05000397/FIN-2010005-04
From kanterella
Jump to navigation
Jump to search
Finding | |
---|---|
Title | Failure to Perform Engineering Evaluation to Determine Seismic Qualification of Safety-related Equipment |
Description | The inspectors identified a noncited violation of 10 CFR Part 50, Appendix B, Criterion V, Instructions, Procedures, and Drawings, for the failure to follow Procedure PPM 10.2.53, Seismic Requirements for Scaffolding, Ladders, Man-Lifts, Tool Gang Boxes, Hoists, Metal Storage Cabinets, and Temporary Shielding Racks, Revision 26. Specifically, the position of equipment was required to meet specific criteria to prevent damage to safety-related equipment during a seismic event. Contrary to this procedure, the inspectors identified that equipment was positioned adjacent to safety-related equipment without a supporting engineering evaluation. The inspectors notified the main control room personnel, who directed an equipment operator to immediately position the 55 gallon drum away from the standby liquid control system. This issue has been placed in the licensees corrective action program as Action Request/Condition Report 230872. This finding was more than minor because it was a human performance error which affected the Mitigating Systems Cornerstone objective to ensure the availability and reliability of systems that respond to initiating events to prevent undesirable consequences. The finding was determined to be of very low safety significance because it was not a design or qualification deficiency; it did not result in the loss of a system safety function; it did not represent the loss of a single train for greater than technical specification allowed outage time; it did not represent a loss of one or more non-technical specification risk-significant equipment for greater than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />; and it did not screen as potentially risk significant due to seismic, flooding, or severe weather. A cross-cutting aspect in the human performance area with a work control component was identified in that Energy Northwest failed to appropriately plan work, resulting in job site conditions which may have impacted plant components H.3.a]. |
Site: | Columbia |
---|---|
Report | IR 05000397/2010005 Section 4OA2 |
Date counted | Dec 31, 2010 (2010Q4) |
Type: | NCV: Green |
cornerstone | Mitigating Systems |
Identified by: | NRC identified |
Inspection Procedure: | IP 71152 |
Inspectors (proximate) | R Cohen W Walker M Hayes |
CCA | H.5, Work Management |
INPO aspect | WP.1 |
' | |
Finding - Columbia - IR 05000397/2010005 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Finding List (Columbia) @ 2010Q4
Self-Identified List (Columbia)
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||