| | Q | CCA | Title |
|---|
| 05000353/FIN-2011004-01 | 2011Q3 | H.6 | Failure of Feedwater MOV Resulting in RCIC Inoperability for Longer than Allowed by Technical Specifications |
| 05000352/FIN-2011503-01 | 2011Q3 | | (Traditional Enforcement) Changes to EAL Basis Decreased the Effectiveness of the Plan without Prior NRC Approval |
| 05000352/FIN-2011004-02 | 2011Q3 | H.13 | Failure to Provide Adequate Restoration Instructions for Turbine Control Valve Online Maintenance |
| 05000352/FIN-2011004-03 | 2011Q3 | | Test Equipment Interference Resulting in Reactor Scram |
| 05000352/FIN-2011503-02 | 2011Q3 | | Changes to EAL Basis Decreased the Effectiveness of the Plan without Prior NRC Approval. |
| 05000352/FIN-2011005-01 | 2011Q4 | P.3 | Inadequate Corrective Actions for a Previous NRC Finding for Programmatic Deficiencies in the Preventive Maintenance Program |
| 05000352/FIN-2011007-01 | 2011Q4 | P.2 | Failure to Evaluate Station Blackout Timeline for EDG Availability |
| 05000352/FIN-2012002-01 | 2012Q1 | | Failure to Make a 10 CFR 50.72 (b)(2)(xi) Notification |
| 05000353/FIN-2012008-01 | 2012Q2 | | Failure to Submit an LER Revision for Conditions Prohibited by TS Associated with the HPCI and RCIC Systems |
| 05000352/FIN-2012003-01 | 2012Q2 | P.2 | Failure to Conduct Timely Corrective Actions to Replace Age Degraded Relays |
| 05000352/FIN-2012403-01 | 2012Q2 | H.8 | Security |
| 05000353/FIN-2012008-02 | 2012Q2 | | Violation of TS 3.5.1 and 3.0.3 |