Title | Failure to Establish an Appropriate Preventative Maintenance Procedure for the HPCS Jockey Pump |
Description | Green . The inspectors reviewed a self -revealed, non- cited violation of Technical Specification 5.4.1.a, for the licensees failure to establish appropriate procedural instructions for performing preventative maintenance on the high pressure core spray jockey pump. Specifically, on January 27, 2017, the high pressure core spray jockey pump failed because the licensee did not establish a preventative maintenance procedure that prescribes oil analysis and additional performance trending for the high pressure core spray jockey pump every 6 months consistent with the licensees preventative maintenance strategy template. On January 29, 2017, the licensee completed repairs and returned the high pressure core spray jockey pump and high pressure core spray system to operable status . The licensee has also incorporated oil analysis and performance trending into the preventative maintenance for jockey pumps. This issue has been entered into the licensees corrective action program as Condition Report CR -GGN -2017- 0917. The failure to establish appropriate preventative maintenance instructions for the high pressure core spray jockey pump was a performance deficiency. The performance deficiency was more than minor, and therefore a finding, because it was associated with the equipment performance attribute of the Mitigating Systems Cornerstone and adversely affected the cornerstone objective to ensure the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. Specifically, the failure to establish appropriate preventative and predictive maintenance work instructions resulted in the unplanned inoperability and unavailability of the high pressure core spray system. Using Inspection Manual Chapter 0609, Appendix A, The Significance Determination Process (SDP) for Findings At -Power, dated June 19, 2012, and Inspection Manual Chapter 0609, Appendix A, Exhibit 2, Mitigating Systems Screening Questions, the inspectors determined that the finding resulted in a loss of system and/or function; therefore, a detailed risk evaluation was performed. A senior reactor analyst performed a detailed risk evaluation in accordance with Inspection Manual Chapter 0609, Appendix A, The Significance Determination Process (SDP) for Findings at Power. The NRC determined that the increase in core damage frequency for internal initiators was 1.59 E-7/year, and a bounding analysis of external initiators indicated that these events would not result in a 3 change in the color of the finding. Therefore, this finding is of very low safety significance (Green). The analyst also determined that an estimation of large early release frequency (LERF) was required. The result was an increase in LERF of 3.19E -8/year, which is of very low safety significance for LERF (Green). This finding had a cross -cutting aspect in the area of human performance associated with consistent process because the licensee did not use a consistent, systematic approach to make decisions. Specifically, the licensee did not use a consistent approach in developing a preventative maintenance strategy for the high pressure core spray jockey pump by utilizing the approved preventative maintenance strategy template [H.13]. |
Site: | Grand Gulf |
---|---|
Report | IR 05000416/2017002 Section 4OA3 |
Date counted | Jun 30, 2017 (2017Q2) |
Type: | NCV: Green |
cornerstone | Mitigating Systems |
Identified by: | Self-revealing |
Inspection Procedure: | IP 71153 |
Inspectors (proximate) | M Young S Graves G Pick P Elkmann N Day M Stafford E Schrader S Hedger |
Violation of: | Technical Specification - Procedures |
CCA | H.13, Consistent Process |
INPO aspect | DM.1 |
' | |
Finding - Grand Gulf - IR 05000416/2017002 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|