Category:Letter type:BVY
MONTHYEARBVY 24-026, Pre-Notice of Disbursement from Decommissioning Trust2024-10-0202 October 2024 Pre-Notice of Disbursement from Decommissioning Trust BVY 24-024, Pre-Notice of Disbursement from Decommissioning Trust2024-07-30030 July 2024 Pre-Notice of Disbursement from Decommissioning Trust BVY 24-023, Pre-Notice of Disbursement from Decommissioning Trust2024-07-0202 July 2024 Pre-Notice of Disbursement from Decommissioning Trust BVY 24-022, Pre-Notice of Disbursement from Decommissioning Trust2024-05-30030 May 2024 Pre-Notice of Disbursement from Decommissioning Trust BVY 24-020, Biennial Update of Quality Assurance Program Manual2024-05-22022 May 2024 Biennial Update of Quality Assurance Program Manual BVY 24-019, 2023 Radiological Environmental Operating Report2024-05-0909 May 2024 2023 Radiological Environmental Operating Report BVY 24-017, Pre-Notice of Disbursement from Decommissioning Trust2024-05-0606 May 2024 Pre-Notice of Disbursement from Decommissioning Trust BVY 24-018, 2023 Radiological Effluent Release Report2024-05-0505 May 2024 2023 Radiological Effluent Release Report BVY 24-016, 2023 Individual Monitoring NRC Form 5 Report2024-04-18018 April 2024 2023 Individual Monitoring NRC Form 5 Report BVY 24-014, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-04-0101 April 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 24-015, Pre-Notice of Disbursement from Decommissioning Trust2024-04-0101 April 2024 Pre-Notice of Disbursement from Decommissioning Trust BVY 24-012, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-03-14014 March 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 24-011, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-03-0606 March 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 24-010, Pre-Notice of Disbursement from Decommissioning Trust2024-03-0505 March 2024 Pre-Notice of Disbursement from Decommissioning Trust BVY 24-009, Withdrawal of License Amendment Request to Add License Condition 3.K, License Termination Plan; Proposed Change No. 3172024-02-27027 February 2024 Withdrawal of License Amendment Request to Add License Condition 3.K, License Termination Plan; Proposed Change No. 317 BVY 24-007, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-02-26026 February 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 24-008, ISFSI, Annual Radioactive Effluent Release Report2024-02-26026 February 2024 ISFSI, Annual Radioactive Effluent Release Report BVY 24-006, Pre-Notice of Disbursement from Decommissioning Trust2024-02-0606 February 2024 Pre-Notice of Disbursement from Decommissioning Trust BVY 24-005, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-01-30030 January 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 24-004, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-01-23023 January 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 24-003, Nuclear Onsite Property Damage Insurance2024-01-0404 January 2024 Nuclear Onsite Property Damage Insurance BVY 24-001, Pre-Notice of Disbursement from Decommissioning Trust2024-01-0202 January 2024 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-030, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-12-20020 December 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 23-029, Proof of Financial Protection2023-12-12012 December 2023 Proof of Financial Protection BVY 23-028, Pre-Notice of Disbursement from Decommissioning Trust2023-11-28028 November 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-027, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-11-21021 November 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 23-026, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-11-13013 November 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 23-025, Pre-Notice of Disbursement from Decommissioning Trust2023-11-0202 November 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-023, License Amendment Request Addition of License Condition 3.K, License Termination Plan; Proposed Change No. 3172023-10-10010 October 2023 License Amendment Request Addition of License Condition 3.K, License Termination Plan; Proposed Change No. 317 BVY 23-022, Pre-Notice of Disbursement from Decommissioning Trust2023-08-23023 August 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-020, Pre-Notice of Disbursement from Decommissioning Trust2023-08-0202 August 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-021, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-08-0202 August 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 23-019, Update to 2022 Radiological Effluent Release Report2023-07-24024 July 2023 Update to 2022 Radiological Effluent Release Report BVY 23-018, Update to Nuclear Onsite Property Damage Insurance2023-07-12012 July 2023 Update to Nuclear Onsite Property Damage Insurance BVY 23-017, Pre-Notice of Disbursement from Decommissioning Trust2023-06-29029 June 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-016, 10 CFR 72.48 Report2023-06-0505 June 2023 10 CFR 72.48 Report BVY 23-015, Report of Investigation Pursuant to 1O CFR 20, Appendix G2023-06-0505 June 2023 Report of Investigation Pursuant to 1O CFR 20, Appendix G BVY 23-014, Pre-Notice of Disbursement from Decommissioning Trust2023-05-31031 May 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-013, 2022 Radiological Environmental Operating Report2023-05-10010 May 2023 2022 Radiological Environmental Operating Report BVY 23-011, 2022 Radiological Effluent Release Report2023-05-10010 May 2023 2022 Radiological Effluent Release Report BVY 23-012, Pre-Notice of Disbursement from Decommissioning Trust2023-05-0202 May 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-009, 2022 Individual Monitoring NRC Form 5 Report2023-04-24024 April 2023 2022 Individual Monitoring NRC Form 5 Report BVY 23-008, Pre-Notice of Disbursement from Decommissioning Trust2023-04-0606 April 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-006, Status of Decommissioning and Spent Fuel Management Fund for Year Ending 20222023-03-29029 March 2023 Status of Decommissioning and Spent Fuel Management Fund for Year Ending 2022 BVY 23-007, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-03-29029 March 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 23-005, Nuclear Onsite Property Damage Insurance2023-03-13013 March 2023 Nuclear Onsite Property Damage Insurance BVY 23-004, Pre-Notice of Disbursement from Decommissioning Trust2023-03-0202 March 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-003, Pre-Notice of Disbursement from Decommissioning Trust2023-01-31031 January 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 22-030, Documentary Evidence of Performance Bond2022-12-30030 December 2022 Documentary Evidence of Performance Bond BVY 22-028, Re Proof of Financial Protection2022-11-28028 November 2022 Re Proof of Financial Protection 2024-07-30
