MONTHYEAR3F0623-01, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-06-0101 June 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G 3F0423-03, 2022 Annual Radiological Environmental Operating Report2023-04-18018 April 2023 2022 Annual Radiological Environmental Operating Report 3F0423-02, 2022 Annual Radioactive Effluent Release Report2023-04-18018 April 2023 2022 Annual Radioactive Effluent Release Report 3F0423-01, 2022 Individual Monitoring NRC Form 5 Report2023-04-0404 April 2023 2022 Individual Monitoring NRC Form 5 Report 3F0323-03, Decommissioning Funding Plan for Independent Spent Fuel Storage Installation2023-03-31031 March 2023 Decommissioning Funding Plan for Independent Spent Fuel Storage Installation 3F0323-02, Annual Decommissioning and Irradiated Fuel Management Financial Status Report for 20222023-03-29029 March 2023 Annual Decommissioning and Irradiated Fuel Management Financial Status Report for 2022 3F0323-01, Onsite Property Insurance Coverage2023-03-0202 March 2023 Onsite Property Insurance Coverage 3F0123-01, Proof of Financial Protection2023-01-26026 January 2023 Proof of Financial Protection 3F1222-01, Nuclear Power Station - License Amendment Request 262 Addition of License Condition 2.C.21, License Termination Plan2022-12-12012 December 2022 Nuclear Power Station - License Amendment Request 262 Addition of License Condition 2.C.21, License Termination Plan 3F0522-03, Notification of Revised Decommissioning Cost Estimate2022-05-26026 May 2022 Notification of Revised Decommissioning Cost Estimate 3F0522-01, Safety Analysis Report, Quality Assurance Program and 10 CFR 50.59 - 10 CFR 72.48 Report - May 20222022-05-17017 May 2022 Safety Analysis Report, Quality Assurance Program and 10 CFR 50.59 - 10 CFR 72.48 Report - May 2022 3F0422-02, 2021 Annual Radiological Environmental Operating Report2022-04-0606 April 2022 2021 Annual Radiological Environmental Operating Report 3F0322-01, Annual Decommissioning and Irradiated Fuel Management Financial Status Report for 20212022-03-30030 March 2022 Annual Decommissioning and Irradiated Fuel Management Financial Status Report for 2021 3F0322-03, Drug and Alcohol Testing Error at HHS-Certified Laboratory, Per 10CFR26.719(c)(1)2022-03-10010 March 2022 Drug and Alcohol Testing Error at HHS-Certified Laboratory, Per 10CFR26.719(c)(1) 3F0322-02, 2021 Individual Monitoring NRC Form 5 Report2022-03-0707 March 2022 2021 Individual Monitoring NRC Form 5 Report 3F0222-01, ADP CR3, LLC - Update to Irradiated Fuel Management Program Pursuant to 10 CFR 50.54(bb)2022-02-0909 February 2022 ADP CR3, LLC - Update to Irradiated Fuel Management Program Pursuant to 10 CFR 50.54(bb) 3F0222-02, Onsite Property Insurance Coverage2022-02-0909 February 2022 Onsite Property Insurance Coverage 3F0122-01, License Amendment Request to Remove from the Facility Operating License, Appendix B, Environmental Protection Plan (Non-Radiological) Technical Specifications2022-01-26026 January 2022 License Amendment Request to Remove from the Facility Operating License, Appendix B, Environmental Protection Plan (Non-Radiological) Technical Specifications 3F0122-02, Proof of Financial Protection2022-01-17017 January 2022 Proof of Financial Protection 3F0122-03, Complex - Environmental Protection Plan Report: 2021 Sea Turtle Rescue and Recovery Summary Report2022-01-17017 January 2022 Complex - Environmental Protection Plan Report: 2021 Sea Turtle Rescue and Recovery Summary Report 3F1021-01, Report of Investigation Pursuant to 10 CFR 20, Appendix G2021-10-21021 October 2021 Report of Investigation Pursuant to 10 CFR 20, Appendix G 3F0921-02, Reporting Related to the National Pollutant Discharge Elimination System (NPDES) Permit Id FL0A00004 (Minor) (Rev. C)2021-09-29029 September 2021 Reporting Related to the National Pollutant Discharge Elimination System (NPDES) Permit Id FL0A00004 (Minor) (Rev. C) 3F0921-01, to License Amendment Request, Revision 0, ISFSI Security Plan, Revision a2021-09-14014 September 2021 to License Amendment Request, Revision 0, ISFSI Security