05000331/LER-2010-002, Re Condition Prohibited by Technical Specifications
| ML100700628 | |
| Person / Time | |
|---|---|
| Site: | Duane Arnold |
| Issue date: | 03/11/2010 |
| From: | Costanzo C NextEra Energy Duane Arnold |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| NG-10-0155 LER 10-002-00 | |
| Download: ML100700628 (5) | |
| Event date: | |
|---|---|
| Report date: | |
| Reporting criterion: | 10 CFR 50.73(a)(2)(i) 10 CFR 50.73(a)(2)(vii), Common Cause Inoperability 10 CFR 50.73(a)(2)(ii)(A), Seriously Degraded 10 CFR 50.73(a)(2)(viii)(A) 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition 10 CFR 50.73(a)(2)(viii)(B) 10 CFR 50.73(a)(2)(iii) 10 CFR 50.73(a)(2)(ix)(A) 10 CFR 50.73(a)(2)(iv)(A), System Actuation 10 CFR 50.73(a)(2)(x) 10 CFR 50.73(a)(2)(v)(A), Loss of Safety Function - Shutdown the Reactor 10 CFR 50.73(a)(2)(v)(B), Loss of Safety Function - Remove Residual Heat 10 CFR 50.73(a)(2)(i)(A), Completion of TS Shutdown 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications |
| 3312010002R00 - NRC Website | |
text
EXTera M
ENERGY~
March 11,2010 u.s. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555-0001 Duane Arnold Energy Center Docket 50-331 License No. DPR-49 Licensee Event Report #2010-002-00
/
DUANE ARNOLD NG-10-0155 10 CFR 50.73 Please find attached the subject report submitted in accordance with 10 CFR 50.73. This letter makes no new commitments or changes to any existing
commitments
Christopher R. Costanzo Vice President, Duane Arnold Energy Center NextEra Energy Duane Arnold, LLC cc:
Administrator, Region III, USNRC Project Manager, DAEC, USNRC Resident Inspector, DAEC, USNRC NextEra Energy Duane Arnold, LLC, 3277 DAEC Road, Palo, IA 52324
NRC FORM 366 (9-2007)
PRINTED ON RECYCLED PAPER NRC FORM 366 U.S. NUCLEAR REGULATORY COMMISSION (9-2007)
LICENSEE EVENT REPORT (LER)
(See reverse for required number of digits/characters for each block)
APPROVED BY OMB NO. 3150-0104 EXPIRES:
8/31/2010
, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
- 1. FACILITY NAME Duane Arnold Energy Center
- 2. DOCKET NUMBER 05000 331
- 3. PAGE 1 OF 4
- 4. TITLE Condition Prohibited by Technical Specifications
- 5. EVENT DATE
- 6. LER NUMBER
- 7. REPORT DATE
- 8. OTHER FACILITIES INVOLVED MONTH DAY YEAR YEAR SEQUENTIAL NUMBER REV NO.
MONTH DAY YEAR FACILITY NAME DOCUMENT NUMBER 05000 01 04 10 2010 002 0
03 11 10 FACILITY NAME DOCUMENT NUMBER 05000
- 9. OPERATING MODE
- 11. THIS REPORT IS SUBMITTED PURSUANT TO THE REQUIREMENTS OF 10 CFR §: (Check all that apply) 20.2201(b) 20.2203(a)(3)(i) 50.73(a)(2)(i)(C) 50.73(a)(2)(vii) 1 20.2201(d) 20.2203(a)(3)(ii) 50.73(a)(2)(ii)(A) 50.73(a)(2)(viii)(A) 20.2203(a)(1) 20.2203(a)(4) 50.73(a)(2)(ii)(B) 50.73(a)(2)(viii)(B) 20.2203(a)(2)(i) 50.36(c)(1)(i)(A) 50.73(a)(2)(iii) 50.73(a)(2)(ix)(A)
- 10. POWER LEVEL 20.2203(a)(2)(ii) 50.36(c)(1)(ii)(A) 50.73(a)(2)(iv)(A) 50.73(a)(2)(x) 20.2203(a)(2)(iii) 50.36(c)(2) 50.73(a)(2)(v)(A) 73.71(a)(4) 100%
20.2203(a)(2)(iv) 50.46(a)(3)(ii) 50.73(a)(2)(v)(B) 73.71(a)(5) 20.2203(a)(2)(v) 50.73(a)(2)(i)(A) 50.73(a)(2)(v)(C)
OTHER 20.2203(a)(2)(vi)
X 50.73(a)(2)(i)(B) 50.73(a)(2)(v)(D)
VOLUNTARY LER
- 12. LICENSEE CONTACT FOR THIS LER NAME TELEPHONE NUMBER (Include Area Code)
Bob Murrell, Engineering Analyst 319-851-7900 CAUSE SYSTEM COMPONENT MANU-FACTURER REPORTABLE TO EPIX
CAUSE
SYSTEM COMPONENT MANU-FACTURER REPORTABLE TO EPIX
- 14. SUPPLEMENTAL REPORT EXPECTED
- 15. EXPECTED MONTH DAY YEAR YES (If yes, complete 15. EXPECTED SUBMISSION DATE)
X NO SUBMISSION DATE ABSTRACT (Limit to 1400 spaces, i.e., approximately 15 single-spaced typewritten lines)
On January 4, 2010, a condition prohibited by Technical Specifications (TS) existed. Specifically, a TS violation occurred when it was not recognized that TS Limiting Condition for Operation (LCO) 3.3.1.1, Reactor Protection System (RPS) and 3.3.4.1, End Of Cycle - Recirculation Pump Trip (EOC-RPT) were not met when the Turbine Bypass Valves (TBVs) were in the open position (TS LCO 3.7.7). The LCO conditions existed for approximately 6.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />. LCO 3.3.1.1 requires RPS trip capability to be restored within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and LCO 3.3.4.1 requires a Minimum Critical Power Ratio (MCPR) penalty be inserted within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />. If these actions are not completed, then both TS 3.3.1.1 and 3.3.4.1 require the plant to be less than 26% Rated Thermal Power (RTP) within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> thereafter. Because reactor power was not reduced to less than 26% RTP within the 5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> (total) required by LCO 3.3.1.1, a condition prohibited by TS existed for approximately 1.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />. A condition prohibited by TS 3.3.4.1 also existed for approximately 0.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />. The date of discovery for this event is January 11, 2010.
The cause of this event was determined to be that the plant staff did not have a full/complete understanding of the relationship between TBVs being open and the direct impact on the Turbine First Stage Pressure (TSFP) trip/enable setpoint in determining TS compliance/Operability.
There were no actual safety consequences and no effect on public health and safety as a result of this event.
(If more space is required, use additional copies of (If more space is required, use additional copies of (If more space is required, use additional copies of NRC Form 366A) (17)
PRINTED ON RECYCLED PAPER EIIS System and Component Codes:
TG - Main Turbine Control Fluid System IT - Main Turbine Instrumentation System TA - Main Turbine System
Reporting Requirements
This event is reportable under 10CFR50.73(a)(2)(i)(B), 'Operation or Condition Prohibited by Technical Specification.