3F0318-02, Submittal of Physical Security Plan, Security Training and Qualification Plan, and Safeguards Contingency Plan, Revision 5

From kanterella
Jump to navigation Jump to search
Submittal of Physical Security Plan, Security Training and Qualification Plan, and Safeguards Contingency Plan, Revision 5
ML18082A368
Person / Time
Site: Crystal River  Duke Energy icon.png
Issue date: 03/22/2018
From: Hobbs T
Duke Energy Florida
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
3F0318-02
Download: ML18082A368 (4)


Text

Crystal River Nuclear Plant

{_ia, DUKE 15760 W . Power Line Street Crystal River, FL 34428 ENERGY Docket 50-302 Docket 72-1035 Operating License No. DPR-72 10CFR 50.54(p)

March 22, 2018 3F0318-02 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

Subject:

Crystal River Unit 3- Physical Security Plan, Security Training and Qualification Plan, and Safeguards Contingency Plan, Revision 5

Dear Sir:

In accordance with 10 CFR 50.54(p), Duke Energy Florida, LLC (DEF) hereby submits the Crystal River Unit 3 (CR-3) Physical Security Plan, Security Training and Qualification Plan ,

and Safeguards Contingency Plan, Revision 5.

An evaluation of the plan revision, in accordance with 10 CFR 50.54(p)(2), has determined that the incorporated changes do not reduce the effectiveness of the plan and that the plan continues to meet the standards of 10 CFR 73.55.

This letter includes two enclosures that contain Safeguards Information as defined in 10 CFR 73.2. Enclosure 1 contains a Summary Description of Changes. Enclosure 2 contains the 50.54(p) Determination for X/Y Reduction and Conforming Changes. Enclosure 3 contains a copy of the DEF Physical Security Plan, Security Training and Qual~ication Plan, and Safeguards Contingency Plan, Revision 5.

No new regulatory commitments have been made in this letter.

If you have any q stions regarding this submittal, please contact Mr. Mark Van Sicklen, Licensing Lead, Nuc ar Regulatory Affairs, at (352) 501-3045.

TDH/mvs

Enclosures:

1. Summary Description of Changes [Safeguards]
2. 50.54(p) Determination for X/Y Reduction and Conforming Changes [Safeguards]
3. Physical Security Plan , Security Training and Qualification Plan, and Safeguards Contingency Plan, Revision 5 [Safeguards]

Soo l xc: NMSS Project Manager Regional Administrator, Region I ;Jf!_fc NOTE: ENCLOSURE 1, 2 AND 3 TO THIS LETIER CONTAIN "SAFEGUARDS INFORMATION."

THIS INFORMATION MUST BE PROTECTED ACCORDINGLY.

UPON SEPARATION OF THESE ENCLOSURES, THIS LETTER IS "DECONTROLLED."

U. S. Nuclear Regulatory Commission Enclosure 1 3F0318-02 DUKE ENERGY FLORIDA, LLC DOCKET NUMBERS 50 - 302 / 72 - 1035 LICENSE NUMBER DPR - 72 ENCLOSURE1

SUMMARY

DESCRIPTION OF CHANGES

U.S. Nuclear Regulatory Commission Enclosure 2 3F0318-02 DUKE ENERGY FLORIDA, LLC DOCKET NUMBERS 50 - 302 / 72 - 1035 LICENSE NUMBER DPR - 72 ENCLOSURE 2 50.54(p) DETERMINATION FOR XIV REDUCTION AND CONFORMING CHANGES

U.S. Nuclear Regulatory Commission Enclosure 3 3F0318-02 DUKE ENERGY FLORIDA, LLC*

DOCKET NUMBERS 50 - 302 / 72 - 1035 LICENSE NUMBER DPR - 72 ENCLOSURE 3 PHYSICAL SECURITY PLAN, SECURITY TRAINING AND QUALIFICATION PLAN, AND SAFEGUARDS CONTINGENCY PLAN, REVISION 5