Plan, Revision a 3F0721-01, Report of Investigation Pursuant to 10 CFR 20, Appendix G2021-07-13013 July 2021 Report of Investigation Pursuant to 10 CFR 20, Appendix G 3F0621-02, Reporting Related to the National Pollutant Discharge Elimination System (NPDES) Permit Id FL0A00004-001-IW1S2021-06-16016 June 2021 Reporting Related to the National Pollutant Discharge Elimination System (NPDES) Permit Id FL0A00004-001-IW1S 3F0421-05, 2020 Individual Monitoring NRC Form 5 Report2021-04-27027 April 2021 2020 Individual Monitoring NRC Form 5 Report 3F0421-04, ADP CR3, LLC - Supplement to Application for Order Approving Indirect Transfers of Control of Licenses in Connection with Internal Corporate Reorganization2021-04-13013 April 2021 ADP CR3, LLC - Supplement to Application for Order Approving Indirect Transfers of Control of Licenses in Connection with Internal Corporate Reorganization 3F0421-03, Proof of Financial Protection2021-04-0707 April 2021 Proof of Financial Protection 3F0421-01, 2020 Annual Radioactive Effluent Release Report2021-04-0606 April 2021 2020 Annual Radioactive Effluent Release Report 3F0421-02, 2020 Annual Radiological Environmental Operating Report2021-04-0606 April 2021 2020 Annual Radiological Environmental Operating Report 3F0321-07, (XEG)-DOE/NRC Forms 741 742 and 743C2021-03-30030 March 2021 (XEG)-DOE/NRC Forms 741 742 and 743C 3F0321-06, Annual Decommissioning and Irradiated Fuel Management Financial Status Report for 20202021-03-29029 March 2021 Annual Decommissioning and Irradiated Fuel Management Financial Status Report for 2020 3F0321-01, License Amendment Request, Revision to Independent Spent Fuel Storage Installation (ISFSI)-Only Emergency Plan, Draft a, and ISFSI Only Emergency Action Level Bases Manual2021-03-17017 March 2021 License Amendment Request, Revision to Independent Spent Fuel Storage Installation (ISFSI)-Only Emergency Plan, Draft a, and ISFSI Only Emergency Action Level Bases Manual 3F0321-02, License Amendment Request, Rev. 0, ISFSI Security Plan, Rev. a2021-03-17017 March 2021 License Amendment Request, Rev. 0, ISFSI Security Plan, Rev. a 3F0321-05, Onsite Property Insurance Coverage2021-03-15015 March 2021 Onsite Property Insurance Coverage 3F0321-03, Report of Investigation Pursuant to 10 CFR 20, Appendix G2021-03-0909 March 2021 Report of Investigation Pursuant to 10 CFR 20, Appendix G 3F0221-02, Report of Investigation Pursuant to 10 CFR 20, Appendix G2021-02-17017 February 2021 Report of Investigation Pursuant to 10 CFR 20, Appendix G 3F0221-01, ADP CR3, Llc., Crystal River Energy Complex - Environmental Protection Plan Report: 2020 Sea Turtle Rescue and Recovery Summary Report2021-02-0202 February 2021 ADP CR3, Llc., Crystal River Energy Complex - Environmental Protection Plan Report: 2020 Sea Turtle Rescue and Recovery Summary Report 3F0121-02, Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E2021-01-19019 January 2021 Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E 3F0121-01, Report of Investigation Pursuant to 10 CFR 20, Appendix G2021-01-19019 January 2021 Report of Investigation Pursuant to 10 CFR 20, Appendix G 3F1120-02, and Crystal River Nuclear Plant - Application for Order Approving Indirect Transfers of Control of Licenses in Connection with Internal Corporate Reorganization2020-11-19019 November 2020 and Crystal River Nuclear Plant - Application for Order Approving Indirect Transfers of Control of Licenses in Connection with Internal Corporate Reorganization 3F0920-02, Request to Transfer the Quality Assurance Program Approval Form for Radioactive Material Packages2020-09-15015 September 2020 Request to Transfer the Quality Assurance Program Approval Form for Radioactive Material Packages 3F0920-01, License Transfer - Notification of Transfer Date2020-09-15015 September 2020 License Transfer - Notification of Transfer Date 3F0720-03, ISFSI Only Emergency Plan and Implementing Procedure2020-07-21021 July 2020 ISFSI Only Emergency Plan and Implementing Procedure 3F0720-02, License Transfer - Insurance Required of a Licensee Under 10 CFR 