05000443/FIN-2018001-01
Jump to navigation
Jump to search
Site: | Seabrook |
---|---|
Report | IR 05000443/2018001 Section 4OA7 |
Date counted | Mar 31, 2018 (2018Q1) |
Type: | NCV: Green |
cornerstone | Mitigating Systems |
Identified by: | Licensee-identified |
Inspection Procedure: | |
Inspectors (proximate) | P Cataldo P Meier D Beacon J Furia N Floyd F Bower |
Violation of: | 10 CFR 50 Appendix B 10 CFR 50 Appendix B Criterion III, Design Control |
INPO aspect | |
' | |