| | Q | CCA | Title |
|---|
| 05000305/FIN-2007011-04 | 2007Q4 | | Effects of Air Entrainment in ECCS Pumps |
| 05000305/FIN-2008402-02 | 2008Q1 | H.1 H.2(d) | Security |
| 05000305/FIN-2008402-01 | 2008Q1 | | Security |
| 05000305/FIN-2008002-03 | 2008Q1 | | Containment Sump Programmatic Controls Not in USAR |
| 05000305/FIN-2008002-01 | 2008Q1 | P.3 | Scaffolding in Close Proximity to Multiple SAFETY-RELATED Systems Affects Operability |
| 05000305/FIN-2008002-02 | 2008Q1 | H.8 | Failure to Follow the Provisions of Corrective Action Procedure PI-KW-200 Following Surveillance Testing of Containment Isolation Valve LOCA-31 |
| 05000305/FIN-2008003-03 | 2008Q2 | | Siphon Line Which Interconnected Two Diesel Generator Emergency Fuel Oil Storage Tanks Was Not Functioning as Designed |
| 05000305/FIN-2008003-02 | 2008Q2 | | Lack of Calculation to Show That the Auxiliary Building Floor Fan Coil Units CAN Perform Their SAFETY-RELATED Function at the Maximum Design Service Water Temperature |
| 05000305/FIN-2008003-01 | 2008Q2 | H.8 | Failure to Follow the Provisions of General Nuclear Procedure, GNP-12.06.01, Hot and Cold Weather Operations |
| 05000305/FIN-2008503-01 | 2008Q3 | H.7 | Failure to Maintain a Standard EAL Scheme |
| 05000305/FIN-2008004-02 | 2008Q3 | H.5 | Failure to Perform a 10 CFR 50.59 Screening for Alteration During Maintenance That Existed for More Than 90 Days |
| 05000305/FIN-2008004-01 | 2008Q3 | P.2 | Operability Evaluation for Degraded Pedestals Failed to Adequately Evaluate Degraded Conditions Per Procedures |
| 05000305/FIN-2008004-03 | 2008Q3 | H.13 | Inadequate Procedure Results In Unplanned Control Rod Motion |
| 05000305/FIN-2008201-01 | 2008Q3 | H.14 | Security |
| 05000305/FIN-2008201-02 | 2008Q3 | | Security |