05000305/LER-2009-001, Emergency Diesel Generators Inoperable Requiring Notice of Enforcement Discretion

From kanterella
Jump to navigation Jump to search
Emergency Diesel Generators Inoperable Requiring Notice of Enforcement Discretion
ML090900518
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 03/24/2009
From: Scace S
Dominion, Dominion Energy Kewaunee
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
09-195 LER 09-001-00
Download: ML090900518 (6)


LER-2009-001, Emergency Diesel Generators Inoperable Requiring Notice of Enforcement Discretion
Event date:
Report date:
Reporting criterion: 10 CFR 50.73(a)(2)(i)

10 CFR 50.73(a)(2)(vii), Common Cause Inoperability

10 CFR 50.73(a)(2)(ii)(A), Seriously Degraded

10 CFR 50.73(a)(2)(viii)(A)

10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition

10 CFR 50.73(a)(2)(viii)(B)

10 CFR 50.73(a)(2)(iii)

10 CFR 50.73(a)(2)(ix)(A)

10 CFR 50.73(a)(2)(iv)(A), System Actuation

10 CFR 50.73(a)(2)(x)

10 CFR 50.73(a)(2)(v)(A), Loss of Safety Function - Shutdown the Reactor

10 CFR 50.73(a)(2)(v)(B), Loss of Safety Function - Remove Residual Heat

10 CFR 50.73(a)(2)(i)(A), Completion of TS Shutdown

10 CFR 50.73(a)(2)(v), Loss of Safety Function

10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications
3052009001R00 - NRC Website

text

-4 Dominion° Dominion Energy Kewaunee, Inc.

N490 Highway 42, Kewaunee, WI 54216-9511 MAR 2 4 2009 ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555-0001 Serial No.09-195 LIC/RR/RO Docket No.: 50-305 License No.: 'DPR-43 DOMINION ENERGY. KEWAUNEE,-INC.

KEWAUNEE POWER STATION LICENSEE EVENT REPORT LER 2009-001-00 Pursuant to 10 CFR 50.73, Dominion Energy Kewaunee, Inc., hereby~submits the following Licensee Event Report applicable to Kewaunee Power Station.

Report No. 50-305/2009-001-00 This report has been reviewed by the Facility Safety Review Committee and will be forwarded to the Management Safety Review Committee for its review.

If you have any further questions, please contact Mr. Richard Repshas at (920) 388-8217.

Very truly yours, Stephen E. Scace Site Vice President, Kewaunee Power Station Attachment(s)

Commitments made by this letter: NONE ZiP~9~

I NRC FORM 366 iU.S. NUCLEAR REGULATORYCOMMISSION APPROVED BY OMB: -NO. 3150-0104 EXPIRES: 08/31/2010 (9-2007)

, the NRC (See reverse for required number of may not conduct or sponsor, and a person is not required to respond to, the digits/characters for each block),

information collection.

3. PAGE Kewaunee Power Station 05000305 1

OF 4

4. TITLE Emergency Diesel Generators Inoperable Requiring Notice of Enforcement Discretion
5. EVENT DATE
6. LER NUMBER
7. REPORT DATE
8. OTHER FACILITIES INVOLVED' FACILITY NAME DOCKET NUMBER MONTH DAY YEAR YEAR SEQUENTIAL REV MONTH DAY YEAR NUMBER NO FACILITY NAME 01 23 2009 2009 001 00 03 24
- 2009
9. OPERATING MODE
11. THIS REPORT IS SUBMITTED PURSUANT TO THE REQUIREMENTS OF 10 CFR §: (Check all that apply) o 20.2201(b)

D 20.2203(aXi3)(i)

[I 50.73(a)(2)(i)(C) 0 50.73(a)(2)(vii)

N [I

20.2201(d) 0 20.2203(a)(3)(ii)

[I 50.73(a)(2)(ii)(A) 0 50.73(a)(2)(viii)(A) o 20:2,203(a)(1)

El 20.2203(a)(4)

[3 50.73(a)(2)(ii)(B) 0 50.73(a)(2)(viii)(B)

[]

20.2203(a)(2)(i) 0 50.36(c)(1)(i)(A) 0 50.73(a)(2)(iii) 0 50.73(a)(2)(ix)(A) o 20.2203(a)(2)(ii) 0 50.36(c)(1 )(ii)(A) 0 50.73(a)(2)(iv)(A) 0 50.73(a)(2)(x)

10. POWER LEVEL

[

20.2203(a)(2)(iii) 0 50.36(c)(2) 0 50.73(a)(2)(v)(A)

E0 73.71(a)(4)

O 20.2203(a)(2)(iv) 0 50.46(a)(3)(ii) 0 50.73(a)(2)(v)(B) 0 73.71(a)(5) 100 0

20.2203(a)(2)(v)

[I 50.73(a)(2)(i)(A)

E0 50.73(a)(2)(v)(C)

