| Q | CCA | Title |
---|
05000293/FIN-2015007-05 | 2015Q1 | P.1 | Failure to Identify Condition Adverse to Quality Associated with CS Discharge Header Voiding |
05000293/FIN-2015007-02 | 2015Q1 | P.2 | Failure to Identify, Evaluate, and Correct A SRV Failure to Open Upon Manual Actuation |
05000293/FIN-2015007-07 | 2015Q1 | | Failure to Report a Major Loss of Emergency Assessment Capability |
05000293/FIN-2015403-02 | 2015Q1 | | Security |
05000293/FIN-2015403-03 | 2015Q1 | | Security |
05000293/FIN-2015403-04 | 2015Q1 | | Security |
05000293/FIN-2015403-05 | 2015Q1 | | Security |
05000293/FIN-2015007-08 | 2015Q1 | H.6 | Inadequate Testing of the Diesel-Driven Air Compressor |
05000293/FIN-2015007-06 | 2015Q1 | H.7 | Failure to Implement Compensatory Measures for Out-of-Service EAL Instrumentation |
05000293/FIN-2015007-04 | 2015Q1 | H.8 | Failure to Follow RCIC System Manual Restart Procedure |
05000293/FIN-2015007-03 | 2015Q1 | H.1 | Inadequate Loss of Instrument Air Abnormal Operating Procedure |
05000293/FIN-2015007-01 | 2015Q1 | H.14 | Inadequate Past Operability Assessment of C Safety Relief Valve |
05000293/FIN-2015001-01 | 2015Q1 | P.1 | Failure to Perform Testing of Safety Related Undervoltage Alarm Relays |
05000293/FIN-2015403-01 | 2015Q1 | | Security |
05000293/FIN-2015002-04 | 2015Q2 | P.1 | Failure to Properly Ship Category 2 Radioactive Material Quantity of Concern |
05000293/FIN-2015002-03 | 2015Q2 | P.3 | Failure to Conduct Operations to Minimize the Introduction of Residual Radioactivity to the Site |
05000293/FIN-2015002-02 | 2015Q2 | H.14 | Inadequate Operability Determination for the B EDG Results in TS Violation |
05000293/FIN-2015002-05 | 2015Q2 | H.1 | Failure to Submit an LER |
05000293/FIN-2015002-01 | 2015Q2 | P.2 | Ineffective Corrective Actions leads to Loss of Decay Heat Removal |
05000293/FIN-2015003-05 | 2015Q3 | H.8 | Failure to Comply with RWP Instructions to Contact RP Prior to Condenser Expansion Joint Gasket Removal |
05000293/FIN-2015010-04 | 2015Q3 | | Security |
05000293/FIN-2015010-01 | 2015Q3 | H.6 | Inadequate Procedures for Placing Main Turbine in Service |
05000293/FIN-2015010-02 | 2015Q3 | P.3 | Untimely Actions to Restore Station Meteorological Towers |
05000293/FIN-2015010-03 | 2015Q3 | P.1 | Inadequate Guidance and Invalid Compensatory Measures for Out-of-Service EAL Instrumentation |
05000293/FIN-2015003-01 | 2015Q3 | P.2 | Main Control Room Annunciators 10 CFR 50.65(a)(2) Not Met |
05000293/FIN-2015003-02 | 2015Q3 | H.14 | Inadequate EDG Common Cause Determinations Result in TS Violation |
05000293/FIN-2015003-03 | 2015Q3 | H.12 | Inadequate Operability Assessment of the Shutdown Transformer |
05000293/FIN-2015003-04 | 2015Q3 | | Failure to Provide 10 CFR 50.59 Evaluation Associated with Offsite Power Alignment |
05000293/FIN-2015004-04 | 2015Q4 | | Inadequate Design Control of MSIV Nitrogen Supply Line Support leads to Scram |
05000293/FIN-2016010-02 | 2015Q4 | | Falsification of hourly fire watch logs |
05000293/FIN-2016010-01 | 2015Q4 | | Failure to perform hourly fire watches |
05000293/FIN-2015404-01 | 2015Q4 | H.12 | Security |
05000293/FIN-2015004-03 | 2015Q4 | H.8 | Failure to Identify the Cause of a Significant Condition Adverse to Quality |
05000293/FIN-2015004-02 | 2015Q4 | P.3 | Failure to Properly Implement Procedure Changes in accordance with TS 5.4.1a |
05000293/FIN-2015004-01 | 2015Q4 | H.8 | Inadequate Implementation of Corrective Action following Winter Storm Juno |
05000293/FIN-2015008-01 | 2015Q4 | P.2 | Failure to Analyze Reactor Recirculation System Motor Operated Valves for the Post-fire Cold Shutdown Function |
05000293/FIN-2015404-05 | 2015Q4 | | Security |
05000293/FIN-2015404-04 | 2015Q4 | P.3 | Security |
05000293/FIN-2015404-03 | 2015Q4 | H.5 | Security |
05000293/FIN-2015404-02 | 2015Q4 | H.1 | Security |