| Q | CCA | Title |
---|
05000341/FIN-2010006-02 | 2010Q2 | H.7 | Inadequate Motor Starting Voltage Calculations |
05000341/FIN-2010006-01 | 2010Q2 | H.7 | Inadequate Calculations for Availability of 120kV System Offsite Power |
05000341/FIN-2010006-03 | 2010Q2 | H.7 | Inadequate Procedures for Controlling Availability of 120kV System Voltage |
05000341/FIN-2010006-05 | 2010Q2 | H.7 | Adequate Calculation for DC Short Circuit Analysis |
05000341/FIN-2010006-06 | 2010Q2 | P.5 P.2(a) | Failure to Adequately Evaluate Industry Operating Experience for Applicability to Fermi 2 |
05000341/FIN-2010006-07 | 2010Q2 | H.7 | Inadequate Calculations for Backfit Modifications |
05000341/FIN-2010006-04 | 2010Q2 | | Failure to include Turbine Building Heating Ventilation and Air Conditioning Fans in the Scope of the Maintenance Rule Program. |
05000341/FIN-2010003-01 | 2010Q2 | P.3 | Failure to Adequately Control Loose Materials near the Switchyard |
05000341/FIN-2010004-01 | 2010Q3 | H.7 | Inadequate procedures to control the plant from the dedicated shutdown panel |
05000341/FIN-2010011-01 | 2010Q3 | | Reactor Building Crane and Reactor Building Crane Support Structure/Superstructure Design Calculation Issue |
05000341/FIN-2010201-01 | 2010Q4 | | Security |
05000341/FIN-2010005-02 | 2010Q4 | | Standby Liquid Control Test Tank Operability |
05000341/FIN-2010005-01 | 2010Q4 | H.14 | Plastic Face Shield Lost in the Reactor Cavity |
05000341/FIN-2010005-03 | 2010Q4 | H.13 | Failure of Condensate Filter Demineralizer D Main Drain Valve |