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARBVY 23-023, License Amendment Request Addition of License Condition 3.K, License Termination Plan; Proposed Change No. 3172023-10-10010 October 2023 License Amendment Request Addition of License Condition 3.K, License Termination Plan; Proposed Change No. 317 3F1120-02, and Crystal River Nuclear Plant - Application for Order Approving Indirect Transfers of Control of Licenses in Connection with Internal Corporate Reorganization2020-11-19019 November 2020 and Crystal River Nuclear Plant - Application for Order Approving Indirect Transfers of Control of Licenses in Connection with Internal Corporate Reorganization BVY 17-004, Technical Specifications Proposed Change No. 313: Revision to License and Permanently Defueled Technical Specifications to Reflect Permanent Removal of Spent Fuel from the Spent Fuel Pool2017-07-20020 July 2017 Technical Specifications Proposed Change No. 313: Revision to License and Permanently Defueled Technical Specifications to Reflect Permanent Removal of Spent Fuel from the Spent Fuel Pool BVY 17-022, License Amendment Request - Cyber Security Plan License Condition Removal Proposed Change No. 3162017-07-13013 July 2017 License Amendment Request - Cyber Security Plan License Condition Removal Proposed Change No. 316 BVY 17-005, Application for Order Consenting to Direct and Indirect Transfers of Control of Licenses and Approving Conforming License Amendment and Notification of Amendment to Decommissioning Trust Agreement2017-02-0909 February 2017 Application for Order Consenting to Direct and Indirect Transfers of Control of Licenses and Approving Conforming License Amendment and Notification of Amendment to Decommissioning Trust Agreement BVY 15-040, License Amendment Request - Revised Cyber Security Plan Implementation Schedule - Proposed Change No. 3112015-06-24024 June 2015 License Amendment Request - Revised Cyber Security Plan Implementation Schedule - Proposed Change No. 311 BVY 14-083, Technical Specifications Proposed Change No. 307, Revision to Technical Specification Administrative Controls for Permanently Defueled Condition - Supplement 32014-12-0505 December 2014 Technical Specifications Proposed Change No. 307, Revision to Technical Specification Administrative Controls for Permanently Defueled Condition - Supplement 3 BVY 14-062, Proposed Change No. 310 - Deletion of Renewed Facility Operating License Conditions Related to Decommissioning Trust Provisions2014-09-0404 September 2014 Proposed Change No. 310 - Deletion of Renewed Facility Operating License Conditions Related to Decommissioning Trust Provisions BVY 13-109, Cyber Security Plan Implementation Schedule, Proposed Change No. 3082013-12-19019 December 2013 Cyber Security Plan Implementation Schedule, Proposed Change No. 308 BVY 13-097, Proposed Change 306, Areva Document No. 32-9145461-001, Vynpp - Re-analysis of Ast/Fha Radiological Consequences with Open Containment2013-11-14014 November 2013 Proposed Change 306, Areva Document No. 32-9145461-001, Vynpp - Re-analysis of Ast/Fha Radiological Consequences with Open Containment ML13323A5182013-11-14014 November 2013 Technical Specifications Proposed Change No. 306 Eliminate Certain ESF Requirements During Movement of Irradiated Fuel BVY 12-084, License Amendment Request; Changes to 10CFR50.63 Licensing Basis2012-12-21021 December 2012 License Amendment Request; Changes to 10CFR50.63 Licensing Basis BVY 12-085, Technical Specifications Proposed Change No. 302 Inoperable Control Rods2012-12-17017 December 2012 Technical Specifications Proposed Change No. 302 Inoperable Control Rods BVY 12-018, Technical Specifications Proposed Change No. 299 Recirculation System Discharge Bypass Valve Change2012-04-17017 April 2012 Technical Specifications Proposed Change No. 299 Recirculation System Discharge Bypass Valve Change BVY 12-016, License Amendment Request to Revise License Renewal Commitments2012-03-12012 March 2012 License Amendment Request to Revise License Renewal Commitments BVY 12-006, Technical Specifications Proposed Change No. 298, Rod Worth Minimizer Bypass Allowance2012-02-0101 February 2012 Technical Specifications Proposed Change No. 298, Rod Worth Minimizer Bypass Allowance BVY 12-005, Technical Specifications Proposed Change No. 297, Suppression Chamber-Drywell Leak Rate Test Surveillance Frequency Change2012-02-0101 February 2012 Technical Specifications Proposed Change No. 297, Suppression Chamber-Drywell Leak Rate Test Surveillance Frequency Change BVY 11-085, Proposed Change No. 296, Steam Dryer License Condition Change2011-12-22022 December 2011 Proposed Change No. 296, Steam Dryer License Condition Change BVY 11-069, Technical Specifications Proposed Change No. 295 Proposed Emergency License Amendment for Single Loop Operation2011-09-29029 September 2011 Technical Specifications Proposed Change No. 295 Proposed Emergency License Amendment for Single Loop Operation BVY 10-059, Technical Specifications Proposed Change No. 294, Elimination of Provisions Allowing HPCI and RCIC Suctions to Be Aligned to the Suppression Pool2010-11-0808 November 2010 Technical Specifications Proposed Change No. 294, Elimination of Provisions Allowing HPCI and RCIC Suctions to Be Aligned to the Suppression Pool BVY 10-045, Technical Specifications Proposed Change No. 289 Suppression Chamber-Drywell Vacuum Breakers and Differential Pressure2010-08-19019 August 2010 Technical Specifications Proposed Change No. 289 Suppression Chamber-Drywell Vacuum Breakers and Differential Pressure BVY 10-036, Technical Specifications Proposed Change No. 292, License Amendment Withdrawal and Request - Cyber Security Plan2010-07-16016 July 2010 Technical Specifications Proposed Change No. 292, License Amendment Withdrawal and Request - Cyber Security Plan BVY 09-068, Technical Specifications Proposed Change No. 288 Scram Discharge Volume Vent and Drain Valves2009-12-0303 December 2009 Technical Specifications Proposed Change No. 288 Scram Discharge Volume Vent and Drain Valves BVY 09-063, Technical Specification Proposed Change No. 287 Safety Limit Minimum Critical Power Ratio Change2009-10-27027 October 2009 Technical Specification Proposed Change No. 287 Safety Limit Minimum Critical Power Ratio Change BVY 09-052, Technical Specifications Proposed Change No. 284 Change to Requirements for Inoperable Containment Isolation Valves2009-09-16016 September 2009 Technical Specifications Proposed Change No. 284 Change to Requirements for Inoperable Containment Isolation Valves BVY 09-051, Technical Specifications Proposed Change No. 285 Revision of High Radiation Area Controls2009-08-26026 August 2009 Technical Specifications Proposed Change No. 285 Revision of High Radiation Area Controls ML0912001622009-05-31031 May 2009 Safety Evaluation Report Related to the License Renewal of Vermont Yankee Nuclear Power Station Supplement 1 BVY 09-029, Technical Specifications Proposed Change No. 283 Change to Requirements for Performing 10 CFR 50, Appendix J, Type a Test2009-05-0505 May 2009 Technical Specifications Proposed Change No. 283 Change to Requirements for Performing 10 CFR 50, Appendix J, Type a Test BVY 09-012, Submittal of Proposed License Amendment for Technical Specifications No. 282, Revision of Drywell Vacuum Breaker Surveillance Requirements2009-02-24024 February 2009 Submittal of Proposed License Amendment for Technical Specifications No. 282, Revision of Drywell Vacuum Breaker Surveillance Requirements BVY 08-079, Technical Specifications Proposed Change No. 280, Supplement 1 Relocation of Reactor Building