IR 05000315/2015008

From kanterella
Jump to navigation Jump to search
Inspection Report 05000315/2015008; 05000316/2015008, 11/02/2015 - 11/20/2015; Donald C. Cook Nuclear Power Plant, Units 1 and 2; Team Portion of Pilot Design Bases Inspection. (Nja)
ML16004A437
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 01/04/2016
From: Christine Lipa
NRC/RGN-III/DRS/EB2
To: Weber L
Indiana Michigan Power Co
References
IR 2015008
Download: ML16004A437 (41)


Text

UNITED STATES ary 4, 2016

SUBJECT:

DONALD. C. COOK NUCLEAR POWER PLANT, UNITS 1 AND 2 NRC PILOT DESIGN BASES INSPECTION (TEAMS), INSPECTION REPORT 05000315/2015008; 05000316/2015008

Dear Mr. Weber:

On November 20, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed the team portion of the pilot Design Bases Inspection at your Donald C. Cook Nuclear Power Plant, Units 1 and 2. The enclosed report documents the results of this inspection, which were discussed on November 20, 2015, with Mr. S. Lies, Engineering Vice President, and other members of your staff.

Based on the results of this inspection, seven NRC-identified findings of very low safety significance (Green) were identified. The findings involved violations of NRC requirements.

However, because of their very low safety significance, and because the issues were entered into your Corrective Action Program, the NRC is treating the issues as Non-Cited Violations (NCVs) in accordance with Section 2.3.2 of the NRC Enforcement Policy.

If you contest the subject or severity to any of the NCVs, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001, with copies to the Regional Administrator, Region III; the Director, Office of Enforcement, U.S.

Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at the Donald C. Cook Nuclear Power Plant, Units 1 and 2.

In addition, if you disagree with the cross-cutting aspect assigned to any finding in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the Regional Administrator, Region III, and the NRC Resident Inspector at the Donald C. Cook Nuclear Power Plant, Units 1 and 2.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS)

component of the NRC's Agencywide Documents Access and Management System (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Christine A. Lipa, Chief Engineering Branch 2 Division of Reactor Safety Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74

Enclosure:

IR 05000315/2015008; 05000316/2015008

REGION III==

Docket No: 50-315; 50-316 License No: DPR-58; DPR-74 Report No: 05000315/2015008; 05000316/2015008 Licensee: Indiana Michigan Power Company Facility: Donald C. Cook Nuclear Power Plant, Units 1 and 2 Location: Bridgman, MI Dates: November 2, 2015, through November 20, 2015 Inspectors: N. Féliz Adorno, Senior Reactor Inspector, Lead A. Dunlop, Senior Reactor Inspector, Mechanical R. Walton, Senior Operations Inspector M. Jeffers, Reactor Inspector, Electrical C. Baron, Mechanical Contractor S. Kobylarz, Electrical Contractor Observers: L. Smith, Reactor Inspector J. Parks, Reactor Inspector Approved by: Christine A. Lipa, Chief Engineering Branch 2 Division of Reactor Safety Enclosure

Table of Contents

SUMMARY

................................................................................................................................ 2

REPORT DETAILS

REACTOR SAFETY

......................................................................................... 6

1R21 Design Bases Inspection (Teams)

OTHER ACTIVITIES

.......................................................................................27

4OA2 Identification and Resolution of Problems.................................................27

4OA6 Management Meetings .............................................................................27

SUPPLEMENTAL INFORMATION

KEY POINTS OF CONTACT

.................................................................................................. 1

LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED

....................................................... 1

LIST OF DOCUMENTS REVIEWED

...................................................................................... 2