| Q | CCA | Title |
---|
05000482/FIN-2016001-01 | 2016Q1 | H.1 | Failure to Adequately Establish and Adjust Preventive Maintenance Activities for Control Room Air Conditioning Unit SGK04A Sensing lines and Fittings |
05000482/FIN-2016002-01 | 2016Q2 | H.3 | Failure to Adequately Establish Control Room Air Conditioning System Testing Flow Rate Acceptance Criteria |
05000482/FIN-2016407-01 | 2016Q2 | | Security |
05000482/FIN-2016007-02 | 2016Q2 | | Failure to Verify the Adequacy of Design of the Control Circuitry of the Fuel Oil Transfer Pumps |
05000482/FIN-2016007-01 | 2016Q2 | | Inadequate Degraded Voltage Analyses of Class 1E Systems |
05000482/FIN-2016007-04 | 2016Q2 | H.9 | Failure to Promptly Correct Deficiencies With Operator Time Critical Actions |
05000482/FIN-2016008-02 | 2016Q2 | H.14 | Failure to Promptly Identify and Correct a Condition Adverse to Quality Associated with the Emergency Diesel Generator B Excitation System Diodes |
05000482/FIN-2016007-03 | 2016Q2 | P.5 | Inadequate Analysis of Essential Service Water Piping |
05000482/FIN-2016009-01 | 2016Q2 | P.2 | Failure to Evaluate and Address Failures of Prior Corrective Actions to Prevent Repeat Events |
05000482/FIN-2016009-02 | 2016Q2 | P.4 | Failure to Identify and Correct Negative Trend in Breach Permit Corrective Actions |
05000482/FIN-2016008-01 | 2016Q2 | P.5 | Failure to Adequately Establish and Adjust Preventive Maintenance for Emergency Diesel Generator Excitation System Diodes |
05000482/FIN-2016408-04 | 2016Q3 | | Security |
05000482/FIN-2016004-01 | 2016Q4 | P.5 | Failure to Adequately Establish and Adjust Preventive Maintenance for Emergency Diesel Generator Excitation System Diodes |
05000482/FIN-2016411-02 | 2016Q4 | | Security |
05000482/FIN-2016410-02 | 2016Q4 | | Security |
05000482/FIN-2016410-01 | 2016Q4 | H.9 | Security |
05000482/FIN-2016411-01 | 2016Q4 | H.7 | Security |