OTHER O

20.2203(a)(2)(vi) 0 50.73(a)(2)(i)(B)

El 50.73(a)(2)(v)(D)

Specify in Abstract below or in NRC Form 366A

12. LICENSEE CONTACT FOR THIS LER NAME TELEPHONE NUMBER (include Area Code)

Richard Repshas 920-388-8217CAUSE SYSTEM COMPONENT MANU-REPORTABLE

CAUSE

SYSTEM COMPONENT MANU-REPORTABLE FACTURER TO EPIX FACTURER TO EPIX SUPPLEMENTAL REPORT EXPECTED

15. EXPECTED M

LI YES (If yes, complete 15. EXPECTED SUBMISSION DATE)

[

NO SUBMISSION DATE ABSTRACT (Limit to 1400 spaces, i.e., approximately 15 single-spaced typewritten lines)

On January 23, 2009 at 13:58 CST with the station at 100 percent power, Dominion Energy Kewaunee, Inc.

was informed by the Nuclear Regulatory Commission that the station was not complying with Technical Specification 3.7.a.7. The Technical' Specification requires the availability of 35,000 gallons of fuel oil for either diesel generator from two underground storage tanks. A siphon line connecting the two tanks was non-functional and the station was relying on a temporary transfer pump to move fuel oil between the underground tanks. The function of the siphon line had been removed from the licensing basis in 1993. This required the station to declare both emergency diesel generators inoperable and enter Technical Specification 3.0.c, "Standard Shutdown Sequence."

The station made a request for a Notice of Enforcement Discretion for Technical Specification 3.7.a.7 while an exigent Technical Specification License Amendment was being processed. At 15:42 CST on January 23, 2009, the NRC granted the station a 14-day Notice of Enforcement Discretion. Although preparations were made to shutdown, no reactivity manipulations were performed.

This condition is being reported pursuant to 10 CFR 50.73(a)(2)(i)(B), "Any operation or condition which was prohibited by the plant's Technical Specifications."

NRC FORM 366 (9-2007)

PRINTED ON RECYCLED PAPER

NRC FORM.366A U.S. NUCLEAR REGULATORY COMMISSION (9-2007)

LICENSEE EVENT REPORT (LER)

CONTINUATION SHEET

1. FACILITY NAME
2. DOCKET
6. LER NUMBER
3. PAGE

,SEQUENTIAL REV YEAR NUMBER NO.

Kewaunee Power Station 05000305 2

OF 4

2009 001 00

Event Description

At 13:58 CST on January 23, 2009 with the station at 100 percent power, Dominion Energy Kewaunee, Inc.

(DEK) was informed by the Nuclear Regulatory Commission that the station was not complying with Technical Specification (TS) 3.7.a.7.

At the time TS 3.7.a.7 stated for the emergency diesel generators (EDGs).[DG]:

TS 3:7.a.7 "Both diesel generators are OPERABLE. The two underground storage tanks combine to supply at least 35,000 gallons of fuel oil for either diesel generator and the day tanks for each diesel generator contain at least 1,000 gallons of fuel oil."

NRC staff determined that, without a siphon arrangement to equalize underground storage tank [TK] levels, Kewaunee Power Station (KPS) was not in compliance with the requirements of TS 3.7.a.7 that the EDG fuel oil storage tanks combine to supply at least 35,000 gallons for either EDG. In 1993, an evaluation determined the function of the siphon line was not required and other means could be used to transfer fuel oil between the underground storage tanks. Thus, DEK relied on a spare pump [P] to provide the combined fuel oil volume of at least 35,000 gallons. The use of a portable transfer pump was evaluated in 2008. The NRC determined that using a portable transfer pump was not consistent with the KPS licensing basis.

Therefore, compliance with TS 3.7.a.7 was not possible for the existing storage tanks without a siphon arrangement. Consequently, this condition rendered both EDGs inoperable.

With both EDGs inoperable, TS 3.0.c, "Standard Shutdown Sequence," was entered and preparations were being made to begin a plant shutdown.

In accordance with the guidance provided by NRC Inspection Manual, Part 9900: Technical Guidance, "Operations - Notices of EnforcementDiscretion," dated February 7, 2005, DEK requested Enforcement Discretion from TS 3.7.a.7. At 15:42 CST on January 23, 2009, NRC verbally granted Enforcement Discretion to February 6, 2009. This period of 14 days was to allow time for NRC approval of proposed License Amendment Request 247 to reduce the required fuel oil volume for the seven day supply to the EDGs.

TS 3.0.c, "Standard Shutdown Sequence," was exited with there having been no reactivity manipulations.

Reactor power remained at 100 percent.

On February 6, 2009, NRC issued Amendment No. 203 that revised TS 3.7.a.7. The TS was revised from requiring "The two underground storage tanks combine to supply~at least 35,000 gallons of fuel oil for either diesel generator and the day tanks for each diesel generator contain at least 1,000 gallons of fuel oil." to require each diesel generator's underground storage tank and corresponding day tanks to contain a minimum usable volume of 32,888 gallons.

