| Q | CCA | Title |
---|
05000440/FIN-2015001-02 | 2015Q1 | | Liquid Penetrant Testing Procedure Was Not Qualified for Its Full Applicability Range |
05000440/FIN-2015001-01 | 2015Q1 | H.5 | Failure to Initiate A Transient Combustible Permit |
05000440/FIN-2015003-01 | 2015Q3 | H.6 | Inadequate Operating Procedure for Diesel Generator Building Ventilation System |
05000440/FIN-2015007-01 | 2015Q3 | | ASME Code Pressure Tests of Reactor Vessel Flange Seal Leak-Off Line Were Not Performed |
05000440/FIN-2015003-02 | 2015Q3 | H.12 | Failure to Properly Implement Steps Outlined in a Technical Specification Surveillance Proce |
05000440/FIN-2015007-02 | 2015Q3 | H.12 | Failure to Adequately Evaluate Damaged CRD Flange |
05000440/FIN-2015403-03 | 2015Q4 | | Security |
05000440/FIN-2015403-04 | 2015Q4 | | Security |
05000440/FIN-2015403-02 | 2015Q4 | | Security |
05000440/FIN-2015403-01 | 2015Q4 | | Security |
05000440/FIN-2015008-04 | 2015Q4 | H.7 | Failure to Perform Fire Watches |
05000440/FIN-2015008-01 | 2015Q4 | | Failure to Ensure that Systems, Structures, and Components Necessary to Achieve and Maintain Hot Shutdown Conditions were Free of Fire Damage without Repair Actions |
05000440/FIN-2015008-02 | 2015Q4 | H.5 | Failure to Inspect Penetration Seals Within the Required Time Frequency |
05000440/FIN-2015008-03 | 2015Q4 | | Failure to Provide Adequate Guidance to Override Spurious CO2 Initiation Signal in the Diesel Generator Rooms |
05000440/FIN-2015004-01 | 2015Q4 | | Failure to Ensure Required 3 Hour Fire Barriers (gypsum board walls) Were In-Place |
05000440/FIN-2015004-03 | 2015Q4 | P.3 | Failure to Properly Implement System Operating Instructions to Restore RHR B to Service |
05000440/FIN-2015010-01 | 2015Q4 | H.3 | Unqualified Radiation Protection Manager |
05000440/FIN-2015004-02 | 2015Q4 | | Liquid Effluent Calibration |