Crane Technical Specifications2008-10-31031 October 2008 Technical Specifications Proposed Change No. 280, Supplement 1 Relocation of Reactor Building Crane Technical Specifications BVY 08-055, Technical Specifications Proposed Change No. 277, License Amendment Request Application for Licensee Name Changes2008-09-30030 September 2008 Technical Specifications Proposed Change No. 277, License Amendment Request Application for Licensee Name Changes BVY 08-059, Technical Specifications Proposed Change No. 280 Relocation of Reactor Building Crane Technical Specifications2008-09-22022 September 2008 Technical Specifications Proposed Change No. 280 Relocation of Reactor Building Crane Technical Specifications BVY 08-052, Technical Specifications Proposed Change No. 278, Changes to Main Steam Isolation Valve Surveillance Requirements2008-09-22022 September 2008 Technical Specifications Proposed Change No. 278, Changes to Main Steam Isolation Valve Surveillance Requirements BVY 08-053, Technical Specifications Proposed Change No. 279 Sale or Lease of Property within the Exclusion Boundary2008-09-0404 September 2008 Technical Specifications Proposed Change No. 279 Sale or Lease of Property within the Exclusion Boundary BVY 08-001, Technical Specifications Proposed Change No. 273 Instrumentation Technical Specifications2008-02-12012 February 2008 Technical Specifications Proposed Change No. 273 Instrumentation Technical Specifications ML0806602032008-02-12012 February 2008 Vermont Yankee, Technical Specifications Proposed Change No. 273, Instrumentation Technical Specifications BVY 08-007, Technical Specification Proposed Change No. 276 Revision to TS Sections 3.3/4.3 for Control Rod System2008-02-0606 February 2008 Technical Specification Proposed Change No. 276 Revision to TS Sections 3.3/4.3 for Control Rod System ML0804202202008-02-0505 February 2008 Vermont Yankee - License Renewal Application, Amendment 35 ML0736502282007-12-11011 December 2007 (PA-LR) VY Response to RAI 4.3.3-2 BVY 07-056, Technical Specification Proposed Change No. 274, Changes to Technical Specifications for Emergency Diesel Generator Fuel Oil and Reactor Building Crane Surveillance Requirements2007-10-18018 October 2007 Technical Specification Proposed Change No. 274, Changes to Technical Specifications for Emergency Diesel Generator Fuel Oil and Reactor Building Crane Surveillance Requirements BVY 07-063, Technical Specifications Proposed Change No. 275 Primary Containment Oxygen Concentration and Drywell-to-Suppression Chamber Differential Pressure Limits2007-10-18018 October 2007 Technical Specifications Proposed Change No. 275 Primary Containment Oxygen Concentration and Drywell-to-Suppression Chamber Differential Pressure Limits BVY 07-018, License Renewal Application, Amendment 262007-03-23023 March 2007 License Renewal Application, Amendment 26 ML0702402042007-01-10010 January 2007 Email: (PA-LR) Other Word File ML0701105042007-01-0404 January 2007 Vermont Yankee - License Renewal Application, Amendment 23 ML0634201782006-12-0404 December 2006 2006/12/04-Vermont Yankee Nuclear Power Station, License Renewal Application, Amendment 22, Clarification of Aging Management Program and Environmental Report Items ML0634004532006-11-0909 November 2006 2006/11/09-E-Mail: (NPA-PD-LR) VYNPS License Renewal Application Am. 20, Vermont Yankee BVY 06-097, 2006/10/31-Vermont Yankee License Renewal Application, Amendment 192006-10-31031 October 2006 2006/10/31-Vermont Yankee License Renewal Application, Amendment 19 ML0627801222006-10-12012 October 2006 Summary of a Telephone Conference Call Held on September 19, 2006, Between the U.S. Nuclear Regulatory Commission and Entergy Nuclear Operations, Inc ML0626800342006-09-19019 September 2006 2006/09/19-Vermont Yankee License Renewal Application, Amendment 13 ML0625504392006-09-0505 September 2006 License Renewal Application, Amendment 12 2023-10-10
[Table view] Category:Technical Specification
MONTHYEARBVY 15-055, Revision of Technical Specifications Bases Pages2015-11-16016 November 2015 Revision of Technical Specifications Bases Pages BVY 15-024, Revision of Technical Specifications Bases Pages2015-03-25025 March 2015 Revision of Technical Specifications Bases Pages ML14231A0172014-08-13013 August 2014 Technical Specifications Proposed Change No. 309, Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition - Supplement 4 ML14202A2062014-07-16016 July 2014 Technical Specifications Proposed Change No. 307, Revision to Technical Specification Administrative Controls for Permanently Defueled Condition - Supplement 2 BVY 14-049, Technical Specifications Proposed Change No. 309, Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition - Supplement 32014-06-11011 June 2014 Technical Specifications Proposed Change No. 309, Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition - Supplement 3 ML13323A5182013-11-14014 November 2013 Technical Specifications Proposed Change No. 306 Eliminate Certain ESF Requirements During Movement of Irradiated Fuel BVY 13-084, Revision of Technical Specification Bases Page2013-09-0909 September 2013 Revision of Technical Specification Bases Page BVY 13-053, Revision of Technical Specifications Bases Pages2013-07-24024 July 2013 Revision of Technical Specifications Bases Pages BVY 13-062, Revised of Technical Specification Bases Pages2013-06-26026 June 2013 Revised of Technical Specification Bases Pages BVY 13-043, Technical Specifications Proposed Change No. 304, Revision to Low Pressure Safety Limit2013-05-14014 May 2013 Technical Specifications Proposed Change No. 304, Revision to Low Pressure Safety Limit BVY 13-023, License Amendment Request; Changes to 10 CFR 50.63 Licensing Basis, Supplement 22013-04-29029 April 2013 License Amendment Request; Changes to 10 CFR 50.63 Licensing Basis, Supplement 2 BVY 13-022, Revision of Technical Specification Bases Pages2013-03-26026 March 2013 Revision of Technical Specification Bases Pages BVY 12-078, Technical Specifications Proposed Change 297, Supplement 2 Response to Request for Additional Information2012-11-20020 November 2012 Technical Specifications Proposed Change 297, Supplement 2 Response to Request for Additional Information BVY 12-055, Technical Specifications Proposed Change 297, Supplement 1, Response to Request for Additional Information2012-08-0707 August 2012 Technical Specifications Proposed Change 297, Supplement 1, Response to Request for Additional Information BVY 12-018, Technical Specifications Proposed Change No. 299 Recirculation System Discharge Bypass Valve Change2012-04-17017 April 2012 Technical Specifications Proposed Change No. 299 Recirculation System Discharge Bypass Valve Change BVY 12-006, Technical Specifications Proposed Change No. 298, Rod Worth Minimizer Bypass Allowance2012-02-0101 February 2012 Technical Specifications Proposed Change No. 298, Rod Worth Minimizer Bypass Allowance BVY 12-005, Technical Specifications Proposed Change No. 297, Suppression Chamber-Drywell Leak Rate Test Surveillance Frequency Change2012-02-0101 February 2012 Technical Specifications Proposed Change No. 297, Suppression Chamber-Drywell Leak Rate Test Surveillance Frequency Change BVY 11-068, Revision of Technical Specification Bases Pages