05000454/LER-2012-003, Regarding Containment Area Radiation Monitors Inoperable for Longer than Allowed by Technical Specifications Due to Inadequate Procedure Controls

From kanterella
(Redirected from 05000454/LER-2012-003)
Jump to navigation Jump to search
Regarding Containment Area Radiation Monitors Inoperable for Longer than Allowed by Technical Specifications Due to Inadequate Procedure Controls
ML12216A390
Person / Time
Site: Byron  
Issue date: 08/03/2012
From: Tulon T
Exelon Generation Co, Exelon Nuclear
To:
Office of Nuclear Reactor Regulation, Document Control Desk
References
2012-0086 LER 12-003-00
Download: ML12216A390 (5)


LER-2012-003, Regarding Containment Area Radiation Monitors Inoperable for Longer than Allowed by Technical Specifications Due to Inadequate Procedure Controls
Event date:
Report date:
Reporting criterion: 10 CFR 50.73(a)(2)(i)(8)
4542012003R00 - NRC Website

text

Exelon GeneratIon Company.llC Byron StatIOn 4450 North German Church Road Byron. IL 61010 9794 August3,2012 Byron Ltr 2012 - 0086 File:

1.10.0101 wwwexeloncorp com U. S. Nuclear Regulatory Commission A TIN: Document Control Desk Washington, DC 20555-0001 Byron Station, Unit 1 and Unit 2 Facility Operating Ucense Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455 Exelon.

Nuclear 10 CFR 50.73

Subject:

Ucensee Event Report 2012-003-00, AContainment Area Radiation Monitors Inoperable for Longer than Allowed by Technical Specifications Due to Inadequate Procedure Controls" The enclosed Licensee Event Report (LER) is being submitted in accordance with 10 CFR 50.73,

~Licensee event report system." The LER involves a June 4, 2012, discovered condition involving inadequate procedural controls for installing setpoints on required Technical Specifications containment art:Ja radiation monitors.

There are no regulatory commitments contained in this letter. Should you have any questions concerning this submittal, please contact Mr. David Gudger, Regulatory Assurance Manager, at (815) 406-2800.

Respectfully,

~v, ~~\\,~\\u\\:n TimXI>~

Site Vice President Byron Station TJT/JEWcy

Enclosure:

LER Number 454-2012-003-00

INAC FORM 388 U.s. NUCLEAR REGULATORY COIIIIISSION

~ '._,_..i BY UMIS: NU. 31:1O-0104 EXPIRES: 1013112013 (1 ()'201 0)

E8IIma18d burden per response 10 comply with 1tIIs mandatory c:oUec:tIon request: 80 hour8. Reported lessons learned are Incorporat8d Into the licensing process and fed back 10 =Send cornment8 regardlng burden esIlmate 10 the FO~Sec:tion -6 F53). U.S. Nud8ar Regulatory CommissIon. WashIIIgton.

1. or by Intemel 4H1\\8II 10 UCENSEE EVENT REPORT (LER) lnfocoIIec:tB.resoun:e@fIrC.g:. and 10 the Desk 0fIIcej. 0IIIce of Informallon and ~. HE 10202. (3150-0104). 0IDce of MaI~

(See reverse for required number of Budget, W

  • DC 20503. " a means used 10 Impose an coIIedIon does not display 8 currently valid OMS control number. !tie NRC may digits/characters for each block) not conducI or sponsor. and 8 paraon is not required 10 respond 10. !tie InfonnaIIon coIJedk)n.

~. FACIUlY NAIIE

2. DOCKET NUMBER
13. PAGE Byron Station, Unit 1 05000454 1 OF 4
14. TITLE Containment Area Radiation Monitors Inoperable for Longer than Allowed by Technical Specifications Due to Inadequate Procedure Controls
5. EVENT DATE
6. LER NUMBER
7. REPORT DATE
8. OTHER FAClunES INVOLVED YEAR I seauENTIAL I REV FACIUTY NAME DOCKET NUMBER MONTH DAY YEAR NUMBER NO.

