Finding | |
---|---|
Title | Inadequate Corrective Actions from an Inadequate Extent of Condition Review |
Description | The inspectors identified a noncited violation of 10 CFR Part 50, Appendix B, Criteria XVI, Corrective Action, for the failure to assure that conditions adverse to quality were promptly identified and corrected. Specifically, the licensee did not promptly identify and correct improperly installed temperature switches. On October 28, 2010, the Unit 2 essential cooling water vent fan 21A failed because the control power fuse blew due to an unused uninsulated wire. The root cause investigation determined that the unused wire had been installed when the switch was replaced in February 2005. The extent of condition review identified that a total of 60 switches had been replaced, but only one additional switch was verified and it also had an unused uninsulated wire. After inspector questioning, the licensee inspected the 12 actuation switches and determined that only the Unit 2 essential cooling water vent fans for trains A and C were affected. The licensee's corrective actions included: performing an immediate and prompt operability, performing training with the maintenance personnel on the procedural requirements for unused wires, and scheduling the inspection of the 48 high/high temperature switches commensurate with risk significance. The inspectors identified a noncited violation of 10 CFR Part 50, Appendix B, Criteria XVI, Corrective Action, for the failure to assure that conditions adverse to quality were promptly identified and corrected. Specifically, the licensee did not promptly identify and correct improperly installed temperature switches. On October 28, 2010, the Unit 2 essential cooling water vent fan 21A failed because the control power fuse blew due to an unused uninsulated wire. The root cause investigation determined that the unused wire had been installed when the switch was replaced in February 2005. The extent of condition review identified that a total of 60 switches had been replaced, but only one additional switch was verified and it also had an unused uninsulated wire. After inspector questioning, the licensee inspected the 12 actuation switches and determined that only the Unit 2 essential cooling water vent fans for trains A and C were affected. The licensee's corrective actions included: performing an immediate and prompt operability, performing training with the maintenance personnel on the procedural requirements for unused wires, and scheduling the inspection of the 48 high/high temperature switches commensurate with risk significance. |
Site: | South Texas ![]() |
---|---|
Report | IR 05000498/2011004 Section 1R15 |
Date counted | Sep 30, 2011 (2011Q3) |
Type: | NCV: Green |
cornerstone | Mitigating Systems |
Identified by: | NRC identified |
Inspection Procedure: | IP 71111.15 |
Inspectors (proximate) | J Dixon G Guerra B Tharakan W Walker M Young D Proulx M Chambers S Makor S Hedger J Watkins J Dykert |
CCA | H.14, Conservative Bias |
INPO aspect | DM.2 |
' | |
Finding - South Texas - IR 05000498/2011004 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Finding List (South Texas) @ 2011Q3