AEP-NRC-2017-45, Notification of Implementation of License Renewal Activities for Entrance Into Period of Extended Operation

From kanterella
(Redirected from AEP-NRC-2017-45)
Jump to navigation Jump to search
Notification of Implementation of License Renewal Activities for Entrance Into Period of Extended Operation
ML17206A038
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 07/20/2017
From: Scarpello M
Indiana Michigan Power Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
AEP-NRC-2017-45
Download: ML17206A038 (2)


Text

m INDIANA Indiana Michigan Power MICHIGAN Cook Nuclear Plant POWER One Cook Place Bridgman, Ml 49106 A unit ofAmerican Electric Power Indiana Michigan Power.com July 20, 2017 AEP-NRC-2017-45 10 CFR 50.4 Docket No.: 50-316 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Donald C. Cook Nuclear Plant Unit 2 NOTIFICATION OF IMPLEMENTATION OF LICENSE RENEWAL ACTIVITIES FOR ENTRANCE INTO PERIOD OF EXTENDED OPERATION

References:

1. NUREG-1831, "Safety Evaluation Report Related to the License Renewal of the Donald C. Cook Nuclear Plant, Units 1 and 2," dated May 2005 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML052230442).
2. Letter from J. Rowley, U.S. Nuclear Regulatory Commission, to M. K. Nazar, Indiana Michigan Power Company, "Donald C. Cook Nuclear Plant, Units 1 and 2-lssuance of Renewed Facility Operating License Nos. DPR-58 and DPR-74," dated August 30, 2005 (ADAMS Accession No. ML052340411 ).

Pursuant to Operating License Condition 2.K. of the Donald C. Cook Nuclear Plant (CNP) Renewed Facility Operating License (DPR-74), which was issued per Reference 2, Indiana Michigan Power Company confirms that the CNP Unit 2 license renewal commitments of Reference 1, required to be implemented prior to entry into the period of extended operation, are complete.

There are no commitments contained in this letter. Should you have any questions, please contact nie at (269) 466-2649.

Sincerely, lvh.avfL Michael K. Scarpello Regulatory Affairs Manager DMB/kmh

U.S. Nuclear Regulatory Commission AEP-NRC-2017-45 Page2 c: R. J. Ancona - MPSC MDEQ- RMD/RPS NRCResident Inspector C. D. Pederson, NRC Region Ill J. K. Rankin, NRC Washington, D.C.

A. J. Williamson -AEP Ft. Wayne