05000352/FIN-2011005-01
From kanterella
Jump to navigation
Jump to search
Finding | |
---|---|
Title | Inadequate Corrective Actions for a Previous NRC Finding for Programmatic Deficiencies in the Preventive Maintenance Program |
Description | The inspectors identified a Green NCV of 10 CFR Part 50, Appendix B, Criterion XVI, Corrective Action, for failure to implement adequate corrective actions for a previous NRC-identified finding. The previous finding involved a failure to perform adequate preventive maintenance (PM) on an emergency diesel generator (EDG) due to site engineers not being fully aware of new PM requirements developed by Exelon corporate. The lack of proper PM led to a failure of an EDG in May 2010. In response to the previous finding, Limerick performed an apparent cause evaluation (ACE) and developed actions to address the causes and extent of condition. However, the inspectors identified that the actions were not properly implemented, and, as a result, the deficiency identified by the inspectors was not fully resolved. Exelon entered the issue in the Corrective Action Program (CAP) for resolution. The inspectors determined that the failure to implement adequate corrective actions for a previous NRC-identified finding was a performance deficiency. The issue is more than minor because, if left uncorrected, it could become a more significant safety concern. Specifically, the issues identified by the inspectors impacted Limerick\'s ability to establish and implement appropriate PM for equipment relied on for safe operation of the plant. Until the issues are fully resolved, Limerick continues to be vulnerable to gaps in their PM program. This issue affects all sites in the Exelon fleet. The finding was determined to be of very low safety significance (Green) using Attachment 4 to IMC 0609, Significance Determination Process, because the incomplete corrective actions did not result in an actual loss of safety function. This finding has a cross-cutting aspect in the area of Problem Identification and Resolution, Corrective Action Program, because Exelon failed to implement appropriate corrective actions for a previous NRC-identified finding in timely manner. |
Site: | Limerick |
---|---|
Report | IR 05000352/2011005 Section 1R19 |
Date counted | Dec 31, 2011 (2011Q4) |
Type: | NCV: Green |
cornerstone | Mitigating Systems |
Identified by: | NRC identified |
Inspection Procedure: | IP 71111.19 |
Inspectors (proximate) | E Dipaolo E Miller J Amberosini J Lilliendahl J Richmond J Tomlinson N Sieller P Krohn S Ibarrola T Moslak |
CCA | P.3, Resolution |
INPO aspect | PI.3 |
' | |
Finding - Limerick - IR 05000352/2011005 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Finding List (Limerick) @ 2011Q4