3F0614-05, Withdrawal of Request for Exemptions from Certain 10 CFR 73 Physical Security Requirements

From kanterella
Jump to navigation Jump to search

Withdrawal of Request for Exemptions from Certain 10 CFR 73 Physical Security Requirements
ML14184A019
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 06/30/2014
From: Hobbs T
Duke Energy Florida
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
3F0614-05
Download: ML14184A019 (1)


Text

DUKE Crystal River Nuclear Plant 15760 W. Power Line Street ENERGY, Crystal River, FL 34428 Docket 50-302 Operating License No. DPR-72 10 CFR 73 June 30, 2014 3F0614-05 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

Subject:

Crystal River Unit 3 - Withdrawal of Request for Exemptions from Certain 10 CFR 73 Physical Security Requirements

References:

1. CR-3 to NRC letter dated January 15, 2014, "Crystal River Unit 3 - Request for Exemptions from 10 CFR 73, Appendix B, General Criteria for Security Personnel," (ADAMS Accession No. ML14023A662)
2. COMSECY-14-0015, "Security Inspections at U.S. Nuclear Regulatory Commission Decommissioning Reactors," (ADAMS Accession No.

ML13347B178)

Dear Sir:

By letter dated January 15, 2014, Duke Energy Florida, Inc. (DEF), requested exemptions from 10 CFR 73, Appendix B, which if granted, would have eliminated the requirement to perform annual force-on-force exercises (Reference 1). DEF is hereby withdrawing the exemption request for Crystal River Unit 3 as a result of the publication of COMSECY-14-0015, "Security Inspections at U.S. Nuclear Regulatory Commission Decommissioning Reactors," (Reference 2). COMSECY-14-0015 outlines the NRC staff's intended approach for security inspections at decommissioning power reactors.

No new regulatory commitments are contained in this submittal.

If you have any questions regarding this submittal, please contact Mr. Dan Westcott, Manager, Nuclear Regulatory Affairs at (352) 563-4796.

Sincerely, Terry D. Hobbs, General Manager, Decommissioning TDH/scp xc: Regional Administrator, Region I NRR Project Manager