140.11(a)(4) and 10 CFR 50.54(w)2020-07-15015 July 2020 License Transfer - Insurance Required of a Licensee Under 10 CFR 140.11(a)(4) and 10 CFR 50.54(w) 3F0520-01, Safety Analysis Report, Quality Assurance Program and 10 CFR 50.59 - 10 CFR 72.48 Report - May 20202020-05-18018 May 2020 Safety Analysis Report, Quality Assurance Program and 10 CFR 50.59 - 10 CFR 72.48 Report - May 2020 3F0420-03, Supplemental Information in Support of Crystal River Unit 3 License Transfer Application - Amended License Conditions2020-04-22022 April 2020 Supplemental Information in Support of Crystal River Unit 3 License Transfer Application - Amended License Conditions 3F0420-01, 2019 Annual Radioactive Effluent Release Report2020-04-0707 April 2020 2019 Annual Radioactive Effluent Release Report 3F0420-02, 2019 Radiological Environmental Operating Report2020-04-0707 April 2020 2019 Radiological Environmental Operating Report 3F0320-04, Decommissioning Funding Plan for Independent Spent Fuel Storage Installation2020-03-19019 March 2020 Decommissioning Funding Plan for Independent Spent Fuel Storage Installation 2023-06-01
[Table view] |
Text
Crystal River Nuclear Plant
"._-, DUKE 15760 W. Power Line Street Crystal River, FL 34428
~ ENERGY Docket 50-302 Operating License No. DPR-72 10 CFR 50.82(a)(7)
May 09, 2018 3F0518-01 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001
Subject:
Crystal River Unit 3 - Notification of Schedule and Cost Change for the Post-Shutdown Decommissioning Activities Report
References:
CR-3 to NRC, dated December 2, 2013, "Post-Shutdown Decommissioning Activities Report," (ADAMS Accession No. ML13340A009)
Dear Sir:
Pursuant to 10 CFR 50.82(a)(7), Duke Energy Florida, LLC, (DEF) is submitting notification that DEF is preparing to perform certain activities that constitute a schedule and cost change from those actions and schedules described in the Crystal River Unit 3 (CR-3) Post-Shutdown Decommissioning Activities Report (PSDAR) and associated Site-Specific Decommissioning Cost Estimate (DCE).
Specifically, the changes are as follows:
- 1. The spent fuel storage racks are to be removed from the spent fuel pools and shipped offsite for disposal. This activity was initially expected to occur during Decommissioning Period 4 as described in the PSDAR. The removal of the racks was not specifically called out in the PSDAR, but is included in the decontamination and dismantlement activities associated with the Spent Fuel Building. As such, the cost for this activity (approximately $1.9 Million) is included into the cost of decommissioning, however the activity is moving up in schedule and the expense will occur in Period 2b.
- 2. Additional modifications to the plant are also being planned that were not considered in the PSDAR. These activities are to situate the plant to be able to remain in a cold and dark configuration for SAFSTOR II, while minimizing the risks associated with the existing plant systems. These activities include: a) revising the electrical distribution system to remove power from the power block and provide temporary power as needed for operation of lighting or equipment; b) revise the fire protection system to remove Fire Service water from within the power block and replace it with an external ring header and standpipes in the plant; and c) replace the plant ventilation system from the existing system to one system mounted above the Sea Water room that will draw air through the plant and exhaust it at one location. The ventilation system change will allow for the abandonment of the existing system with its many fans and dampers that require substantial power and maintenance as compared to a new system designed for
U.S. Nuclear Regulatory Commission Page 2 of 2 3F0518-01 simplicity. Since these modifications were not addressed in the PSDAR, there is no impact on the schedule discussed in the PSDAR. However, these are activities that were not previously considered or reported in the PSDAR or DCE. The combined cost of these activities is expected to cost approximately $3.1 Million.