Due to License Amendment 2482011-09-30030 September 2011 Revision of Technical Specification Bases Pages Due to License Amendment 248 BVY 11-042, Technical Specifications Proposed Change No. 293, Supplement 1 Revised Reactor Vessel Pressure-Temperature Limitation Curves2011-05-16016 May 2011 Technical Specifications Proposed Change No. 293, Supplement 1 Revised Reactor Vessel Pressure-Temperature Limitation Curves BVY 11-037, Revision of Technical Specification Bases Pages Due to License Amendment 2462011-04-21021 April 2011 Revision of Technical Specification Bases Pages Due to License Amendment 246 BVY 10-059, Technical Specifications Proposed Change No. 294, Elimination of Provisions Allowing HPCI and RCIC Suctions to Be Aligned to the Suppression Pool2010-11-0808 November 2010 Technical Specifications Proposed Change No. 294, Elimination of Provisions Allowing HPCI and RCIC Suctions to Be Aligned to the Suppression Pool BVY 10-056, Submittal of Revision of Technical Specification Bases Pages2010-10-0606 October 2010 Submittal of Revision of Technical Specification Bases Pages BVY 10-047, Revision of Technical Specifications Bases Page2010-08-18018 August 2010 Revision of Technical Specifications Bases Page BVY 10-027, Revision of Technical Specification Bases Pages2010-05-21021 May 2010 Revision of Technical Specification Bases Pages BVY 10-017, Technical Specifications Proposed Change No. 290 Administrative Changes2010-04-13013 April 2010 Technical Specifications Proposed Change No. 290 Administrative Changes BVY 10-021, Revision of Technical Specification Bases Pages2010-03-31031 March 2010 Revision of Technical Specification Bases Pages BVY 09-074, Revision of Technical Specifications Bases Pages2009-12-0909 December 2009 Revision of Technical Specifications Bases Pages BVY 09-072, Technical Specification Bases Pages Associated with License Amendment 2362009-12-0909 December 2009 Technical Specification Bases Pages Associated with License Amendment 236 BVY 09-068, Technical Specifications Proposed Change No. 288 Scram Discharge Volume Vent and Drain Valves2009-12-0303 December 2009 Technical Specifications Proposed Change No. 288 Scram Discharge Volume Vent and Drain Valves BVY 09-055, Revision of Technical Specifications Bases Page2009-09-28028 September 2009 Revision of Technical Specifications Bases Page BVY 09-052, Technical Specifications Proposed Change No. 284 Change to Requirements for Inoperable Containment Isolation Valves2009-09-16016 September 2009 Technical Specifications Proposed Change No. 284 Change to Requirements for Inoperable Containment Isolation Valves BVY 09-051, Technical Specifications Proposed Change No. 285 Revision of High Radiation Area Controls2009-08-26026 August 2009 Technical Specifications Proposed Change No. 285 Revision of High Radiation Area Controls BVY 09-044, Revision of Technical Specifications Bases Pages2009-07-28028 July 2009 Revision of Technical Specifications Bases Pages BVY 09-029, Technical Specifications Proposed Change No. 283 Change to Requirements for Performing 10 CFR 50, Appendix J, Type a Test2009-05-0505 May 2009 Technical Specifications Proposed Change No. 283 Change to Requirements for Performing 10 CFR 50, Appendix J, Type a Test BVY 09-021, Submittal of Revision of Technical Specification Bases Pages2009-03-31031 March 2009 Submittal of Revision of Technical Specification Bases Pages BVY 09-014, Submittal of Revised Technical Specification Bases Pages2009-02-24024 February 2009 Submittal of Revised Technical Specification Bases Pages BVY 09-012, Submittal of Proposed License Amendment for Technical Specifications No. 282, Revision of Drywell Vacuum Breaker Surveillance Requirements2009-02-24024 February 2009 Submittal of Proposed License Amendment for Technical Specifications No. 282, Revision of Drywell Vacuum Breaker Surveillance Requirements ML0836500072008-12-18018 December 2008 Vermont Yankee Nuclear Power Station, Response to Request for Additional Information on Technical Specifications Proposed Change No. 273, Supplement 6 BVY 08-087, Vermont Yankee Nuclear Power Station, Response to Request for Additional Information on Technical Specifications Proposed Change No. 273, Supplement 62008-12-18018 December 2008 Vermont Yankee Nuclear Power Station, Response to Request for Additional Information on Technical Specifications Proposed Change No. 273, Supplement 6 BVY 08-087, Attachment 2, Technical Specification Proposed Change No. 273, Supplement 6, Sample Set-Point Calculations2008-12-18018 December 2008 Attachment 2, Technical Specification Proposed Change No. 273, Supplement 6, Sample Set-Point Calculations BVY 08-081, Submittal of Revision of Technical Specification Bases Page 292008-11-17017 November 2008 Submittal of Revision of Technical Specification Bases Page 29 BVY 08-076, Revision of Technical Specification Bases Pages2008-10-14014 October 2008 Revision of Technical Specification Bases Pages BVY 08-052, Technical Specifications Proposed Change No. 278, Changes to Main Steam Isolation Valve Surveillance Requirements2008-09-22022 September 2008 Technical Specifications Proposed Change No. 278, Changes to Main Steam Isolation Valve Surveillance Requirements BVY 08-059, Technical Specifications Proposed Change No. 280 Relocation of Reactor Building Crane Technical Specifications2008-09-22022 September 2008 Technical Specifications Proposed Change No. 280 Relocation of Reactor Building Crane Technical Specifications BVY 08-069, Transmittal of Technical Specifications Proposed Change No. 281, Revision to Battery Systems2008-09-22022 September 2008 Transmittal of Technical Specifications Proposed Change No. 281, Revision to Battery Systems BVY 08-066, Submittal of Corrected Technical Specification Page2008-08-26026 August 2008 Submittal of Corrected Technical Specification Page BVY 08-060, Submittal of Revision of Technical Specification Bases Page 2202008-08-25025 August 2008 Submittal of Revision of Technical Specification Bases Page 220 BVY 08-046, Revision of Technical Specification Bases Page 972008-07-28028 July 2008 Revision of Technical Specification Bases Page 97 BVY 08-031, Revision of Technical Specification Bases Page2008-05-29029 May 2008 Revision of Technical Specification Bases Page BVY 08-001, Technical Specifications Proposed Change No. 273 Instrumentation Technical Specifications2008-02-12012 February 2008 Technical Specifications Proposed Change No. 273 Instrumentation Technical Specifications 2015-03-25
[Table view] Category:Amendment
