05000305/FIN-2011005-04
From kanterella
Jump to navigation
Jump to search
Finding | |
|---|---|
| Title | Inadequate Operability Determination of Control Room Air Conditioning System Components |
| Description | A finding of very low safety significance was identified by the inspectors for the failure to adequately assess operability of the Control Room Air Conditioning Component (ACC) dampers, ACC-15 and ACC-16, in Operability Determination (OD) 456, Revision 0, ACC-15 and ACC-16 QA Classification, in accordance with site Procedure OP-AA-102-1001, Development of Technical Basis to Support Operability Determinations, Revision 4. The licensee entered the issue into their CAP and was completing an apparent cause evaluation at the conclusion of the inspection period. The finding was determined to be more than minor in accordance with IMC 0612, Power Reactor Inspection Reports, Appendix B, Issue Screening, dated December 24, 2009, because the finding, if left uncorrected, had the potential to become a more significant safety concern. Specifically, the failure to give the operators written instructions to manually reposition the SR dampers could have led to situations where the operators would not have been able to rapidly and correctly manually reposition the SR dampers to perform their required safety functions necessary to mitigate design basis accidents. The inspectors determined the finding could be evaluated using IMC 0609, Significance Determination Process, Attachment 0609.04, Phase 1 - Initial Screening and Characterization of Findings, Table 4a, for the MS Cornerstone, dated January 10, 2008. The inspectors answered No to the MS questions and screened the finding as having very low significance (Green). The finding has a cross-cutting aspect in the area of Human Performance - Decision-Making, because the licensee failed to communicate decisions and the bases for decisions to personnel who had a need to know the information in order to perform work safely, in a timely manner. Specifically, the licensee failed to communicate in a timely manner to the reactor operators the written instructions in the standing order necessary to manually reposition the dampers to their SR positions after a design basis accident. |
| Site: | Kewaunee |
|---|---|
| Report | IR 05000305/2011005 Section 1R15 |
| Date counted | Dec 31, 2011 (2011Q4) |
| Type: | Finding: Green |
| cornerstone | Mitigating Systems |
| Identified by: | NRC identified |
| Inspection Procedure: | IP 71111.15 |
| Inspectors (proximate) | D Mcneil R Winter K Riemer J Cassidy D Betancourt K Barclay N Feliz-Adomo M Jones J Beavers V Myers S Shah M Ziolkowski |
| CCA | H.10, Bases for Decisions |
| INPO aspect | CO.2 |
| ' | |
Finding - Kewaunee - IR 05000305/2011005 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Finding List (Kewaunee) @ 2011Q4
Self-Identified List (Kewaunee)
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||