| Title | Inadequate Design Control Associated with the Flooding of a Saltwater Pump Pit |
| Description | The inspectors identified an NCV of 10 CFR 50, Appendix B, Criterion III, Design Control, because Constellation did not correctly translate the internal flooding design basis review for the saltwater (SW) pump pit compartments into specifications, procedures and instructions. Specifically, Constellation did not translate design basis flooding considerations and provisions as described in their internal plant flooding design evaluation into procedures and instructions to assure that the SW pumps would not be submerged during normal operating conditions. As a result, the 21 SW pump pit flooded on December 10, 2008. Constellation entered this issue into their corrective action program (CAP) for resolution as condition reports (CR)-2009-006077, CR-2009-009030 and CR-2010-00167. The immediate corrective action included initiating a CR to document some of the design considerations and provisions needed to prevent the SW pump pit compartments from flooding. The planned corrective actions included developing a preventive maintenance instruction to perform periodic maintenance on the floor drains located in the pump pit compartments and to perform an engineering evaluation to document all of the design provisions to demonstrate the flooding protection of the SW pumps. The finding is more than minor because it is associated with the equipment performance attribute of the Mitigating Systems cornerstone and affects the cornerstone objective to ensure the availability and reliability of the SW system, which responds to initiating events to prevent undesirable consequences (I.e., core damage). Specifically, Constellation did not maintain adequate design control to prevent a dry SW pump pit from flooding during normal operating conditions, which affected the 21 SW pump availability and reliability. The inspectors determined that the finding is of very low safety significance because it is not a design or qualification deficiency, did not represent a loss of a safety function of a system or a single train greater than its Technical Specification (TS) allowed outage time, and did not screen as potentially risk significant due to external events. The inspectors did not assign a cross-cutting aspect to this finding because the inspectors determined that the performance deficiency was a result of a latent issue in that the internal flooding design basis review occurred in May of 1991. Therefore, the inspectors concluded that this did not reflect current performance |
| Site: | Calvert Cliffs |
|---|---|
| Report | IR 05000317/2009005 Section 1R06 |
| Date counted | Dec 31, 2009 (2009Q4) |
| Type: | NCV: Green |
| cornerstone | Mitigating Systems |
| Identified by: | NRC identified |
| Inspection Procedure: | IP 71111.06 |
| Inspectors (proximate) | D Silk M Davis K Young D Johnson S Barr G Dentel N Perry R Rolph J Hawkins |
| INPO aspect | |
| ' | |