MONTHYEARBVY 14-049, Technical Specifications Proposed Change No. 309, Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition - Supplement 32014-06-11011 June 2014 Technical Specifications Proposed Change No. 309, Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition - Supplement 3 BVY 12-018, Technical Specifications Proposed Change No. 299 Recirculation System Discharge Bypass Valve Change2012-04-17017 April 2012 Technical Specifications Proposed Change No. 299 Recirculation System Discharge Bypass Valve Change BVY 10-059, Technical Specifications Proposed Change No. 294, Elimination of Provisions Allowing HPCI and RCIC Suctions to Be Aligned to the Suppression Pool2010-11-0808 November 2010 Technical Specifications Proposed Change No. 294, Elimination of Provisions Allowing HPCI and RCIC Suctions to Be Aligned to the Suppression Pool BVY 09-052, Technical Specifications Proposed Change No. 284 Change to Requirements for Inoperable Containment Isolation Valves2009-09-16016 September 2009 Technical Specifications Proposed Change No. 284 Change to Requirements for Inoperable Containment Isolation Valves BVY 09-051, Technical Specifications Proposed Change No. 285 Revision of High Radiation Area Controls2009-08-26026 August 2009 Technical Specifications Proposed Change No. 285 Revision of High Radiation Area Controls BVY 09-029, Technical Specifications Proposed Change No. 283 Change to Requirements for Performing 10 CFR 50, Appendix J, Type a Test2009-05-0505 May 2009 Technical Specifications Proposed Change No. 283 Change to Requirements for Performing 10 CFR 50, Appendix J, Type a Test BVY 09-012, Submittal of Proposed License Amendment for Technical Specifications No. 282, Revision of Drywell Vacuum Breaker Surveillance Requirements2009-02-24024 February 2009 Submittal of Proposed License Amendment for Technical Specifications No. 282, Revision of Drywell Vacuum Breaker Surveillance Requirements BVY 08-059, Technical Specifications Proposed Change No. 280 Relocation of Reactor Building Crane Technical Specifications2008-09-22022 September 2008 Technical Specifications Proposed Change No. 280 Relocation of Reactor Building Crane Technical Specifications BVY 08-066, Submittal of Corrected Technical Specification Page2008-08-26026 August 2008 Submittal of Corrected Technical Specification Page BVY 08-001, Technical Specifications Proposed Change No. 273 Instrumentation Technical Specifications2008-02-12012 February 2008 Technical Specifications Proposed Change No. 273 Instrumentation Technical Specifications ML0535301802005-12-12012 December 2005 Technical Specification Proposed Change No. 266, Revision to Control Rod Operability, Scram Time Testing and Control Rod Accumulators - Response to Request for Additional Information BVY 05-101, Vermont Yankee Nuclear Power Station Proposed Technical Specification Change No. 263 - Supplement No. 41 Re Extended Power Uprate - Condensate and Feedwater Transient Response Engineering Analysis2005-11-0202 November 2005 Vermont Yankee Nuclear Power Station Proposed Technical Specification Change No. 263 - Supplement No. 41 Re Extended Power Uprate - Condensate and Feedwater Transient Response Engineering Analysis BVY 05-088, Vermont Yankee, Technical Specification Proposed Change No. 263 - Supplement No. 35 Extended Power Uprate - Response to Request for Additional Information2005-09-28028 September 2005 Vermont Yankee, Technical Specification Proposed Change No. 263 - Supplement No. 35 Extended Power Uprate - Response to Request for Additional Information BVY 05-086, Vermont Yankee - Technical Specifications Proposed Change No. 263 - Supplement No. 34 Extended Power Uprate - Additional Information2005-09-18018 September 2005 Vermont Yankee - Technical Specifications Proposed Change No. 263 - Supplement No. 34 Extended Power Uprate - Additional Information ML0524402132005-08-31031 August 2005 Technical Specification Page, Revision to One-Time Extension of Integrated Leak Rate Test Interval ML0508402532005-03-22022 March 2005 Tech Spec Pages for Amendment 222 Regarding Elimination of Requirements to Provide Monthly Operating Reports and Annual Occupational Radiation Exposure Reports ML0505401492005-02-18018 February 2005 Corrected Page 7 to License DPR-28 and Page 97 to Technical Specifications for Vermont Yankee BVY 04-098, Vermont Yankee - Technical Specification Proposed Change No. 263 - Supplement No. 14 Extended Power Uprate - Response to Request for Additional Information2004-09-15015 September 2004 Vermont Yankee - Technical Specification Proposed Change No. 263 - Supplement No. 14 Extended Power Uprate - Response to Request for Additional Information ML0408602662004-03-22022 March 2004 Technical Specification, Safety Limit Minimum Critical Power Ratio Values in Technical Specification 1.1.A.1 to Incorporate Results in cycle-specific Core Reload Analysis for Cycle 24 Operation ML0329301432003-10-10010 October 2003 Technical Specification Proposed Change No. 262, Supplement No. 1 Regarding Alternative Source Term ML0328104472003-10-0101 October 2003 Vermont Yankee - Technical Specification Proposed Change No. 263, Supplemental No. 1 Regarding Extended Power Uprate, Technical Review Guidance ML0321906462003-07-31031 July 2003 TS Proposed Change No. 262, Alternative Source Term ML0226302842002-09-18018 September 2002 Technical Specifications, Remove Existing Scram Function & Group 1 Isolation Valve Closure Functions of Main Steam Line Radiation Monitors ML17037B7791974-02-0707 February 1974 Letter Regarding Petition for Derating of Certain Boiling Water Reactors and Enclosed Before the Atomic Safety and Licensing Appeal Board in the Matter of Vermont Yankee Nuclear Power Corporation - Vermont Yankee Nuclear ... 2014-06-11
[Table view] |
Text
Entergy Nuclear Operations, Inc.
Vermont Yankee Governor Hunt Road Lt!1EnhV Vernon, VT 05354 Tel 802 257 7711 Michael J Colomb.
Site Vice President September 16, 2009 BVY 09-052 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
SUBJECT:
Technical Specifications Proposed Change No. 284 Change to Requirements for Inoperable Containment Isolation Valves Vermont Yankee Nuclear Power Station Docket No. 50-271 License No. DPR-28
Dear Sir or Madam:
Pursuant to 1 OCFR50.90, Entergy Nuclear Operations, Inc. (ENO) is proposing to amend Operating License DPR-28 for the Vermont Yankee Nuclear Power Station (VY). The proposed change would revise the Operating License Technical Specifications (TS) Section 3.7 to change the current wording to be consistent with NUREG-1433 "Standard Technical Specifications General Electric Plants, BWR/4," Revision 3. Specifically, the proposed change would change TS 3.7.D.2 to allow reactor operation, in the event any containment isolation valve becomes inoperable, provided the affected penetration flow path is isolated by the use of at least one closed and de-activated automatic valve, closed manual valve, or blind flange. Also, a corresponding change to TS 4.7.D.2 is made to be consistent with NUREG-1433 actions and completion times.
ENO has reviewed the proposed amendment in accordance with 10CFR50.92 and concludes it does not involve a significant hazards consideration. In accordance with 10CFR50.91, a copy of this application, with attachments, was provided to the State of Vermont, Department of Public Service. to this letter provides an evaluation of the proposed change. Attachment 2 contains a markup of the current TS and TS Bases. Attachment 3 contains the retyped TS page and TS Bases. The TS Bases is provided for information only ENO requests approval of the proposed amendment by September 1, 2010 with a 60 day implementation period.
There are no new regulatory commitments made in this letter.
BVY 09-052 / Page 2 of 2 If you have any questions on this transmittal, please contact Mr. David Mannai at (802) 451-3304.
I declare under penalty of perjury that the foregoing is true and correct. Executed on September 16, 2009.
