MONTHYEARML1213105622012-05-10010 May 2012 Acceptance Review Email, License Amendment Request to Revise Technical Specifications Related to Revised Fuel Assembly Drop Analysis and Adoption of TSTF-51, TSTF-272, TSTF-286, and TSTF-471 Project stage: Acceptance Review ML13164A0312013-06-12012 June 2013 Request for Additional Information Email, License Amendment Request, Revise Technical Specifications Related to Revised Fuel Assembly Drop Analysis and Adoption of TSTF-51, TSTF-272, TSTF-286, and TSTF-471 Project stage: RAI 2CAN061302, License Amendment Request - Supplemental Technical Specification (TS) Change Related to Revised Fuel Assembly Drop Analysis and Adoption of TSTF-51, TSTF-272, TSTF-286, and TSTF-4712013-06-18018 June 2013 License Amendment Request - Supplemental Technical Specification (TS) Change Related to Revised Fuel Assembly Drop Analysis and Adoption of TSTF-51, TSTF-272, TSTF-286, and TSTF-471 Project stage: Supplement 2CAN041401, License Amendment Request - Withdrawal Technical Specification (TS) Change Related to Revised Fuel Assembly Drop Analysis and Adoption of TSTF-51, TSTF-272, TSTF-286 and TSTF-4712014-04-23023 April 2014 License Amendment Request - Withdrawal Technical Specification (TS) Change Related to Revised Fuel Assembly Drop Analysis and Adoption of TSTF-51, TSTF-272, TSTF-286 and TSTF-471 Project stage: Request ML14119A2562014-04-30030 April 2014 Letter + FRN, Withdrawal of License Amendment Request to Revise Technical Specifications Related to Revised Fuel Assembly Drop Analysis and Adoption of TSTF-51, TSTF-272, TSTF-286, and TSTF-471 Project stage: Withdrawal ML14119A2532014-04-30030 April 2014 FRN, Withdrawal of License Amendment Request to Revise Technical Specifications Related to Revised Fuel Assembly Drop Analysis and Adoption of TSTF-51, TSTF-272, TSTF-286, and TSTF-471 Project stage: Withdrawal NRC-2014-0106, FRN, Withdrawal of License Amendment Request to Revise Technical Specifications Related to Revised Fuel Assembly Drop Analysis and Adoption of TSTF-51, TSTF-272, TSTF-286, and TSTF-4712014-04-30030 April 2014 FRN, Withdrawal of License Amendment Request to Revise Technical Specifications Related to Revised Fuel Assembly Drop Analysis and Adoption of TSTF-51, TSTF-272, TSTF-286, and TSTF-471 Project stage: Withdrawal 2CAN051403, License Amendment Request Supplemental, Adoption of Technical Specification Task Force (TSTF)-422, Revision 2, Change in Technical Specifications End States (CE NPSD-1186).2014-05-12012 May 2014 License Amendment Request Supplemental, Adoption of Technical Specification Task Force (TSTF)-422, Revision 2, Change in Technical Specifications End States (CE NPSD-1186). Project stage: Supplement 2013-06-18
[Table View] |
|
---|
Category:Letter type:
MONTHYEAR0CAN102401, Response to Request for Additional Information - Arkansas Nuclear One – Units 1 and 2, Proposed Alternatives ANO1-ISI-24-01 and ANO2-ISI-24-01 for Examinations of Steam Generator Pressure-Retaining Welds and Full Penetration Welded Nozzle2024-10-16016 October 2024 Response to Request for Additional Information - Arkansas Nuclear One – Units 1 and 2, Proposed Alternatives ANO1-ISI-24-01 and ANO2-ISI-24-01 for Examinations of Steam Generator Pressure-Retaining Welds and Full Penetration Welded Nozzles 2CAN102401, Cycle 31 Core Operating Limits Report (COLR)2024-10-14014 October 2024 Cycle 31 Core Operating Limits Report (COLR) 1CAN082401, Inservice Inspection Summary Report for the Arkansas Nuclear One, Unit 1 Thirty-First Refueling Outage (1R312024-08-13013 August 2024 Inservice Inspection Summary Report for the Arkansas Nuclear One, Unit 1 Thirty-First Refueling Outage (1R31 2CAN072401, Proposed Alternative for Implementation of Extended Reactor Vessel In-Service Inspection Interval (ANO2-ISI-24-02)2024-07-19019 July 2024 Proposed Alternative for Implementation of Extended Reactor Vessel In-Service Inspection Interval (ANO2-ISI-24-02) 0CAN072401, Annual 10 CFR 50.46 Report for Calendar Year 2023 Emergency Core Cooling System Evaluation Changes2024-07-0808 July 2024 Annual 10 CFR 50.46 Report for Calendar Year 2023 Emergency Core Cooling System Evaluation Changes 1CAN072401, Request for Review and Approval of Changes to the Safety Analysis Report and to a Confirmatory Order Clarifying an Alternate Means of Compliance for Pressurizer Heaters Emergency Power Supply2024-07-0202 July 2024 Request for Review and Approval of Changes to the Safety Analysis Report and to a Confirmatory Order Clarifying an Alternate Means of Compliance for Pressurizer Heaters Emergency Power Supply 0CAN062403, Groundwater Protection Initiative - Voluntary Special Report for Tritium Levels2024-06-25025 June 2024 