05000321/LER-1983-042, Forwards LER 83-042/03L-0

From kanterella
Jump to navigation Jump to search
Forwards LER 83-042/03L-0
ML20074A019
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 04/29/1983
From: Nix H
GEORGIA POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20074A020 List:
References
GM-83-394, NUDOCS 8305110404
Download: ML20074A019 (1)


LER-1983-042, Forwards LER 83-042/03L-0
Event date:
Report date:
3211983042R00 - NRC Website

text

l,

' Ctv s'

y._

G:orgiz Powtr Company e

4

. Pest Offica Box 439

+

Bax:ey. Georgl2 31513 Telephone 912 367-7781 912 537-9444 U.S. NRC I1GN.ea~

Atla nta. Ga.

GeorgiaPower Edwin 1. Hatch Nuclear Plant April 29, 1983 GM-83-394 i

PLANT E.

I.

HATCH Licensec Event Report Docket No.

50-321 United States Nuclear Regulatory Commission Office of Inspection and Enforcement Region II Suite 3100 101 Marietta Street 4

Atlanta, Georgia 30303 ATTENTION:

Mr. James P. O'Reilly Pursuant to Section 6.9.1.9.b of Hatch Unit One Technical Specifications, please find attached Reportable Occurrence Report No. 50-321/1983-042.

/

JM L

H.

C.

Nix

/

General Manager i

,hs-i HCN/SBT/abb xc:

R.

J.

Kelly G.

F.

Head J.

T.

Beckham, Jr.

P.

D.

Rice K.

M. Gillespie S.

B.

Tipps R. D. Baker Control Room Document Control opy[cIAL copyl PDR i