MONTH DAY YEAR Byron Station, Unit 2 05000455 FACIUTY NAME DOCKET NUMBER 06 04 2012 2012 - 003 -

00 08 03 2012

~. OPERAnNG MODE

11. THIS REPORT IS SUBMITTED PURSUANT TO THE REQUIREMENTS OF 10 CFR t: (Ch8ck 811 that apply) 1 o 20.2201 (b) o 2O.2203(a)(3)(I) o SO.73(a)(2)(I)(C) o SO.73(a)(2)(vII) o 20.2201 (d) o 2O.2203(a)(3)(II) o SO.73(a)(2)(II)(A) o SO.73(a)(2)(vtU)(A) o 2O.2203(a)(1) o 2O.2203(a)(4) o SO.73(a)(2)(lI)(8) o SO.73(a)(2)(vlH)(8) o 2O.2203(a)(2)(I) o SO.36(c)(1 )(I)(A) o SO.73(a)(2)(II1) o SO.73(a)(2)(bc)(A)

~O. POWER LEVEL o 20.2203(8)(2)(11) o SO.36(C)(1 )(II)(A) o SO.73(a)(2)(Iv)(A) o SO.73(a)(2)(x) o 2O,2203(a)(2)(l0) o SO.36(c)(2) o SO.73(a)(2)(v)(A) o 73.71(a)(4) 100 o 2O.2203(a)(2)(Iv) o SO.46(a)(3)(II) o SO.73(a)(2)(v)(8) o 73.71 (a)(5) o 2O.2203(a)(2)(v) o SO.73(a)(2)(I)(A) o SO.73(a)(2)(v)(C) o OTHER o 2O.2203(a)(2)(vI)

!m SO.73(a)(2)(I)(8) o SO.73(a)(2)M(O)

Specify In Abstract below or In =

=

Background===

YEAR

6. LER NU.. BER I

SEQUENTIAl I REV NUMBER NO.

2012 003 00

3. PAGE 2

OF 4

The Containment Purge (Va) [VA] penetration line contains automatic inside and outside containment isolation valves and is normally isolated. This va line is occasionally opened to maintain containment pressure within limits.

When the va containment isolation valves are opened, an automatic va isolation would occur upon a safety injection signal, general containment isolation signals or from high radiation inside containment signals. The high radiation signals are generated from two Area Radiation (AR) [IL] monitoring channels located within containment (i.e., 1/2AR011J and 1/2AR012J). In accordance with Technical Specifications (TS) 3.3.6, *Containment Ventilation Isolation Instrumentation,* the setpoints for the monitors are required to be set less than or equal to 10 mR/hr above the background radiation level in containment. To avoid spurious va isolation actuations from radiation spikes, the setpoint is set close to the 10 mR/hr limit.

With the setpoints on both monitors greater than 10 mR/hr above the background radiation level, both the radiation monitor channels are considered inoperable. TS 3.3.6 Condition B requires immediate entry into Condition B of TS 3.6.3, *Containment Isolation Valves,* for inoperable va containment isolation valves.

Condition B requires the va purge penetration to be isolated by a closed and de-activated automatic or remote manual valve within one hour. If this required action and completion time is not met then Condition E requires the Unit to be in Mode 3 in six hours and Mode 5 in 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />.

A. Plant Operating Conditions Before the Event

Unit 1 was in Mode 1 -

Power Operations at approximately 100% power.

Reactor Coolant System (RC) [AB]: Normal operating temperature and pressure. No structures, systems, or components were inoperable at the start of this event that contributed to the event.

Unit 2 was in Mode 1 -

Power Operations at approximately 100% power.

Reactor Coolant System: Normal operating temperature and pressure. No structures, systems, or components were inoperable at the start of this event that contributed to the event.

NRC FORM 386A (1()'2010)

NRC FORM 386A (10-2010)

1. FACIUTY NAME Byron Station, Unit 1 NARRATIVE

B. Description of Event

UCENSEE EVENT REPORT (LER) u.s. NUCLEAR REGULATORY COMMISSION CONTINUATION SHEET

2. DOCKET
8. LEA NUMBER
3. PAGE OF 4

YEAR I seauENTIAL I REV NUMBER NO.

05000454 3

2012 003 00 Prior to May 2011, the procedural controls for installing the setpoints for the 1/2AR011 J and 1/2AR012J monitoring channels did not account for the lowering background radiation levels that occurs while reactor power is being reduced. Consequently, during a power reduction, with the setpoint constant and near its limit and background levels reducing, the TS setpoint limit of being less than or equal to 10 mR/hr above background would be exceeded. Once Mode 5 was reached the setpoints were adjusted to shutdown background levels. In addition, when retuming to power from an outage, the setpoints for full power operations were installed while in Mode 5 based on anticipated full power background levels.

Consequently, until full power background radiation level was reached the setpoint was greater than 10 mR/hr above background radiation level. Therefore, the 1/2AR011J and 1/2AR012J were inoperable during the startup and power ascension which typically takes several days.

