| Q | CCA | Title |
---|
05000335/FIN-2013002-02 | 2013Q1 | | Failure to Ensure Reactor Auxiliary Building Penetrations Were Adequately Flood Protected |
05000335/FIN-2013007-04 | 2013Q1 | | Penetration Seals Outside Appendix R Requirements |
05000335/FIN-2013007-03 | 2013Q1 | | Internal Conduit Seals Outside Appendix R Requirements |
05000335/FIN-2013007-01 | 2013Q1 | P.2 | Failure to Demonstrate Feasibility of All Omas Used as Compensatory Measures |
05000335/FIN-2013002-01 | 2013Q1 | P.2 | Failure to Promptly Identify and Correct a Condition Adverse to Quality for Alignment of the SAFETY-RELATED Refueling Water Tank to a NON-SEISMIC Spent Fuel Pool Purification System |
05000335/FIN-2013003-02 | 2013Q2 | H.7 | Inadequate MSIV Modification Installation and Test |
05000335/FIN-2013003-01 | 2013Q2 | P.4 | Failure to Monitor Sscs Under 10 CFR 50.65(A)(1) |
05000335/FIN-2013004-01 | 2013Q3 | | Failure to Request NRC Approval prior to implementation of an Alternative Repair Method for ASME Class 3 Piping in the Intake Cooling Water System |
05000335/FIN-2013004-02 | 2013Q3 | | Partial Loss of Offsite Power due to Non-segregated Bus Failure |
05000335/FIN-2013004-03 | 2013Q3 | H.7 | Emergency Diesel Generator Inoperable for a Period Greater Than the Allowed Outage Time |
05000335/FIN-2013008-01 | 2013Q3 | H.9 | Failure to Meet Training Program Standards on Job Performance Measures for the Annual Licensed Operator Requalification Operating Examination |
05000335/FIN-2013005-01 | 2013Q4 | | Failure to Use Only NIOSH Certified Respiratory Protection Equipment |
05000335/FIN-2013005-02 | 2013Q4 | H.2(a) H.6 | Failure to Identify and Implement Appropriate Corrective Actions for AFW System Corrosion |
05000335/FIN-2013201-01 | 2013Q4 | | Security |
05000335/FIN-2013201-02 | 2013Q4 | | Security |
05000335/FIN-2013201-03 | 2013Q4 | | Security |
05000335/FIN-2013404-01 | 2013Q4 | | Security |
05000335/FIN-2013404-02 | 2013Q4 | | Security |
05000335/FIN-2013404-03 | 2013Q4 | | Security |