An evaluation of the estimated impacts of performing these activities and modifications concludes that the changes would not jeopardize CR-3's ability to demonstrate financial assurance as indicated in CR-3's Financial Status Report for 2017, Attachment 2, Estimate of Costs to Complete Decommissioning and Financial Assurance Demonstration (ADAMS Accession No. ML18086A188).
There are no new regulatory commitments made within this submittal.
If you have any questions regarding this submittal, please contact Mr. Philip Rose, Licensing Engineer, at (352) 501-3172.
Sincerely, Ro&istP.:,l £dent Operations Support RRR/par xc: NRR Project Manager Regional Administrator, Region I
Crystal River Nuclear Plant
"._-, DUKE 15760 W. Power Line Street Crystal River, FL 34428
~ ENERGY Docket 50-302 Operating License No. DPR-72 10 CFR 50.82(a)(7)
May 09, 2018 3F0518-01 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001
Subject:
Crystal River Unit 3 - Notification of Schedule and Cost Change for the Post-Shutdown Decommissioning Activities Report
References:
CR-3 to NRC, dated December 2, 2013, "Post-Shutdown Decommissioning Activities Report," (ADAMS Accession No. ML13340A009)
Dear Sir:
Pursuant to 10 CFR 50.82(a)(7), Duke Energy Florida, LLC, (DEF) is submitting notification that DEF is preparing to perform certain activities that constitute a schedule and cost change from those actions and schedules described in the Crystal River Unit 3 (CR-3) Post-Shutdown Decommissioning Activities Report (PSDAR) and associated Site-Specific Decommissioning Cost Estimate (DCE).
Specifically, the changes are as follows:
- 1. The spent fuel storage racks are to be removed from the spent fuel pools and shipped offsite for disposal. This activity was initially expected to occur during Decommissioning Period 4 as described in the PSDAR. The removal of the racks was not specifically called out in the PSDAR, but is included in the decontamination and dismantlement activities associated with the Spent Fuel Building. As such, the cost for this activity (approximately $1.9 Million) is included into the cost of decommissioning, however the activity is moving up in schedule and the expense will occur in Period 2b.
- 2. Additional modifications to the plant are also being planned that were not considered in the PSDAR. These activities are to situate the plant to be able to remain in a cold and dark configuration for SAFSTOR II, while minimizing the risks associated with the existing plant systems. These activities include: a) revising the electrical distribution system to remove power from the power block and provide temporary power as needed for operation of lighting or equipment; b) revise the fire protection system to remove Fire Service water from within the power block and replace it with an external ring header and standpipes in the plant; and c) replace the plant ventilation system from the existing system to one system mounted above the Sea Water room that will draw air through the plant and exhaust it at one location. The ventilation system change will allow for the abandonment of the existing system with its many fans and dampers that require substantial power and maintenance as compared to a new system designed for
U.S. Nuclear Regulatory Commission Page 2 of 2 3F0518-01 simplicity. Since these modifications were not addressed in the PSDAR, there is no impact on the schedule discussed in the PSDAR. However, these are activities that were not previously considered or reported in the PSDAR or DCE. The combined cost of these activities is expected to cost approximately $3.1 Million.
An evaluation of the estimated impacts of performing these activities and modifications concludes that the changes would not jeopardize CR-3's ability to demonstrate financial assurance as indicated in CR-3's Financial Status Report for 2017, Attachment 2, Estimate of Costs to Complete Decommissioning and Financial Assurance Demonstration (ADAMS Accession No. ML18086A188).
There are no new regulatory commitments made within this submittal.
If you have any questions regarding this submittal, please contact Mr. Philip Rose, Licensing Engineer, at (352) 501-3172.