CY-05-195, Clarification to License Amendment No. 202 and the Associated Safety Evaluation Report Regarding the License Termination Plan

From kanterella
Jump to navigation Jump to search
Clarification to License Amendment No. 202 and the Associated Safety Evaluation Report Regarding the License Termination Plan
ML052780342
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 09/29/2005
From: Norton W
Connecticut Yankee Atomic Power Co
To:
Document Control Desk, NRC/FSME
References
CY-05-195
Download: ML052780342 (4)


Text

CONNECTICUT YANKEE ATOMIC POWER COMPANY HADDAM NECK PLANT 362 INJUN HOLLOW ROAD

  • EAST HAMPTON, CT 06424-3099 Docket No. 50-213 CY-05-195 Re: 10CFR50.90 U. S. Nuclear Regulatory Commission SEP 2 9 2005 Attention: Document Control Desk Washington, DC 20555 Haddam Neck Plant Clarification to License Amendment No. 202 and the Associated Safety Evaluation Report Reqardinq the License Termination Plan On August 19, 2005,(') the NRC issued Amendment No. 202 to Facility Operating License No. DPR-61 for the Haddam Neck Plant. A supporting Safety Evaluation Report (SER) was included. The License Amendment revised License Condition 2.C (7)to specify the proposed License Termination Plan (LTP) revision for the Haddam Neck Plant.

On August 22, 2005, CYAPCO verbally notified the NRC that to the License Amendment letter and the SER required a clarification. On September 13, 2005, CYAPCO and the NRC discussed our comments to Enclosure 1 and the SER statements.

CYAPCO hereby submits our clarifications regarding Enclosure 1 and the SER statements in Attachment 1.

If the NRC should have any questions regarding our comments, please contact Gerry van Noordennen at (860) 267-3938. No written response to this letter is requested.

1)' D. Gillen (NRC) letter to W. Norton (CYAPCO), "Issuance of Amendment No. 202," dated August 19, 2005.

Ars (nl

Document Control Center Document Control Center CY-05-195 / Page 2 Sincerely, CONNECTICUT YANKEE ATOMIC POWER COMPANY President Attachment cc: S. J. Collins, Region I Administrator M. T. Miller, Branch Chief, Decommissioning Branch, Region I T. B. Smith, Project Manager, Haddam Neck Plant Dr. E. L. Wilds, Jr., Director, CT DEP Radiation Division Subscribed and sworn before me this ck day of cap +/-.b . 2005

- ^ Notary Public My-Commission Expires ,a4 ....

MyC , mg

CY-05-1 95 Attachment 1 --

Haddam Neck Plant Clarification to License Amendment No. 202 and the Associated Safety Evaluation Report Regarding the License Termination Plan September 2005

Pocument Control Center v CY-05-195 / Attachment 1 NRC SE Statement Page No. Requiring Clarification CYAPCO Position Enclosure 1, Item 2 states "Accordingly the The proposed License Amendment request Item 2 license is amended by changes (application dated December 1, 2004) did not to the Technical Specifications as involve any changes to the Haddam Neck indicated in the attachment to Plant (HNP) Technical Specifications. Instead this license amendment". It the license amendment request consisted of further states that Paragraph changes to the methods included in the HNP 2.C.2 of Facility License License Termination Plan (use of Basement Operating License No. DPR-61 is Fill Model in lieu of a buried debris model to hereby amended to read as -calculate the future groundwater dose for- -

follows: "The Technical buried concrete and revised surface Specifications contained in contamination release limits for various piping Appendix A, as revised through sizes).

Amendment No. 202 are hereby incorporated in the license." CYAPCO has revised our controlled copies of the facility license to incorporate Amendment No. 202.

Enclosure 2, The second paragraph states in The assumed value for the porosity stated SER Section part, "The water activity was then should be 35% (Refer to Table F-1 of the HNP 2.2, Page 5 divided by water volume in the LTP and Page 20 of 38 of Attachment 2 of the backfill assuming a porosity of License Amendment request submittal dated 30%." December 1,2004).