Finding | |
|---|---|
| Title | |
| Description | Inspectors identified a finding of very low safety significance when the licensee impaired a flood protection boundary that supported a required safety function for operational convenience. Specifically, the licensee removed the flood barriers for auxiliary feedwater system containment isolation valves and rendered the valves inoperable prior to the plant reaching Mode 5 and thereby entered TS 3.6.3 Condition
for operational convenience contrary to the TS Bases associated with TS 3.0.2 Limiting Condition for Operability (LCO) Applicability. From 2010 on September 28, 2014, until 0536 on September 29, 2014, while transitioning from Mode 1 to Mode 5, the valves were rendered inoperable. This issue has been entered in the CAP as IR 2390265. Corrective actions included Senior Reactor Operator review of the LCO basis and creating a logic tie in the outage schedule template tying the barrier removal to Mode 5 The finding was more than minor because it impacted the SSC and Barrier Performance attribute of the Barrier Integrity Cornerstone, and adversely affected the cornerstone objective to provide reasonable assurance that the physical design barrier of the containment system protects the public from radionuclide releases caused by accidents or events. Specifically, with inoperable containment isolation valves the potential for an open containment pathway is increased. The inspectors determined the finding could be evaluated using the SDP in accordance with IMC 0609, Appendix A, The Significance Determination Process For Findings At-Power, Exhibit 3Barrier Integrity Screening Questions, item B for the Reactor Containment. Both questions were answered "No" and therefore the finding screened as Green. The finding had an associated cross-cutting aspect of Work Management in the area of Human Performance (MC 0310 H.5) because the shutdown and outage work schedules did not contain the rigo required to ensure the isolation valves were maintained operable as required by TS. |
| Site: | Byron |
|---|---|
| Report | IR 05000455/2014005 Section 1R20 |
| Date counted | Dec 31, 2014 (2014Q4) |
| Type: | Finding: Green |
| cornerstone | Barrier Integrity |
| Identified by: | NRC identified |
| Inspection Procedure: | IP 71111.2 |
| Inspectors (proximate) | C Thompson J Cassidy J Draper J Ellegood J Mcghee M Bielby M Holmberg R Baker R Jickling T Bilik |
| CCA | H.5, Work Management |
| INPO aspect | WP.1 |
| ' | |
Finding - Byron - IR 05000455/2014005 | |||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Finding List (Byron) @ 2014Q4