Finding | |
---|---|
Title | Failure to Properly Implement Compensatory Actions as Directed by Procedure |
Description | The inspectors identified a non-cited violation of 10 CFR Part 50, Appendix B, Criterion V, Instructions, Procedures, and Drawings, for the licensees failure to properly implement procedure directed compensatory actions necessary for operability of safetyrelated equipment. Specifically, when the train B class 1E switchgear air conditioning unit (SGK05B) was taken out of service for maintenance, compensatory measures to open all of the doors between both trains of engineered safety feature ac and dc switchgear and batteries were not implemented correctly. This resulted in less than calculated minimum cooling air flow required under accident conditions to support operability of the associated switchgear. The licensee entered this issue into their corrective action program as Callaway Action Request 201503501. The corrective actions include revising the compensatory action procedures and providing training on the issue. The licensees failure to properly implement compensatory actions necessary to maintain operability of safety-related equipment in accordance with plant procedures was a performance deficiency. The performance deficiency is more than minor, and therefore a finding, because it is similar to examples 3.i, 3.j, and 3.k in Inspection Manual Chapter 0612, Appendix E, Examples of Minor Issues, and it is associated with the equipment performance attribute of the Mitigating Systems Cornerstone and adversely affected the cornerstone objective to ensure the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences (i.e., core damage). Specifically, between May 6 and 7, 2015, when the train B class 1E switchgear air conditioning unit (SGK05B) was taken out of service for maintenance, compensatory measures to open all of the doors between both trains of vital batteries, chargers, and engineered safety feature switchgear were not implemented correctly and when discovered required significant evaluation to determine the operability status of the supported equipment during the maintenance. Using Inspection Manual Chapter 0609, Appendix A, Exhibit 2, Mitigating Systems Screening Questions, the finding was determined to be of very low safety significance because it did not affect system design, did not result in a loss of system function, did not represent a loss of function of a single train for greater than its technical specifications allowed outage time, and did not cause the loss of function of one or more non-technical specification trains of equipment designated as high safety-significance. This finding has a cross-cutting aspect of Challenge the Unknown in the human performance cross-cutting area because individuals did not stop when faced with uncertain conditions and risks were not evaluated and managed before proceeding. Specifically, operations personnel did not question why they were only opening one door of a double door set when implementing the compensatory measures to allow cool air in the air conditioned rooms to cool the rooms without air conditioning [H.11] |
Site: | Callaway ![]() |
---|---|
Report | IR 05000483/2015002 Section 1R13 |
Date counted | Jun 30, 2015 (2015Q2) |
Type: | NCV: Green |
cornerstone | Mitigating Systems |
Identified by: | NRC identified |
Inspection Procedure: | IP 71111.13 |
Inspectors (proximate) | P Elkmann T Hartman T Pruett M Poston-Brown G Guerra M Brooks M Langelier |
Violation of: | 10 CFR 50 Appendix B Criterion V Technical Specification Technical Specification - Procedures |
CCA | H.11, Challenge the Unknown |
INPO aspect | QA.2 |
' | |
Finding - Callaway - IR 05000483/2015002 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Finding List (Callaway) @ 2015Q2
Self-Identified List (Callaway)
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||