05000458/FIN-2017003-01 | 2017Q3 | H.6 | Failure to Account for Delayed Closure of Isolation Valves in the Ultimate Heat Sink Inventory Analysis |
05000458/FIN-2017003-02 | 2017Q3 | H.5 | Manual Reactor Scram Initiated in Response to Increase in Steam Pressure during Steam Leak Troubleshooting |
05000458/FIN-2018001-01 | 2018Q1 | | Failure to Implement Procedure for Storage of Material in the Pools |
05000458/FIN-2018001-02 | 2018Q1 | | Installation of an Incorrectly Specified Relay Causes Plant Transient and Reactor Scram |
05000458/FIN-2018012-07 | 2018Q2 | | Failure to Perform 10 CFR 50.59 Evaluation for Main Feedwater System Sparger Nozzle Damage |
05000458/FIN-2018012-02 | 2018Q2 | | Failure to Identify and Correct a Broken Feedwater Chemistry Probe |
05000458/FIN-2018012-06 | 2018Q2 | | Failure to Provide Adequate Procedures for Post-Scram Recovery |
05000458/FIN-2018012-05 | 2018Q2 | H.9 | Failure to Develop an Adequate Operational Decision-Making Issue for Compensatory Measures Related to a Degraded Condition of the Feedwater System Sparger Nozzles |
05000458/FIN-2018012-03 | 2018Q2 | P.3 | Failure to Establish Procedural Guidance for Determining Core Flow During Unanticipated Single Loop Operations |
05000458/FIN-2018012-01 | 2018Q2 | | Failure to Conduct Adequate Transient Snap Shot Assessment Following Recirculation Pump Trip |
05000458/FIN-2018012-04 | 2018Q2 | | Failure to Submit a Licensee Event Report for a Manual Scram |
05000458/FIN-2018002-01 | 2018Q2 | | Failure to Correct Inadequate Technical Specification Pressure Temperature Curves |
05000458/FIN-2018002-02 | 2018Q2 | | Enforcement Action (EA)-18-053: Enforcement Discretion for Tornado-Generated Missile Protection Noncompliances |
05000458/FIN-2018406-01 | 2018Q2 | | Security |
05000458/FIN-2018406-02 | 2018Q2 | | Security |