On May 24, 2011, the flawed procedural setpoint practice was recognized while shutdown for a maintenance outage for Unit 2. The condition was entered into the corrective action program (CAP) and reviewed for reportability as a condition prohibited by TS. The reportability review focused on the Unit shutdown and a determination was made that a condition prohibited by TS did not occur because Unit 2 was in a Mode of non-applicability (i.e., Mode 5) before any TS required actions and associated completion times were exceeded. However, at the time, a historical reportability review of other potential occurrences of being in condition prohibited by TS was not conducted.

On June 4, 2012, Byron Station was notified by Braidwood Station of a similar condition occurring at their site for which they concluded was a condition reportable to the NRC. Byron Station reconsidered the May 24, 2011 condition for potential reportability and concluded that for the Unit refueling shutdowns, prior to May 2011; TS 3.6.3 Required Actions Completion Times were likely not exceeded.

This is because TS 3.6.3 would require the Unit to be in Mode 3 in six hours and Mode 5 in 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />.

Unit refueling shutdowns nominally would be in Mode 3 within six hours and Mode 5 with 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />.

However, for power reductions that did not go to Mode 3 and Unit startups, TS 3.6.3 Required Actions Completion Times were likely exceeded. For example, the startup and power ascension following the Unit 1 spring 2011 refueling outage had a duration of over 7 days. TS would have required Unit 1 be placed in Mode 5 within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> once Mode 4 was entered with 1 AR011 J and 1 AR012J inoperable.

Therefore, this condition is reportable to the NRC in accordance with 10 CFR 50.73 (a)(2)(i)(8) as an operation or condition prohibited by the plant's TS.

C. CauseJs of the Event Prior to May 2011, inadequate procedural controls existed to ensure compliance with the TS setpoint requirements for 1/2AR011J and 1/2AR012J radiation monitors.

Contributing causes include a lack of a periodic operational surveillance that verifies the 1/2AR011J and 1/2AR012J setpoints are set correctly, also a lack of adequate training to Operators conceming the relationship of containment radiation background level changes and its impact on the 1/2AR011 J and 1/2AR012J radiation monitors setpoints.

NRC FORM 38M (10-2010)

NRC FORM 3MA (1 ()'201 0)

1. FACIUTY NAIIE Byron Station, Unit 1 NARRATIVE D. Safety Sianificance UCENSEE EVENT REPORT (LER) u.s. NUCLEAR REGULATORY COMMISSION CONTINUAnON SHEET
2. DOCKET 05000454 YEAR e. LER NUMBER I

SEQUENTIAl I REV NUMBER NO.

2012 003 00

3. PAGE 4

OF 4

The safety consequences to this event were minimal. The automatic isolation signal from the 1/2AR011J and 1/2AR012J would have occurred but been delayed until the higher setpoint was reached. Even though the setpoints were higher than prescribed by TS, va isolation would have occurred prior to offsite dose limits, as defined in the Offsite Dose Calculation Manual, being challenged.

In addition, for containment releases a Process Radiation (PR) [IL] monitor (i.e.,1/2 PR001) monitors the release flow path and its alarm setpoint is set conservatively based on actual containment atmosphere grab samples to alert Operators of possible changing conditions within containment The alarm response directs Operators to isolate the containment release. In addition, the 1/2PR011 monitors directly monitor the radioactivity in the containment and also alerts the Operators to possible changing conditions within containment.

The automatic va isolation from a safety injection and general containment isolation signals were unaffected. The effects on fuel handling events in Mode 6 would be negligible since the setpoint changes were adjusted to within 10 mR/hr in Mode 5 prior to fuel moves and re-adjusted after completion of fuel moves in preparation for retuming to power. Since the safety function of isolating a containment release prior to exceeding offsite dose limits could still be achieved, then this is not considered a safety system functional failure.

E. Corrective Actions

Procedural controls and were added to ensure 1/2AR011J and 1/2AR012J setpoints are adjusted as necessary to ensure compliance with TS during changing containment background radiation conditions.

Training will be provided to licensed operators on the operability impact of a deviation of background radiation levels and the 1/2AR011J and 1/2AR012J setpoints.

In addition to correcting the radiation monitor setpoint issues, the circumstances surrounding the CAP inadequate historical reportability review of the May 24, 2011 event will be evaluated to determine if any appropriate improvement actions are warranted.

F.

Previous Occurrences

No similar previous events were identified at Byron Station in the previous three years.