05000443/FIN-2018411-01
Jump to navigation
Jump to search
Site: | Seabrook |
---|---|
Report | IR 05000443/2018411 Section 3S01 |
Date counted | Jun 30, 2018 (2018Q2) |
Type: | NCV: Green |
cornerstone | Physical Protection |
Identified by: | NRC identified |
Inspection Procedure: | IP 71130.01 |
Violation of: | 10 CFR 73, PHYSICAL PROTECTION OF PLANTS AND MATERIALS |
CCA | H.8, Procedure Adherence |
INPO aspect | WP.4 |
' | |