Supplement to Request for License Amendments - Diesel Generator (DG) Completion Time (CT) Extension for Technical Specification (TS) 3.8.1, AC Sources - Operating
ML14041A213
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 01/22/2014
From: Pope A
Duke Energy Progress
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
BSEP 14-0010, TAC ME8893, TAC ME8894
Download: ML14041A213 (2)


Text

Brunswick Nuclear Plant P.O. Box 10429 ENERGY, Southport, NC 28461 JAN 2 2 2014 Serial: BSEP 14-0010 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

Subject:

Brunswick Steam Electric Plant, Unit Nos. 1 and 2 Renewed Facility Operating License Nos. DPR-71 and DPR-62 Docket Nos. 50-325 and 50-324 Supplement to Request for License Amendments - Diesel Generator (DG)

Completion Time (CT) Extension for Technical Specification (TS) 3.8.1, "AC Sources - Operating" (TAC No. ME8893 and ME8894)

References:

1. Letter from M. Annacone to the U.S. Nuclear Regulatory Commission, Request for License Amendments - Diesel Generator(DG) Completion Time (CT) Extension for Technical Specification (TS) 3.8.1, "AC Sources - Operating,"dated June 19, 2012.

ADAMS Accession Number ML12173A112

2. Letter from A. Pope to the U. S. Nuclear Regulatory Commission, Supplement to Request for License Amendments - Diesel Generator(DG) Completion Time (CT)

Extension for Technical Specification (TS) 3.8.1, "AC Sources - Operating," dated May 14, 2013. ADAMS Accession Number ML13141A405 Ladies and Gentlemen:

On June 19, 2012 (i.e., Reference 1), Duke Energy Progress, Inc., requested a revision to the Technical Specifications (TS) for the Brunswick Steam Electric Plant (BSEP), Unit Nos. 1 and 2.

The proposed revision extends the Completion Time (CT) of TS 3.8.1, Required Action D.4 for an inoperable diesel generator (DG) from 7 days to 14 days. A commensurate change was also proposed to extend the maximum Completion Time of TS 3.8.1, Required Actions C.3 and D.4.

In support of the proposed amendments, Duke Energy is installing a supplemental diesel generator (SUPP-DG). In a letter dated May 14, 2013 (i.e., Reference 2), Duke Energy requested that the implementation schedule for the proposed amendments be within 90 days of the supplemental diesel generator being available.

Based on discussions with the NRC, Duke Energy requests that implementation of the proposed amendments be prior to startup from the 2014 Unit 1 refueling outage (i.e., B120R1).

U.S. Nuclear Regulatory Commission Page 2 of 2 No regulatory commitments are contained in this submittal. Please refer any questions regarding this submittal to Mr. Lee Grzeck, Manager - Regulatory Affairs, at (910) 457-2487.

Sincerely, Aqnn tH.Pp Manager - Organizational Effectiveness Brunswick Steam Electric Plant MAT/mat cc:

U. S. Nuclear Regulatory Commission, Region II ATTN: Mr. Victor M. McCree, Regional Administrator 245 Peachtree Center Ave, NE, Suite 1200 Atlanta, GA 30303-1257 U. S. Nuclear Regulatory Commission ATTN: Ms. Farideh E. Saba (Mail Stop OWFN 8G9A) (Electronic Copy Only) 11555 Rockville Pike Rockville, MD 20852-2738 U. S. Nuclear Regulatory Commission ATTN: Ms. Michelle P. Catts, NRC Senior Resident Inspector 8470 River Road Southport, NC 28461-8869 Chair - North Carolina Utilities Commission P.O. Box 29510 Raleigh, NC 27626-0510 Mr. W. Lee Cox, III, Section Chief (Electronic Copy Only)