| Q | CCA | Title |
---|
05000336/FIN-2013004-01 | 2013Q3 | H.6 | Inadequate Corrective Actions to Restore Degraded Unit 3 Main Feedwater Isolation Valves |
05000336/FIN-2013004-02 | 2013Q3 | H.14 | \"Inadequate Operability Determination for the Turbine Drive Auxiliary Feedwater
(TDAFW) Pump\" |
05000336/FIN-2013010-02 | 2013Q3 | | Spurious Operation of Pressurizer Spray Valves Not Analyzed |
05000336/FIN-2013010-03 | 2013Q3 | | Failure to Maintain Cold Shutdown Material On-site |
05000336/FIN-2013010-01 | 2013Q3 | | Inadequate Alternative Shutdown Procedure |
05000336/FIN-2013005-02 | 2013Q4 | | Inadequate Alternative Shutdown Procedure |
05000423/FIN-2013005-03 | 2013Q4 | H.14 | Inadequate Operability Determination for TDAFW Pump Overspeed Trip |
05000336/FIN-2013005-01 | 2013Q4 | | Implementation of NEI 99-01 Guidance |
05000423/FIN-2014002-01 | 2014Q1 | H.6 | Failure to Evaluate Test Results Outside of Acceptance Criteria For A Service Water Pump |
05000423/FIN-2014002-02 | 2014Q1 | | NOED Granted by NRC for TDAFW Pump Repairs on January 26, 2014 |
05000336/FIN-2014403-01 | 2014Q2 | H.12 | Security |
05000336/FIN-2014403-02 | 2014Q2 | | Security |
05000336/FIN-2014003-01 | 2014Q2 | H.12 | Failure to Maintain Adequate Procedure For RCS Drain/Fill |
05000336/FIN-2014003-02 | 2014Q2 | H.14 | Failure to Utilize Respiratory Protection as Specified in Work Control Documents |
05000336/FIN-2014003-03 | 2014Q2 | P.1 | Failure to Adequately Maintain EALs |
05000336/FIN-2014403-03 | 2014Q2 | P.2 | Security |