Sincerely, MJC/JMD : Evaluation of the Proposed Change : Markup of the Current Technical Specification and Bases Page : Retyped Technical Specification and Bases Page cc: Mr. Samuel J. Collins Regional Administrator, Region 1 U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406-1415 Mr. James S. Kim, Project Manager Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 08C2A Washington, DC 20555 USNRC Resident Inspector Entergy Nuclear Vermont Yankee, LLC P.O. Box 157 Vernon, Vermont 05354 Mr. David O'Brien, Commissioner VT Department of Public Service 112 State Street - Drawer 20 Montpelier, Vermont 05620-2601
BVY 09-052 Docket No. 50-271 Attachment 1 Vermont Yankee Nuclear Power Station Proposed Change 284 Evaluation of the Proposed Change
BVY 09-052 / Attachment 1 / Page 1 of 6 EVALUATION OF THE PROPOSED CHANGE
- 1. Description of Change Entergy Nuclear Operations, Inc. (ENO) is requesting to amend Operating License DPR-28 for Vermont Yankee Nuclear Power Station (VY). The proposed change would revise the Operating License Technical Specifications (TS) Section 3.7 to change the current wording to be consistent with NUREG-1433 Revision 3 "Standard Technical Specifications General Electric Plants, BWR/4,"
Revision 3. Specifically, the proposed change would change the Section 3.7.D.2 to allow reactor operation, in the event any containment isolation valve becomes inoperable, provided the affected penetration flow path is isolated by the use of at least one closed and de-activated automatic valve, closed manual valve, or blind flange. Also, a corresponding change to TS 4.7.D.2 is made to be consistent with NUREG-1433 actions and completion times.
- 2. Proposed Change The following change is proposed to the current TS Section 3.7.D.2:
Current TS 3.7.D.2 In the event any containment isolation valve becomes inoperable, reactor power operation may continue provided at least one containment isolation valve in each line having an inoperable valve is in the mode corresponding to the isolated condition.
Proposed TS 3.7.D.2 In the event any containment isolation valve becomes inoperable, reactor power operation may continue provided the affected penetration flow path is isolated by the use of at least one closed and de-activated automatic valve, closed manual valve, or blind flange.
Current TS 4.7.D.2 Whenever a containment isolation valve is inoperable, the position of at least one other valve in each line having an inoperable valve shall be logged daily.
Proposed TS 4.7.D.2 Whenever a containment isolation valve is inoperable, verify the affected penetration flow path is isolated once per 31 days.
BVY 09-052 / Attachment 1 / Page 2 of 6
- 3. Backcqround VY TS 3.7.D.2 requires at least one containment isolation valve (CIV) in each line having an inoperable CIV to be in the mode corresponding to the isolated condition. This specification depends on there being at least two CIVs in order to continue power operation with one CIV inoperable. The design of VY includes lines that penetrate the primary containment with other containment isolation configurations including single valve isolation. These lines typically include other automatic valves or maintenance isolation valves that are close to the containment boundary that can serve as interim isolation devices while repairs to the CIV are made' Currently, if a containment isolation valve on a line with a single isolation valve becomes inoperable, a plant shutdown in accordance with TS 3.7.D.3 would be required if the valve could not be readily made operable. Adopting the wording from NUREG-1433 would provide additional capability to support isolation of the affected line and avoid an unnecessary plant shut down transient. The change also makes TS 3.7.D.2 consistent with TS 3.7.A.3 which allows openings in systems, considered extensions of the primary containment, to be isolated by at lease one closed and deactivated automatic valve, closed manual valve or a blind flange. Also, a corresponding change to TS 4.7.D.2 is made to verify the affected penetration flow path is isolated once per 31 days. This is consistent with the actions and timeframe specified in NUREG-1433 and provides for confirmation that the flow path remains isolated.
- 4. Technical Analysis The safety objective of the primary containment system, in conjunction with the core standby cooling systems, is to provide the capability, in the event of a postulated loss-of-coolant accident (LOCA), to limit the release of fission products to the plant environs so that off-site doses would be well below the values specified in 10CFR50.67. The consequences of the LOCA are described in the VY Update Final Safety Analysis Report (UFSAR) section 14.6.
To support this objective, the primary containment is provided with the capability for rapid isolation of all pipes that penetrate the primary containment with the means to provide a containment barrier that maintains leakage within permissible limits.
VY was designed and licensed to the Atomic Energy Commission 1967 Draft General Design Criteria (GDC) as discussed in the VY Updated Final Safety Analysis Report (UFSAR) Table 1.7.7 and Appendix F. The GDC specifically applicable to the design of containment isolation valves is GDC 53.
GDC 53 requires:
Containment Isolation Valves - Penetrationsthat require closure for the containment function shall be protected by redundant valving and associatedapparatus.
UFSAR Section 5.2.3.5.1 provides the general criteria governing isolation valves for various categories of penetrations in part as follows:
BVY 09-052 / Attachment 1 / Page 3 of 6
- 1) Pipes which penetrate the primary containment and which connect to the reactor primarysystem, are provided with at least two isolation valves in series and are designatedas Class A isolation Valves. The lines consist of at least one valve located inside and at least one valve located outside primary containment.
- 2) Pipes or ducts which penetrate the primary containment and which do not connect directly to the reactorprimary system, but are open to the primary containment free space, are generallyprovided with at least two isolation valves in series and are designatedas Class B isolation valves. The penetration consists of at least two valves located outside primary containment, except that on water seal lines, one isolation valve in addition to the water seal is adequate to meet isolation requirements.
- 3) Lines which penetrateprimary containment, and which neither connect to the reactor primary system, nor which open to the primary containment free space, are provided with at least one isolation valve which may be located outside primary containmentand are designated as Class C isolation valves.
Exceptions to the above general criteria are provided in UFSAR Section 5.2.3.5.1 and UFSAR Table 5.2.2 provides a listing of primary containment system penetrations, and associated containment isolation valves as well as the penetration type and other related information associated with each penetration. The integrated design of the containment isolation valves accommodates various process needs and ensures that the containment isolation function is maintained.
The current TS allows, in the event any containment isolation valve becomes inoperable, continued reactor power operation provided at least one containment isolation valve in each line having an inoperable valve is in the mode corresponding to the isolated condition.
Since, by design, not all containment penetrations are provided with multiple containment isolation valves, VY may be forced into an unnecessary plant shutdown should an inoperable isolation valve not be able to be repaired within the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> timeframe prescribed in the TS 3.7.D.3 for the plant to be in the cold shutdown condition.
Adopting the proposed wording would, in the event a containment isolation valve becomes inoperable, allow reactor power operation to continue provided the affected penetration flow path is isolated by the use of at least one closed and de-activated automatic valve, closed manual valve, or blind flange. This provides other alternatives to isolate the affected penetration and would not result in a potentially unnecessary plant shutdown. This provision is consistent with the guidance contained in NUREG-1433. Since no completion time is proposed, actions to put the alternate containment device in place would be initiated immediately and be completed within the timeframe to ensure TS 3.7.D.3 is satisfied.
In accordance with the Bases contained in NUREG-1433, the VY TS Bases will be modified to state that the device used to isolate the penetration should be the closest available device to the primary containment. The Bases in NUREG-1433 also recognizes that the required action does not require any testing or device manipulation. Rather, it involves verification that those devices outside containment and capable of potentially being
BVY 09-052 / Attachment 1 / Page 4 of 6 mispositioned are in the correct position. VY TS 4.7.D.2 currently requires, whenever a containment isolation valve is inoperable, that the position of at least one other valve in each line having an inoperable valve shall be logged daily. The proposed change adopts actions consistent with NUREG-1433 to verify the affected penetration flow path is isolated once per 31 days. Verifying the affected flow path is isolated every 31 days provides added assurance, over and above normal plant status controls, that the isolation device is in the isolated condition.
