05000334/FIN-2011005-01
From kanterella
Jump to navigation
Jump to search
Finding | |
---|---|
Title | Unannounced Emergency Response Organization Activation Drill Failure |
Description | A Green, self-revealing non-cited violation (NCV) of 10 CFR 50.47(b)(2) to ensure timely augmentation of response capabilities is available was identified. Specifically, FENOC failed to fully staff two primary Emergency Response Organization (ERO) positions during an unannounced activation drill. FENOC entered this issue into their corrective action program as CR 2011-04431. Traditional enforcement does not apply because the issue did not have an actual safety consequence or the potential for impacting NRC\'s regulatory function, and was not the result of any willful violation of NRC requirements. The inspectors determined that the finding was not similar to the examples for minor deficiencies contained in IMC 0612, Appendix E, Examples of Minor lssues. The finding is more than minor because it affects the Emergency Preparedness cornerstone, The finding is associated with the ERO readiness attribute of the Emergency Preparedness cornerstone to ensure that the licensee is capable of implementing adequate measures to protect the health and safety of the public in the event of a radiological emergency. In accordance with IMC 0609, Appendix B, Sheet 1, Failure to Comply flowchart, the performance deficiency screens to green because it is considered a degraded planning standard function. The cause of this NCV relates to the cross-cutting aspect of Human Performance, Work Practices, in that FENOC personnel did not effectively communicate expectations regarding drill participation and staff did not respond in the required time for ERO positions they had accepted in the call out system. |
Site: | Beaver Valley |
---|---|
Report | IR 05000334/2011005 Section 1EP6 |
Date counted | Dec 31, 2011 (2011Q4) |
Type: | NCV: Green |
cornerstone | Emergency Prep |
Identified by: | NRC identified |
Inspection Procedure: | IP 71114.06 |
Inspectors (proximate) | D Silk G Hunegs D Spindler E Bonney |
CCA | H.8, Procedure Adherence |
INPO aspect | WP.4 |
' | |
Finding - Beaver Valley - IR 05000334/2011005 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Finding List (Beaver Valley) @ 2011Q4
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||