05000341/FIN-2011005-01 | 2011Q4 | P.2 | Failure to Develop Appropriate Corrective Actions for a Maintenance Rule (a)(1) Monitored System. |
05000341/FIN-2011005-02 | 2011Q4 | H.2 | Placing a Fuel Bundle in the Wrong Cell During Fuel Shuffle |
05000341/FIN-2012007-01 | 2012Q1 | H.14 | Inadequate Safety Evaluation for the Online Noble Chemical Metal Process |
05000341/FIN-2012007-02 | 2012Q1 | H.14 | Inadequate Safety Evaluation for the Online Noble Chemical Metal Process |
05000341/FIN-2012007-03 | 2012Q1 | | Failure to Identify EDG\\\'s Neutral Grounding Resistor Exceeded its Design Values |
05000341/FIN-2012003-01 | 2012Q2 | | Control Rod 10-35 Failure to Scram |
05000341/FIN-2012003-02 | 2012Q2 | H.2 | Energizing Bus 65E with Ground Truck Installed and Subsequent Loss of Shutdown Cooling |
05000341/FIN-2012003-03 | 2012Q2 | H.12 | Failure to Monitor Reactor Pressure during Reactor Pressure Vessel Hydrostatic Test |
05000341/FIN-2012403-01 | 2012Q2 | | Security |
05000341/FIN-2012201-01 | 2012Q3 | | Security |
05000341/FIN-2012405-01 | 2012Q3 | H.14 | Security |
05000341/FIN-2012405-02 | 2012Q3 | | Security |