| Q | CCA | Title |
---|
05000313/FIN-2017015-02 | 2017Q4 | | Security |
05000313/FIN-2017015-01 | 2017Q4 | | Security |
05000313/FIN-2018001-01 | 2018Q1 | | Failure to Establish Adequate Criteria for Flood Seal Testing |
05000368/FIN-2018001-02 | 2018Q1 | | Failure to Preplan and Perform Service Water Pre-Screen Maintenance |
05000313/FIN-2018002-01 | 2018Q2 | H.12 | Failure to Implement Procedural Guidance to Close Spent Fuel Pool Cooler Outlet Crosstie Valve |
05000313/FIN-2018003-01 | 2018Q3 | | Failure to Translate the Design Requirements into Instructions for Refueling Emergency Diesel Generators |
05000313/FIN-2018003-02 | 2018Q3 | H.2 | Failure to Implement Welding Standard Guidance and Examination Procedures |
05000313/FIN-2018003-03 | 2018Q3 | | Failure to Provide Complete and Accurate Information in a License Amendment Request to Change Emergency Action Level Requirements |
05000313/FIN-2018003-04 | 2018Q3 | P.3 | Failure to Verify Safety-Related 4160 V Breaker Operability Following Maintenance Activities |
05000313/FIN-2018003-05 | 2018Q3 | H.4 | Failure to Maintain Main Feedwater Pump B Discharge Pressure in Band Caused a Reactor Trip |
05000313/FIN-2018003-06 | 2018Q3 | P.3 | Reactor Power Transient Caused by the Turbine Bypass Valve Failing Open |
05000313/FIN-2018011-01 | 2018Q3 | | Failure to Properly Size the Unit 1 Emergency Diesel Generator Room Ventilation Svstems |
05000313/FIN-2018011-02 | 2018Q3 | H.6 | Failure of Both Arkansas Nuclear One Units to Establish Adequate Corrective Actions Resulting in Excessive Instances of Damaged and Broken Internals of the Emergency Feedwater Pum o Turbine Steam Admission Check Valves. |
05000313/FIN-2018011-03 | 2018Q3 | | Failure to Evaluate the Effects and the Suitability of Components in Containment from a Main Steam Line Break. |
05000313/FIN-2018405-01 | 2018Q3 | P.2 | Security |