
- 1989, No Addenda, Code Case N-416-1
- 6. Identification of components Repaired or Replaced, and Replacement Components.
AS.ME NameOf Name Manufactures at'l
% ork Order Other Year Repaired Code Component Manufacture No.
bd. No No.
Line No Built Replacedm (S ortampe No)
MU-0-976 Mission Drilling NF N/A C0167069 S/C 95-5436 N/A Replaced (37) l No MS-1-5167 Anchor Darling NF N/A C0177799 S/C 94-7105 N/A Repaired (38) l No
-0
- 7. Description of Work (37) Rebuilt Valve (38) Weld Repair to Resurface Worn Discs
- 8. Tests Conducted:
Hydrostatic a1 Pneumatic El Nominal Operating Pressure El Other Pressure PSIG Test Temp. _
'F E]
Pressure Test Conducted IAW Code Case N416-1
- 9. Remarks CERTIFICATE OF COMPLIANCE We certify that the statements made in this repor e cjmmand this Replacement comforms to Section Xl of the ASME Code. Signed l
Engineering Manager W/3f/DA (Owner or Owner's Designee)
Patrick jugent (Title)
(Date)
CERTIFICATE OF INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of California, employed by HSBCT of Hartford, CT have inspected the Replacement described in this Report on A
, 20 C I and state that to the best of my knowledge and belief, this repair or replacement has been constructed in accdrdance with SectionXI of the ASME Code. By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair or replacement described in this Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal inju or property d ge or loss of any kind arising from or connected with this inspection.
720-ZA Inspector f1a;3/.
zLo-~
Commissions CA 1828 -NB 9990 A.N.I.C JoCnny D. Kim (Title) 41 (Date)
(State or Province, National Board)
Note: Supemental sheets in the form of lists, sketches, or drawings may be used provided (I) size is 8 1/2 x II in., (2) information in items I through 4 on this data report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.
SECTION H CONTAINMENT EXAMINATIONS
PaG&E DIABLO CANYON POWER PLANT - UNIT I SECOND INTERVAL, THIRD PERIOD, FIRST REFUELING OUTAGE REPORT (1R12)
MAJOR ITEM: CONTAINMENT EXAMINATIONS CONTAINMENT EXAMS PAGE 1 of I CATEGORY COMPONENT/
DESCRIPTION LINE COMPONENT NO.
TYPE DATE COMMENTS RESULTS E-C E4.12 Surface Area Grid RHR Sump Liner UT 4-9-04 NRI E-G E8.10 Bolted Connections Bolted Connections Bolted Connections Bolted Connections Bolted Connections Equipment Hatch (1/3)
Pen. #58 (Mini Equipment) (1/3)
Pen. f60 (Mini Equipment) (1/3)
Pen. #63 (Vacuum Relief) (1/3)
Pen. #64 (Fuel Transfer Tube)
(1/3)
Bolts VT-I 4-27-04 NRI Bolts VT-I 4-27-04 NRI Bolts VT-I 4-27-04 NRI Bolts VT-I 4-27-04 NRI Bolts VT-I 4-27-04 NRI
SECTION I AUGMENTED EXAMINATIONS
PG&E DIABLO CANYON POWER PLANT - UNIT 1 SECOND INTERVAL, THIRD PERIOD, FIRST REFUELING OUTAGE REPORT (1R12)
MAJOR ITEM: AUGMENTED EXAMINATIONS CONTAINMENT EXAMS PAGE 1 of l CATEGORY COMPONENT /
WELD OR EXAM EXAM ITEM DESCRIPTION LINE COMPONENT NO.
TYPE DATE COMMENTS RESULTS Augmented RC Pump 1-2 Flywheel RC Pump 1-2 Flywheel RCP 1-2 Flywheel
. Inner Half Radius UT 4-6-04 NRI I