The current TS requires at least one containment isolation valve in the affected line to be closed when a CIV is inoperable. In most cases, this valve would be subject to 10CFR50 Appendix J Type C leak rate testing. Under the proposed change there are a number of options for isolating the affected penetration some of which may not be subject to leak rate testing. This is not considered significant because the alternate isolation devices (i.e., use of at least one closed and de-activated automatic valve, closed manual valve or a blind flange) are considered passive devices, are not required to close automatically in response to an accident condition and are not required to be operated intermittently under post accident conditions. Leakage from passive devices is expected to be minimal with respect to the overall acceptable leakage assumed in the VY UFSAR Chapter 14.6 accident analysis. Also, the components used as isolation devices are typically subject to a periodic maintenance program that ensures components relied upon for system isolation are capable of performing the isolation function.
- 5. Regulatory Safety Analysis No Significant Hazards Consideration Entergy Nuclear Operations, Inc. (ENO) is proposing to modify the Vermont Yankee Nuclear Power Station Operating License Technical Specifications Section 3.7 to change the current wording to be consistent with NUREG-1433 "Standard Technical Specifications General Electric Plants, BWR/4," Revisions 3. Specifically, the proposed change would change TS 3.7.D.2 to allow reactor operation, in the event any containment isolation valve becomes inoperable, provided the affected penetration flow path is isolated by the use of at least one closed and de-activated automatic valve, closed manual valve, or blind flange. Also, a corresponding change to TS 4.7.D.2 is made to be consistent with NUREG-1433 actions and completion times.
ENO has evaluated whether or not a significant hazards consideration is involved with the proposed amendment by focusing on the three standards set forth in 10CFR50.92, "Issuance of amendment," as discussed below:
- 1. Does the proposed change involve a significant increase in the probability or consequences of an accident Previously evaluated?
Response: No. The change does not impact the probability of any design basis accident in that no accident initiators are impacted. The change does not impact accident mitigation. The proposed change provides equivalent requirements for conditions where there is an inoperable containment isolation valve so that accident mitigation systems function consistent with the licensing and design
BVY 09-052 / Attachment 1 / Page 5 of 6 basis. The change ensures that the function of primary containment is maintained should there be an inoperable containment isolation valve by isolation of the penetration flow path using passive devices. Although the isolation means are not in all cases leak tested, leakage is not expected to be significant since the devices used for isolation are passive components that are in the isolated position. Therefore, the proposed change does not involve a significant increase in the probability or consequences of an accident previously evaluated.
- 2. Does the proposed change create the possibility of a new or different kind of accident from any accident previously evaluated?
Response: No. The proposed change provides allowance for crediting passive isolation devices on lines that have been determined to have an inoperable containment isolation valve. The use of a passive component (i.e., another containment isolation valve in the affected line) to compensate for an inoperable isolation valve is already part of the licensing basis. The change expands the types of passive devices which may be used. Operation of existing installed equipment is unchanged. The methods governing plant operation and testing remain consistent with current safety analysis assumptions. Therefore, the proposed change does not create the possibility of a new or different kind of accident from any accident previously evaluated.
- 3. Does the Proposed change involve a significant reduction in a margin of safety?
Response: No. The proposed change does not change any existing design requirements and does not adversely affect existing plant safety margins or the reliability of the equipment assumed to operate in the safety analysis. The proposed change affects the types of passive devices that can be used as the containment boundary when a containment isolation valve is inoperable. The design of such devices would meet containment design requirements so that safety margins are maintained. Leakage through passive devices would be minimal and be within regulatory limits. Therefore, the proposed change does not involve a significant reduction in a margin of safety.
Based on the above, ENO concludes that the proposed amendment presents no significant hazards consideration under the standards set forth in 10CFR50.92(c), and, accordingly, a finding of "no significant hazards consideration" is justified.
- 6. Environmental Consideration This amendment request meets the eligibility criteria for categorical exclusion from environmental review set forth in 1 OCFR51.22(c)(9) as follows:
(i) The amendment involves no significant hazards determination.
As described in Section V of this evaluation, the proposed change involves no significant hazards consideration.
BVY 09-052 / Attachment 1 / Page 6 of 6 (ii) There is no significant change in the types or significant increase in the amounts of any effluent that may be released offsite.
The proposed amendment provides means to isolate lines penetrating primary containment and therefore does not involve any physical alterations to the plant configuration that could lead to a change in the type or amount of effluent release off'site.
(iii) There is no significant increase in individual or cumulative occupational radiation exposure.
The proposed amendment does not involve issues associated with occupational radiation exposure. The proposed amendment specifies allowable containment isolation devices that compensate for having an inoperable containment isolation valve.
Based on the above, VY concludes that the proposed change meets the eligibility criteria for categorical exclusion as set forth in 10CFR51.22(c)(9). Pursuant to 10CFR51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of this amendment.
- 6. Precedents None
- 7. References
- a. NUREG-1433, "Standard Technical Specifications General Electric Plants, BWR/4,"
Revision 3
BVY 09-052 Docket 50-271 Attachment 2 Vermont Yankee Nuclear Power Station Proposed Change 284 Markup of the Current Technical Specification and Bases Page
3.7 LIMITING CONDITIONS FOR 4.7 SURVEILLANCE REQUIREMENTS OPERATION D. Primary Containment Isolation D. Primary Ccntainment S.
'f,.sota rsolation ion'
- 1. During reactor power I. Surveillance of the operating conditions all primary containment containment isolation isoltion valves Should be valves and all instrument performed as follows:
line flow check valves bhall be operable *'xcept The operable isolation
's specified in valves that aire power Specification 3.7.D.2. operated and automatically initiated shall be tested for automatic initiation and closure time at least once per operating cycle.
- b. Operability testing of the primary containment isolation valves shall be performed in accordance with Specification 4.6.E.
C. Deleted atheaffected penetration flow path is isolated by the automatic use of at least one closed and de-activated valve, closed manual valve, or blind flange.
- 2. Whenever a containment
- 2. In the event any isolation valve is containment isolation inoperable, t-h & le-in valve becomes inoperable, of *t leaett r reactor power operation may continueprovided a Slea t one containmentl zsi in ' al e Ln ach If a 1peifications 3.7.0.1 i verify the affected penetration ftow iso , ted condition. /
and 3.7.D.2 cannot be met, path is isolated once per 31 days.
an orderly shutdown shall Se initiat:ed. anj -he
,hold shutdSwn ,onditln within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
Am(-2rdm,-nt ýjo.
I.5 8
VYNPS BASES: 3.7 (Cont'd)
An alternate electrical power source for the purposes of Specification 3.7.B.l.b shall consist of either an Emergency Diesel Generator (EDG) or the Vernon Hydro tie line. Maintaining availability of the Vernon Hydro tie line as an alternative to one of the EDGs in this condition provides assurance that standby gas treatment can, if required, be operated without placing undue constraints on EDG maintenance availability. Inoperability of both trains of the SGTS or both EDGs during refueling operations requires suspension of activities that represent a potential for releasing radioactive material to the secondary containment, thus placing the plant in a condition that minimizes risk.