The current TS 3.7.a.7 states:

TS 3.7.a.7 "Both diesel generators are OPERABLE and each diesel generator shall have:

A. Day tanks containing a minimum volume of 1000 gallons; B. An underground storage-tank and corresponding day tanks containing a minimum volume of 32,888 gallons of usable fuel; C. An OPERABLE diesel fuel oil transfer pump."PRINTED ON RECYCLED PAPERU.S. NUCLEAR REGULATORY COMMISSION (9-2007)

LICENSEE EVENT REPORT (LER)

CONTINUATION SHEET

1. FACILITY NAME
2. DOCKET
6. LER NUMBER
3. PAGE Y

SEQUENTIAL REV Kewaunee Power Station 05000305 3

OF 4

2009 001 00 Event and Safety Consequence Analysis:

The requirement to maintain a single failure design EDG system with sufficient fuel to operate for seven days is identified in ANSI N 195-1976, "Fuel Oil Systems for Standby Diesel-Generators," section 5.2. DEK committed to meeting section 5.2 as part of its licensing basis when TS 3.7.a.7 was amended in 1989, ANSI N 195-1976, section 5.2 states:

"The fuel oil system of single-unit nuclear statiohs shall be so designed that a single failure will not result in the loss of minimum diesel generator capacity. The on-site storage shall be sufficient to operate the minimum number of diesel-generators following the limiting design basis accident for either seven (7) days, or the time required to replenish the oil from sources outside the plant site following any limiting design-basis event without interrupting the operation of the diesel, whichever is longer."

In the ANSI Standard, "minimum diesel-generator capacity" is defined as: "The minimum electrical output

,from the diesel-generator to assure the operation of the minimum plant equipment required to prevent unacceptable consequences for any plant design basis event or accident condition."

DEK's position was that it could provide a seven day supply of fuel oil to either EDG, thus meeting TS 3.7.a.7.

With both EDGs inoperable based on the inability to meet TS 3.7.a.7, this condition is being reported pursuant to 10 CFR 50.73(a)(2)(i)(B), "Any operation or condition which Was prohibited by the plant's Technical Specifications."

The overall safety significance is very small as discussed below.

The required minimum volume of fuel oil for the EDGs is sufficient to provide for seven days of continuous operation. Consistent with industry PRA models, the mission time for EDGs in the DEK Probabilistic Risk Assessment (PRA) model is 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Within this time window, it is postulated that, for all accidents and transients modeled in the PRA, a safe stable condition is reached. The administratively controlled amount of available fuel oil allows EDGs to be operated for a significantly longer time than the.24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> ORA mission time. Additionally, the offsite power non-recovery probability at seven days is negligible. Therefore, the above noncompliance with the 35,000 gallon requirement in TS 3.7.a.7 does not invalidate the PRA assumptions or assertions and there is no increased risk due to this noncompliance. The incremental conditional core damage probability (ICCDP) and the conditional large early release probability (ICLERP) are negligible.

Although unable to meet the requirement to automatically provide a seven day supply of fuel oil to one EDG given a single failure, ample time would be available to transfer onsite stored fuel oil manually to provide the seven day supply to one EDG.

Cause

The licensing basis for the EDG fuel oil system was altered in 1993 by removing the function of the siphon line to provide an equal level in both underground storage tanks thus causing inability to comply with TS 3.7.a.7.PRINTED ON RECYCLED PAPERPRINTED ON RECYCLED PAPERU.S. NUCLEAR REGULATORY COMMISSION (9-2007)

LICENSEE EVENT REPORT (LER)

CONTINUATION SHEET

1. FACILITY NAME
2. DOCKET

.6. LER NUMBER

3. PAGE SEQUENTIAL I REV IYEAR NUMBER INO.

Kewaunee Power Station 05000305 -

4 OF 4

2009' 001 00 In, 2008, a temporary modification was, developed that may have inappropriately approved the use of a portable transfer pump to maintain compliance with TS 3.7.a.7. A root cause is evaluating the condition, and if it is determined to be a cause of this event, a supplement to this LER will be made.

Corrective Actions

License AmendmentNo. 203 was approved by the'NRC on February 6, 2009 to identify fuel oil storage requirements that would provide for a seven day supply of fuel to either EDG without credit for connection between the two underground storage tanks.

Similar Events

NonePRINTED ON RECYCLED PAPERPRINTED ON RECYCLED PAPER

Serial No.09-195 Page 2 of 2 cc:

Regional Administrator, Region III U.S. Nuclear Regulatory Commission 2443 Warrenville Road Suite 210 Lisle, IL 60532-4352 Mr. P. S. Tam Sr. Project.Manager U.S. Nuclear Regulatory Commission One White Flint North, Mail Stop 08-H-4A 11555 Rockville Pike Rockville, MD,20852-2738 NRC Senior Resident Inspector Kewaunee Power Station