| Title | Failure to Monitor Reactor Pressure during Reactor Pressure Vessel Hydrostatic Test |
| Description | A self-revealed Green finding and associated NCV of Technical Specification (TS) 5.4.1.a was identified for the licensees failure to establish and implement procedures recommended by Regulatory Guide 1.33, Revision 2, Appendix A, February 1978. Specifically, the licensee failed to control reactor pressure in the band specified in the reactor pressure vessel hydrostatic test procedure. A valid high pressure reactor scram actuation was received after operators failed to recognize that the reactor pressure vessel pressure instrument being monitored became inaccurate. Immediately after the scram, operators stabilized the plant at approximately 600 psig and reset the reactor scram. The licensee entered this issue into their corrective action program as CARD 12-23824. The inspectors evaluated the finding using IMC 0609, Appendix G, Attachment 1, Shutdown Operations Significance Determination Process - Phase 1 Operational Checklists for Both Power Water Reactors (PWRs) and Boiling Water Reactors (BWRs). The inspectors consulted Checklist 8, BWR Cold Shutdown or Refueling Operation; Time to Boil > 2 Hours: RCS Level < 23\' Above Top of Flange. The inspectors determined the finding did not adversely impact any shutdown defense-in-depth or mitigation attributes on the checklist, nor did it meet any of the checklist specific requirements for a Phase 2 or Phase 3 SDP analysis. Consequently, the finding was determined to be of very low safety significance. This finding has a cross-cutting aspect in the area of human performance, work practices component, because the licensee failed to use human error prevention techniques commensurate with the risk of the assigned task, such that activities are performed safely. Specifically, the licensee failed to monitor the specified primary instrumentation for critical plant parameters. |
| Site: | Fermi |
|---|---|
| Report | IR 05000341/2012003 Section 4OA3 |
| Date counted | Jun 30, 2012 (2012Q2) |
| Type: | NCV: Green |
| cornerstone | Initiating Events |
| Identified by: | Self-revealing |
| Inspection Procedure: | IP 71153 |
| Inspectors (proximate) | J Cassidy D Jones R Morris A Wilson R Jones J Cameron P Smagacz T Briley J Steffes S Bell |
| CCA | H.12, Avoid Complacency |
| INPO aspect | QA.4 |
| ' | |