05000315/FIN-2014005-03
From kanterella
Jump to navigation
Jump to search
Finding | |
---|---|
Title | Inadequate Review of Radiological Impact of the Removal of the Auxiliary Shield Blocks on the Containment Accident Shield Post LBLOCA |
Description | The inspectors identified a non- violation of 10 CFR Part 50, Appendix B, Criterion 3 Design Control, for the licensees inadequate radiological review of permanently removing the Auxiliary Missile Blocks (AMBs) from the Unit 1 and Unit 2 containment accident shields. The finding was determined to be more than minor because it was associated with the Barrier Integrity Cornerstone attribute of design control; and adversely affected the cornerstone objective of maintaining radiological barrier functionality of the safety-related accident shield. Specifically, the failure to control plant design and adequately evaluate the radiological effects of permanently removing the AMBs from the Unit 1 and Unit 2 containment accident shields did not ensure that the accident shield will provide its design function to ensure safe radiation levels outside the containment building following a maximum design basis accident. The inspectors evaluated the finding using the Significance Determination Process (SDP) in accordance with IMC 0609, Significance Determination Process, Attachment 0609.04, Initial Characterization of Findings, dated June 19, 2012. Because the finding impacted the Barrier Integrity Cornerstone, the inspectors screened the finding through IMC 0609, Appendix A, The Significance Determination Process for Findings At-Power, dated June 19, 2012, using Exhibit 3, Barrier Integrity Screening Questions. The finding screened as very-low safety significance (Green) because the finding only represented a degradation of the radiological barrier function provided for the Auxiliary Building. The inspectors determined the cause of this finding did not represent current licensee performance and, thus, no cross-cutting aspect was assigned. |
Site: | Cook |
---|---|
Report | IR 05000315/2014005 Section 1R18 |
Date counted | Dec 31, 2014 (2014Q4) |
Type: | NCV: Green |
cornerstone | Barrier Integrity |
Identified by: | NRC identified |
Inspection Procedure: | IP 71111.18 |
Inspectors (proximate) | E Sanchez J Cassidy J Ellegood J Lennartz K Riemer M Garza M Mitchell M Phalen T Go T Taylor |
Violation of: | 10 CFR 50 Appendix B Criterion III, Design Control |
INPO aspect | |
' | |
Finding - Cook - IR 05000315/2014005 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Finding List (Cook) @ 2014Q4