Use of the SGTS, without the fan and the 7.1 kW heater in operation, as I a vent path during torus venting does not impact subsequent adsorber capability because of the very low flows and because humidity control is maintained by the standby 1 kW heaters, therefore operation in this manner does not accrue as operating time.
Wl C 0 E D. Primary Containment Isolation Valves CUCCU~
Ge-n double isolation valves are provided on lines that--ate 6 .2 0-a the primary z nment and communicate directly wit eactor
~~ caa)C vessel and on lines the primainment and enetrate communicate with the primary c ree space. Closure of one of 5E 0 W902 o 0
, the valves in each line wo
, C 4-; suffic o maintain the integrity
- 3 0 ~ ~a) a) of the pressure s ion system. Automatic 1i on is required
< '- > E to minimi potential leakage paths from the containm the e- a loss-of-coolant accident.
C:0- >EQ E. Reactor Building Automatic Ventilation System Isolation Valves
>.C o -C 0 (RBAVSIVs)
The function of the RBAVSIVs, in combination with other accident
>u mitigation systems, is to limit fission product release during and following postulated Design Basis Accidents (DBAs). The operability
>'CM Cu requirements for RBAVSIVs help ensure that an adequate secondary
ýa> - > containment boundary is maintained during and after an accident by E E minimizing potential paths to the environment. The RBAVSIVs must be operable (or the penetration flow path isolated) to ensure secondary C : containment integrity and to limit the potential release of fission Cc E0 products to the environment. The valves covered by this Limiting Cu >
Condition for Operation are included in the Inservice Testing Program.
-CU 0 Cu- C/)
-0 E 0 U a)ca) In the event that there are one or more RBAVSIVs inoperable, the
_ CZ- affected penetration flow path(s) must be isolated. The method of 0 Cu - a)W isolation must include the use of at least one isolation barrier that
-n :3r-c a) 0 W C c ) cannot be adversely affected by a single active failure. The required (DvO u cc a) Cu(D - a) action must be completed within the eight hour or four hour completion (n U) Wa) time, as applicable. The specified time periods are reasonable
_c - considering the time required to isolate the penetration, and the probability of a DBA occurring during this short time.
0,0 S0 a) -, C - :3C If any required action or, completion time cannot be met as a result of
- Q) Cu = 0 U) 0 one or more inoperable RBAVSIVs, the plant must be placed in a mode or condition where the Limiting Condition for Operation does not apply.
@o .- To achieve this status during reactor power operation, the reactor must S> - () Cu 0 r-Ec. E1) be brought to at least hot shutdown within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and to cold N CO: -0"a shutdown within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. If applicable, core alterations and the movement of irradiated fuel assemblies and the fuel cask in the
- E~ cŽ r-' secondary containment must be immediately suspended. Suspension of CU) a)
( o -0 - these activities shall not preclude completion of movement of a component to a safe position. Also, if applicable, actions must be E E -0 c: -- a immediately initiated to suspend OPDRVs in order to minimize the
.~C 4) C: 0 probability of a vessel draindown and the subsequent potential for fission product release. Actions must continue until OPDRVs are suspended.
Amendment No. 4-4, 449_, .VY 01 52, 210 166a
BVY 09-052 Docket 50-271 Attachment 3 Vermont Yankee Nuclear Power Station Proposed Change 284 Retyped Technical Specification and Bases Page
VYNPS 3.7 LIMITING CONDITIONS FOR 4.7 SURVEILLANCE REQUIREMENTS OPERATION D. Primary Containment Isolation D. Primary Containment Isolation Valves Valves
- 1. During reactor power 1. Surveillance of the operating conditions all primary containment containment isolation isolation valves should be valves and all instrument performed as follows:
line flow check valves shall be operable except a. The operable isolation as specified in valves that are power Specification 3.7.D.2. operated and automatically initiated shall be tested for automatic initiation and closure time at least once per operating cycle.
- b. Operability testing of the primary containment isolation valves shall be performed in accordance with Specification 4.6.E.
- c. Deleted
- 2. Whenever a containment
- 2. In the event any isolation valve is containment isolation inoperable, verify the valve becomes inoperable, affected penetration reactor power operation flow path is isolated may continue provided the once per 31 days.
affected penetration flow path is isolated by the use of at least one closed and de-activated automatic valve, closed manual valve, or blind flange.
- 3. If Specifications 3.7.D.1 and 3.7.D.2 cannot be met, an orderly shutdown shall be initiated and the reactor shall be in the cold shutdown condition within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
Amendment No. 4-24, 4--4, 4--2-, 44&, 2*14, 3- 158
VYNPS BASES: 3.7 (Cont'd)
An alternate electrical power source for the purposes of Specification 3.7.B.l.b shall consist of either an Emergency Diesel Generator (EDG) or the Vernon Hydro tie line. Maintaining availability of the Vernon Hydro tie line as an alternative to one of the EDGs in this condition provides assurance that standby gas treatment can, if required, be operated without placing undue constraints on EDG maintenance availability. Inoperability of both trains of the SGTS or both EDGs during refueling operations requires suspension of activities that represent a potential for releasing radioactive material to the secondary containment, thus placing the plant in a condition that minimizes risk.
Use of the SGTS, without the fan and the 7.1 kW heater in operation, as a vent path during torus venting does not impact subsequent adsorber capability because of the very low flows and because humidity control is maintained by the standby 1 kW heaters, therefore operation in this manner does not accrue as operating time.
D. Primary Containment Isolation Valves The primary containment design includes lines that penetrate the primary containment with different containment isolation valve configurations including double and single valve isolation. Automatic initiation is required to minimize the potential leakage paths from the containment in the event of a loss-of-coolant accident. These lines typically include additional automatic valves or manual maintenance isolation valves, close to the containment boundary, that can serve as interim isolation devices while repairs to a containment isolation valve are made. Isolation using at least one closed de-activated automatic valve, closed manual valve, or blind flange in each line is sufficient to maintain the integrity of the primary containment. The selected isolation device should be the closest available device to the primary containment.
E. Reactor Building Automatic Ventilation System Isolation Valves (RBAVSIVs)
The function of the RBAVSIVs, in combination with other accident mitigation systems, is to limit fission product release during and following postulated Design Basis Accidents (DBAs). The operability requirements for RBAVSIVs help ensure that an adequate secondary containment boundary is maintained during and after an accident by minimizing potential paths to the environment. The RBAVSIVs must be operable (or the penetration flow path isolated) to ensure secondary containment integrity and to limit the potential release of fission products to the environment. The valves covered by this Limiting Condition for Operation are included in the Inservice Testing Program.
In the event that there are one or more RBAVSIVs inoperable, the affected penetration flow path(s) must be isolated. The method of isolation must include the use of at least one isolation barrier that cannot be adversely affected by a single active failure. The required action must be completed within the eight hour or four hour completion time, as applicable. The specified time periods are reasonable considering the time required to isolate the penetration, and the probability of a DBA occurring during this short time.
Amendment No. 4-4-3, 4-9-%, 8V4Y 01 S2,44 166a