Groundwater Protection Initiative - Voluntary Special Report for Tritium Levels 0CAN062402, Proposed Alternatives ANO1-ISI-24-01 and ANO2-ISI-24-01 for Examinations of Steam Generator Pressure-Retaining Welds and Full Penetration Welded Nozzles2024-06-0606 June 2024 Proposed Alternatives ANO1-ISI-24-01 and ANO2-ISI-24-01 for Examinations of Steam Generator Pressure-Retaining Welds and Full Penetration Welded Nozzles 0CAN052401, – Units 1 and 2, Submittal of Annual Radiological Environmental Operating Report for 20232024-05-13013 May 2024 – Units 1 and 2, Submittal of Annual Radiological Environmental Operating Report for 2023 1CAN052401, Cycle 32 Core Operating Limits Report2024-05-0404 May 2024 Cycle 32 Core Operating Limits Report 2CAN042403, Response to the Request for Additional Information Regarding ANO-2 License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended C2024-04-24024 April 2024 Response to the Request for Additional Information Regarding ANO-2 License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended C 0CAN042402, Annual Occupational Radiation Exposure Report for 20232024-04-23023 April 2024 Annual Occupational Radiation Exposure Report for 2023 0CAN042401, Radioactive Effluent Release Report for the 2023 Calendar Year2024-04-15015 April 2024 Radioactive Effluent Release Report for the 2023 Calendar Year 2CAN042402, Special Report of Non-functional Main Steam Line Radiation Monitor2024-04-11011 April 2024 Special Report of Non-functional Main Steam Line Radiation Monitor 2CAN042401, Request to Revise Typographical Errors in Arkansas Nuclear One, Unit 2 Technical Specifications2024-04-0404 April 2024 Request to Revise Typographical Errors in Arkansas Nuclear One, Unit 2 Technical Specifications 2CAN012401, U.S. Additional Protocol2024-01-17017 January 2024 U.S. Additional Protocol 2CAN012403, Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42024-01-11011 January 2024 Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 0CAN012401, Registration of Cask Use2024-01-10010 January 2024 Registration of Cask Use 1CAN122301, Responses to Request for Additional Information for Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISl-037)2023-12-14014 December 2023 Responses to Request for Additional Information for Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISl-037) 2CAN112302, Submittal of Amendment 31 to Safety Analysis Report2023-11-16016 November 2023 Submittal of Amendment 31 to Safety Analysis Report 0CAN102303, Registration of Cask Use2023-10-24024 October 2023 Registration of Cask Use 0CAN102302, (ANO) Emergency Plan Revision 49 and Emergency Plan On-Shift Staffing Analysis Revision 32023-10-11011 October 2023 (ANO) Emergency Plan Revision 49 and Emergency Plan On-Shift Staffing Analysis Revision 3 0CAN102301, Evacuation Time Estimate (ETE) Study2023-10-0404 October 2023 Evacuation Time Estimate (ETE) Study 1CAN092301, Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42023-09-21021 September 2023 Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 0CAN092302, Supplement to Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (ANO-CISI-002)2023-09-14014 September 2023 Supplement to Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (ANO-CISI-002) 2CAN092301, Reply to a Notice of Violation2023-09-0808 September 2023 Reply to a Notice of Violation 0CAN092301, Emergency Plan Implementing Procedure Revision2023-09-0505 September 2023 Emergency Plan Implementing Procedure Revision 0CAN082301, Units 1 and 2 - Changes to the Quality Assurance Program Approval Form for Radioactive Material Package No. 03412023-08-17017 August 2023 Units 1 and 2 - Changes to the Quality Assurance Program Approval Form for Radioactive Material Package No. 0341 2CAN082301, Inservice Inspection Summary Report for the Arkansas Nuclear One, Unit 2, Twenty-Ninth Refueling Outage (2R29)2023-08-10010 August 2023 Inservice Inspection Summary Report for the Arkansas Nuclear One, Unit 2, Twenty-Ninth Refueling Outage (2R29) 0CAN072301, Registration of Cask Use2023-07-18018 July 2023 Registration of Cask Use 1CAN062304, Supplement Related to License Amendment Request to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation2023-06-29029 June 2023 Supplement Related to License Amendment Request to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation 0CAN062301, Status of Actions to Return to Compliance2023-06-26026 June 2023 Status of Actions to Return to Compliance 0CAN062302, Submittal of Revision 22 of the ANO Fire Hazards Analysis2023-06-20020 June 2023 Submittal of Revision 22 of the ANO Fire Hazards Analysis 1CAN062301, Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISI-037)2023-06-0808 June 2023 Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISI-037) 0CAN052303, Annual 10 CFR 50.46 Report for Calendar Year 20222023-05-24024 May 2023 Annual 10 CFR 50.46 Report for Calendar Year 2022 0CAN052302, Emergency Plan Rev. 482023-05-11011 May 2023 Emergency Plan Rev. 48 0CAN052301, Units 1 and 2 - Annual Radiological Environmental Operating Report for 20222023-05-0909 May 2023 Units 1 and 2 - Annual Radiological Environmental Operating Report for 2022 2CAN052301, Cycle 30 Core Operating Limits Report (COLR)2023-05-0303 May 2023 Cycle 30 Core Operating Limits Report (COLR) 0CAN042302, Annual Occupational Radiation Exposure Report for 20222023-04-27027 April 2023 Annual Occupational Radiation Exposure Report for 2022 0CAN042301, Radioactive Effluent Release Report for 20222023-04-14014 April 2023 Radioactive Effluent Release Report for 2022 2CAN042301, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42023-04-0505 April 2023 License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 1CAN032301, License Amendment Request to Modify the Arkansas Nuclear One, Unit 1, Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Control Oil Pressure2023-03-30030 March 2023 License Amendment Request to Modify the Arkansas Nuclear One, Unit 1, Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Control Oil Pressure 2CAN032304, Supplement to the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 462023-03-29029 March 2023 Supplement to the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 46 2CAN032303, Responses to Request for Additional Information Concerning the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 462023-03-29029 March 2023 Responses to Request for Additional Information Concerning the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 46 2CAN032305, 03 Post Examination Analysis2023-03-23023 March 2023 03 Post Examination Analysis 1CAN032302, Inspection Summary Report for the Thirtieth Refueling Outage (1R30)2023-03-20020 March 2023 Inspection Summary Report for the Thirtieth Refueling Outage (1R30) 1CAN012301, Responses to Request for Additional Information for Request for Relief ANO1-ISI-0352023-01-30030 January 2023 Responses to Request for Additional Information for Request for Relief ANO1-ISI-035 2CAN012303, U.S. Additional Protocol2023-01-23023 January 2023 U.S. Additional Protocol 2CAN012302, Relief Request ANO2-RR-23-001, Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 462023-01-20020 January 2023 Relief Request ANO2-RR-23-001, Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 46 1CAN122201, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42022-12-22022 December 2022 License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 2024-08-13
[Table view] |
Text
Entergy Operations, Inc.
1448 S.R. 333 Russellville, AR 72802 Tel 479-858-3110 Jeremy G. Browning Vice President - Operations Arkansas Nuclear One 2CAN041401 April 23, 2014 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555
SUBJECT:
License Amendment Request - Withdrawal Technical Specification (TS) Change Related to Revised Fuel Assembly Drop Analysis and Adoption of TSTF-51, TSTF-272, TSTF-286, and TSTF-471 Arkansas Nuclear One, Unit 2 Docket No. 50-368 License No. NPF-6
REFERENCES:
- 1. Entergy letter dated April 4, 2012, License Amendment Request -
Technical Specification (TS) Change Related to Revised Fuel Assembly Drop Analysis and Adoption of TSTF-51, TSTF-272, TSTF-286, and TSTF-471 (2CAN041201) (ML12096A022) (TAC No. ME8348)
- 2. NRC email dated May 10, 2012, Proposed License Amendment Request to Technical Specification (TS) Change Related to Revised Fuel Assembly Drop Analysis and Adoption of TSTF-51, TSTF-272, TSTF-286, and TSTF-471 (ML121310562)
- 3. Entergy letter dated July 9, 2012, License Amendment Request -
Supplemental - Technical Specification (TS) Change Related to Revised Fuel Assembly Drop Analysis and Adoption of TSTF-51, TSTF-272, TSTF-286, and TSTF-471 (2CAN071201) (ML12192A089)
Dear Sir or Madam:
With regard to Reference 1, Entergy Operations, Inc. (Entergy) submitted a request to amend the Technical Specifications (TSs) for Arkansas Nuclear One, Unit 2 (ANO-2) related to a revised fuel assembly drop analysis and adoption of NRC-approved Technical Specification Task Force (TSTF) Standard Technical Specification Change Travelers TSTF-51, TSTF-272, TSTF-286, and TSTF-471. By email dated May 10, 2012 (Reference 2), the NRC accepted the proposed amendment for review and notified Entergy of supplemental information that would be necessary for the NRC to complete the overall review of the Reference 1 submittal. Entergy submitted the requested supplemental information in letter dated July 9, 2012 (Reference 3).
