Finding | |
|---|---|
| Title | Failure to Ensure NFPA805 Sprinkler System Demands Met |
| Description | The inspectors identified a finding of very-low safety significance with an associated NCV of the Donald C. Cook Operating Licenses for the failure to ensure minimum fire sprinkler head pressure would be available for all required sprinkler systems. Specifically, the licensee transitioned to National Fire Protection Association (NFPA)805 fire regulations without assessing the impact of a previously identified NRC finding regarding the starting setpoints of the fire pumps. The licensee changed the pressure setpoints such that it became possible only one pump would be automatically started during certain fire scenarios. For those situations, the NRC identified that sufficient pressure may not be available to all required sprinklers per the requirements of NFPA 13, Standard for the Installation of Sprinkler Systems. The licensee corrected the issue by performing calculations to demonstrate one pump would be sufficient. However, when the licensee subsequently transitioned to NFPA805 fire regulations (which added more required sprinklers and continued compliance to NFPA 13), the licensee did not review the previous issue to ensure sufficient pressure would be maintained with the newly required systems. When identified by the NRC, the licensee performed additional calculations to demonstrate that one pump could provide sufficient pressure based on current pump performance. However, the licensee also discovered that current surveillance procedures for the pumps were inadequate, in that, for the full range of allowed performance; pumps could pass the tests yet be below the requirements of the new systems. The licensee initiated action to change the procedures. The finding was more than minor because adversely affected the Protection Against External Factors (Fire) attribute of the Mitigating Systems Cornerstone. The licensee failed to incorporate previous issues with fire pump starting setpoints while validating fire system performance under the new NFPA805 fire regulations and that failure impacted the design control attribute of the mitigating system cornerstone. Specifically, the licensee did not ensure that at least 7 psi would be available at all required sprinkler heads, as required by NFPA 13. The inspectors determined the finding had an associated cross-cutting aspect in the Problem Identification and Resolution area, specifically, P.5, Operating Experience. The licensee did not effectively evaluate and implement relevant internal operating experience with respect to the adoption of new fire protection regulations. As a result, a previously identified NRC issue was not assessed with regard to new demands on the fire protection system. |
| Site: | Cook |
|---|---|
| Report | IR 05000315/2015001 Section 1R15 |
| Date counted | Mar 31, 2015 (2015Q1) |
| Type: | NCV: Green |
| cornerstone | Mitigating Systems |
| Identified by: | NRC identified |
| Inspection Procedure: | IP 71111.15 |
| Inspectors (proximate) | J Ellegood J Mancuso K Riemer L Rodriguez M Mitchell N Feliz-Adorno R Walton T Taylor |
| Violation of: | License Condition - Fire Protection |
| CCA | P.5, Operating Experience |
| INPO aspect | CL.1 |
| ' | |