Title | Failure to Station Boundary Watch for Opening Auxiliary Building Emergency Exhaust System Boundary Door |
Description | The inspectors identified a non-cited violation of 10 CFR 50, Appendix B, Criterion V, Instructions, Procedures, Drawings, associated with the licensees failure to follow the requirements of Station Procedure AP 10-104, Breach Authorization, Revision 32. Specifically, the licensees failure initiate a breach permit and station a boundary watch when the auxiliary building emergency exhaust system boundary door 41015 was opened multiple times for transporting scaffolding from the turbine building to the auxiliary building. Opening this door without compensatory measures rendered the auxiliary building emergency exhaust system inoperable. The license entered this issue into their corrective action program for resolution as Condition Reports 92315 and 92630. The licensees failure to initiate a breach permit and implement required compensatory measures for when the auxiliary building emergency exhaust system boundary door 41015 was open was a performance deficiency. The performance deficiency was determined to be more than minor because it was associated with the system, structure, and component and barrier performance attribute of the Barrier Integrity Cornerstone, and affected the associated cornerstone objective to ensure the radiological barrier functionality of the auxiliary building emergency exhaust system. Specifically, without a dedicated individual in constant communication with the control room, as required by AP 10-104, opening this door required entry of Technical Specification 3.7.13 Limited Condition of Operation Condition B. The longest period door 41015 was open was approximately one hour without the required compensatory measure. Using Inspection Manual Chapter 0609, Appendix A, The Significance Determination Process (SDP) for Finding At-Power, dated June 19, 2012, inspectors determined that the finding screened as having very low safety significance (Green) because the finding only involved a degradation of the radiological barrier function provided for the auxiliary building. The finding has a cross-cutting aspect in the area of human performance associated with work management. Specifically, the organization failed to implement a process of planning, controlling, and executing work activities such that nuclear safety is the overriding priority, including the identification and management of risk commensurate to the work [H.5]. |
Site: | Wolf Creek ![]() |
---|---|
Report | IR 05000482/2015001 Section 1R15 |
Date counted | Mar 31, 2015 (2015Q1) |
Type: | NCV: Green |
cornerstone | Barrier Integrity |
Identified by: | NRC identified |
Inspection Procedure: | IP 71111.15 |
Inspectors (proximate) | A Rosebrook C Henderson D Dodson F Thomas G Guerra J Drake J O'Donnell L Carson R Stroble |
Violation of: | 10 CFR 50 Appendix B Criterion V Technical Specification Technical Specification - Procedures |
CCA | H.5, Work Management |
INPO aspect | WP.1 |
' | |