2CAN041401 Page 2 of 3 Recent contact with the NRC Staff has indicated that the NRC cannot complete the review of the requested change. This has resulted in a decision by Entergy to withdraw the subject amendment request. Entergy is disappointed that the NRC cannot complete the review considering the last Request for Additional Information was responded to in June 2013 and considering ANO has expended more than $240,000.00 in NRC review fees associated with the amendment request to date.
Entergy does understand the NRC staff has some open concerns noted in a letter to the TSTF.
These concerns were slanted toward generic application of the TSTFs to all plant types. ANO had provided significant detail to address these concerns. A brief history of the amendment request is attached.
To date, no additional RAIs have been issued to ANO in relation to the subject amendment request. Absent adoption of the subject TSTFs, ANOs ability to gain the intended operational flexibility which has previously been approved by the NRC for other plants cannot be realized.
Regardless, significant delays and costs will be realized with regard to resolving the non-conservative TSs involved.
Notwithstanding the above, Entergy requests the subject letters be withdrawn from further NRC review. Any commitments contained with correspondence directly related to the subject amendment request are also withdrawn. There are no new commitments contained in this letter.
If you have any questions or require additional information, please contact Stephenie Pyle at 479-858-4704.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on April 23, 2014.
Sincerely, ORIGINAL SIGNED BY JEREMY G. BROWNING JGB/dbb
Attachment:
Historical Timeline of Entergy Letter Dated April 4, 2012 License Amendment Request - Technical Specification (TS) Change Related to Revised Fuel Assembly Drop Analysis and Adoption of TSTF-51, TSTF-272, TSTF-286, and TSTF-471
2CAN041401 Page 3 of 3 cc: Mr. Marc L. Dapas Regional Administrator U. S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 NRC Senior Resident Inspector Arkansas Nuclear One P. O. Box 310 London, AR 72847 U. S. Nuclear Regulatory Commission Attn: Mr. Peter Bamford MS O-8B3 One White Flint North 11555 Rockville Pike Rockville, MD 20852 Mr. Bernard R. Bevill Arkansas Department of Health Radiation Control Section 4815 West Markham Street Slot #30 Little Rock, AR 72205
ATTACHMENT to 2CAN041401 HISTORICAL TIMELINE OF ENTERGY LETTER DATED APRIL 4, 2012 License Amendment Request - Technical Specification (TS) Change Related to Revised Fuel Assembly Drop Analysis and Adoption of TSTF-51, TSTF-272, TSTF-286, and TSTF-471
Attachment to 2CAN041401 Page 1 of 3 Historical Timeline of Entergy Letter Dated April 4, 2012 License Amendment Request - Technical Specification (TS) Change Related to Revised Fuel Assembly Drop Analysis and Adoption of TSTF-51, TSTF-272, TSTF-286, and TSTF-471 The approximate time since original submittal is also included.
Date Subject Because the proposed ANO submittal would address non-conservative TSs and adopt previously NRC-approved TSTFs October 5, 2011 associated with these TSs, a pre-submittal meeting between ANO and NRR personnel was held at NRR headquarters. NRC comments were addressed in ANOs original submittal (Reference 1).
April 4, 2012 Amendment request submitted (Reference 1) (T = 0)
Supplemented the amendment request to more fully adopt TSTF-51 at July 12, 2012 NRC request. (T + 3 months)
By email, the NRC identified minor changes needed to complete the review process. The NRC also requested that all of Attachment 1 of the Reference 3 letter be resubmitted and all the TS pages be June 12, 2013 resubmitted, in order for this final supplement to represent a complete package. Entergy submitted the requested supplemental information in letter dated June 18, 2013 (Reference 5). (T + 1 year, 2 months)
Response to June 12, 2013, RAIs submitted (Reference 5).
