Relief Request #11-001-MX, Revision 0, Commitment to Submit Alternate Surveillance Requirements Per 10 CFR 50.55a(a)(3)(i)
ML12270A371
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 09/19/2012
From: Franke J
Duke Energy Corp, Florida Power Corp, Progress Energy Florida
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
3F0912-08
Download: ML12270A371 (3)


Text

PDuke hEnergy Crystal River Nuclear Plant Docket No. 50-302 Operating License No. DPR-72 Ref: 10CFR50.55a September 19, 2012 3F0912-08 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

Subject:

Crystal River Unit 3 (CR-3) - Relief Request (RR) #11-001-MX, Revision 0, Commitment to Submit Alternate Surveillance Requirements Per 10 CFR 50.55a(a)(3)(i)

Reference:

CR-3 letter to NRC dated December 27, 2011, "Relief Request (RR) #11-001-MX, Revision 0, Containment Surveillance Schedule, Fourth 10-Year Interval of the Inservice Inspection (ISI) Program (Second 10-Year Containment ISI Interval) (TAC No. ME7729)" (ADAMS Accession No. 12004A074)

Dear Sir:

In the above cited Reference, Florida Power Corporation (FPC) submitted Relief Request (RR)

  1. 11-001-MX, Revision 0 to suspend the Containment Surveillance Schedule for concrete and unbonded post-tensioning system examinations during the CR-3 containment repair.

By this correspondence, FPC hereby provides a commitment to submit a proposal for alternatives to the requirements in ASME Section XI sub-Section IWL in accordance with 50.55a(a)(3)(i) to establish the surveillance program for the CR-3 repaired containment concrete and unbonded post-tensioning system. 'This subsequent relief request will be submitted one year prior to the completion of the CR-3 containment repair. The commitment is provided in the Enclosure to this letter.

If you have any questions regarding this submittal, please contact Mr. Dan Westcott, Superintendent, Licensing and Regulatory Programs at (352) 563-4796.

Sinc e y, Jo . Franke ce President rystalI River Nuclear Plant JAF/scp Enclosure xc: NRR Project Manager Regional Administrator, Region II Senior Resident Inspector Crystal River Nuclear Plant 15760 W. Powerline Street Crystal River, FL 34428

FLORIDA POWER CORPORATION CRYSTAL RIVER UNIT 3 DOCKET NUMBER 50-302 / LICENSE NUMBER DPR-72 RELIEF REQUEST #11-001-MX, REVISION 0, COMMITMENT TO SUBMIT ALTERNATE SURVEILLANCE REQUIREMENTS PER 10 CFR 50.55A(A)(3)(I)

ENCLOSURE

is U. S. Nuclear Regulatory Commission Enclosure 3F0912-08 Page 1 of 1 LIST OF REGULATORY COMMITMENTS The following table identifies those actions committed to by Florida Power Corporation (FPC) in this document. Any other statements in this submittal are provided for information purposes and are not considered to be regulatory commitments. Please notify the Superintendent, Licensing and Regulatory Programs of any questions regarding this document or any associated regulatory commitments.

Regulatory Commitments Due Date/Event CR-3 will submit a proposal for alternatives to the One year prior to the requirements in ASME Section XI sub-Section IWL in completion of the CR-3 accordance with 50.55a(a)(3)(i) to establish surveillance containment repair.

program for the repaired containment concrete and unbonded post-tensioning system.