Finding | |
---|---|
Title | Inadequate Test Control Associated with the Auxiliary Feedwater Pump Room Emergency Ventilation System |
Description | The inspectors identified an NCV of 10 CFR Part 50, Appendix B, Criterion XI, Test Control, for Units 1 and 2 because Constellation did not establish an adequate test program to assure that the auxiliary feedwater (AFW) pump room emergency ventilation system would perform satisfactorily in service. Specifically, the performance evaluations used to determine the equipment performance of the emergency ventilation system did not incorporate the requirements and acceptance limits contained in the Updated Final Safety Analysis Report (UFSAR). This resulted in Constellation not recognizing that the AFW pump room emergency ventilation system did not meet the design requirements stated in the UFSAR. Constellation entered this issue into their corrective action program (CAP) for resolution as condition report (CR)-2008-002833. The immediate corrective action included performing an operability determination to verify the operability of the Unit 1 and 2 turbine driven auxiliary feedwater (TDAFW) pumps. The planned corrective actions included the installation of larger ventilation fans to obtain the required flow rate and to create a preventive maintenance task to measure the airflow for each emergency ventilation fan. This finding is more than minor because it is associated with the equipment performance attribute of the Mitigating Systems cornerstone and affects the cornerstone objective to ensure the availability and reliability of the AFW system, which responds to initiating events to prevent undesirable consequences (i.e., core damage). The inspectors determined that the finding is of very low safety significance because it is not a design or qualification deficiency, did not represent a loss of a safety function of a system or a single train greater than its Technical Specifications (TS) allowed outage time, and did not screen as potentially risk significant due to external events. Since the performance deficiency was determined to be the result of a latent issue and does not reflect current performance, no cross-cutting aspect is assigned |
Site: | Calvert Cliffs |
---|---|
Report | IR 05000317/2009003 Section 1R04 |
Date counted | Jun 30, 2009 (2009Q2) |
Type: | NCV: Green |
cornerstone | Mitigating Systems |
Identified by: | NRC identified |
Inspection Procedure: | IP 71111.04 |
Inspectors (proximate) | G Dentel S Kennedy R Rolph K Mangan M Davis |