June 18, 2013 (T + 1 year, 2 months)
During subsequent review of Attachment 2 of the Reference 5 supplemental letter, an error was discovered on the markup of TS page 3/4 3-25 in that the markup page did not exactly match the corresponding clean (revised) TS page (Attachment 3 of the July 1, 2013 Reference 5 letter), nor did it match the corresponding discussion and illustration included on Pages 23 and 24, respectively, of Attachment 1 of the Reference 5 letter. This was corrected in the Reference 6 letter.
(T + 1 year, 3 months)
The TSTF (represented by Excel Services Corporation) was notified August 28, 2013 by the NRC may no longer support TSTF-471. (T + 1 year, 4 months)
ANO notified the NRC that a possible solution to any concerns which ANO could promptly support may be to replace the core alterations August 28, 2013 terms with a requirement to cease the movement of fuel. (T + 1 year, 4 months)
NRC issues formal letter to TSTF stating concerns and requesting November 7, 2013 response (ML13246A358). (T + 1 year, 7 months)
Attachment to 2CAN041401 Page 2 of 3 Date Subject ANO completes industry email survey to verify that fuel assembly loading errors have not historically been identified by source range detectors (loading errors are detected by core mapping or during low November 22, 2013 power physics testing). Although a majority of plants did not respond, those responding indicated loading errors have not been known to be identified via use of source range detectors. (T + 1 year, 7 months)
Call between Excel, TSTF, NRC TS Branch, Palo Verde, and ANO.
December 11, 2013 TSTF plans to present a draft response during the upcoming January NRC/TSTF meeting. (T + 1 year, 8 months)
Excel notified by NRC that NRC plans on rejecting the ANO and Palo Verde submittals, because the letters specifically request adoption of December 19, 2013 the subject TSTFs by name, which the NRC no longer fully supports, until issues resolved. (T + 1 year, 8 months)
Draft response to generic NRC concerns with the subject TSTFs (sent January 8, 2014 by Excel) discussed in TSTF/NRC meeting held in Rockville, MD.
(T + 1 year, 9 months)
ANO call with NRC TS Branch (including the ANO - NRR Plant Licensing Branch IV-1 Chief) and other branch reviewers that have potential concerns with one or more of the subject TSTFs. Following discussion, all agreed that ANO may be able to resolve issue on plant February 3, 2014 specific bases by specifically identifying and addressing NRC concerns in any future supplement. NRC took action to review ANO submittals in detail (the ANO submittals already contained supporting detail well above that supporting the original TSTFs) and determine if more information would be required. (T + 1 year, 10 months)
ANO notified by NRR PM that not all reviewers had determined whether additional questions would be warranted and, therefore, there February 25, 2014 may not be sufficient time to proceed prior to the amendment request reaching 2 years of age. (T + 1 year, 10 months)
NRC provided via email draft questions. ANO provided informal response via email with significant detail and content the same day as February 27, 2014 a means of verifying that the questions were clearly understood by the licensee. No response was received. (T + 1 year, 10 months)
Attachment to 2CAN041401 Page 3 of 3
REFERENCES:
- 1. Entergy letter dated April 4, 2012, License Amendment Request - Technical Specification (TS) Change Related to Revised Fuel Assembly Drop Analysis and Adoption of TSTF-51, TSTF-272, TSTF-286, and TSTF-471 (2CAN041201) (ML12096A022) (TAC No. ME8348)
- 2. NRC email dated May 10, 2012, Proposed License Amendment Request to Technical Specification (TS) Change Related to Revised Fuel Assembly Drop Analysis and Adoption of TSTF-51, TSTF-272, TSTF-286, and TSTF-471 (ML121310562)
- 3. Entergy letter dated July 9, 2012, License Amendment Request - Supplemental - Technical Specification (TS) Change Related to Revised Fuel Assembly Drop Analysis and Adoption of TSTF-51, TSTF-272, TSTF-286, and TSTF-471 (2CAN071201) (ML12192A089)
- 4. NRC email dated June 12, 2013, Request for Additional Information - Proposed License Amendment Request to Technical Specification (TS) Change Related to Revised Fuel Assembly Drop Analysis and Adoption of TSTF-51, TSTF-272, TSTF-286, and TSTF-471 (ML13164A031)
- 5. Entergy letter dated June 18, 2013, License Amendment Request - Supplemental -
Technical Specification (TS) Change Related to Revised Fuel Assembly Drop Analysis and Adoption of TSTF-51, TSTF-272, TSTF-286, and TSTF-471 (2CAN061302)
(ML13170A197)
- 6. Entergy letter dated July 1, 2013, License Amendment Request - Supplemental - Technical Specification (TS) Change Related to Revised Fuel Assembly Drop Analysis and Adoption of TSTF-51, TSTF-272, TSTF-286, and TSTF-471 (2CAN071301) (ML13183A124)