05000336/LER-1981-041, Forwards LER 81-041/01T-0

From kanterella
Jump to navigation Jump to search
Forwards LER 81-041/01T-0
ML20040B307
Person / Time
Site: Millstone Dominion icon.png
Issue date: 01/08/1982
From: Mroczka E
NORTHEAST NUCLEAR ENERGY CO.
To: Haynes R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20040B308 List:
References
MP-2-5021, NUDOCS 8201250378
Download: ML20040B307 (1)


LER-1981-041, Forwards LER 81-041/01T-0
Event date:
Report date:
3361981041R00 - NRC Website

text

s IMHrl'HI!AST IITII.ITII!S

)

1AH FORD. CONNECTICUT 06101 (203) U6 6911 L

L J

Mr. Ronald C. Ilaynes January 8, 1982 Regional Ac'.ainistrator, Region 1 MP-2-5021 Office of Inspection and Enforcement U. S. fluclear Regulatory Commission

,[\\n[1!d[N 631 Park Avenue v

King of Prussia, Pennsylvania 19406 4

),'

, i Re ference:

Facility Operating License flo. DPR-65

.g'

'c Docket lio. 50-336 iI Reportable Occurrence R0-50-336/81-41/01-T

\\,

p

Dear Mr. llaynes:

y This letter forwards interim Licensee Event Report 81-41/01-T required to be submitted within fourteen days pursuant to Millstone Unit 2 Appendix A Tec'inical Speci fications Section 6.9.1.8.C, abnormal degradation discovered on the reactor coolant pressure boundary.

The examinations required by Technical Specification Table 4.4.6 are continuing. A final report of the inspection results and corrective actions will be submitted when this work is complete and as required by Technical Specification 4.4.5.1.5.C.

An additional three copies are enclosed.

Yours truly, fl0RTilEAST fiUCLEAR EftERGY COMPANY f}LX*

L /. Mroczka Station Superintendent Millstone Nuclear Power Station EJfi/TB:mo A t ta chmen t:

LER R0-50-336/81-41/01-T cc:

Director, Of fice of Inspection and Enforcement, Washington, D.C. (30)

Director, Office of Management Information and Program Control, Washington, O.C. (3)

U.S. fluclear Regulatory Commission, c/o Document Management Branch, Washington, D.C.

20555 8201250378 820108 PDRADOCKOS000g S

t, fs/f