05000289/FIN-2012005-01
From kanterella
Jump to navigation
Jump to search
Finding | |
---|---|
Title | Adequacy of Seismic Gap Flood Seal |
Description | The inspectors identified a non-cited violation (NCV) of General Design Criterion 2, Performance Standards, because Exelon had not established measures to ensure that the seismic gap flood seal was adequate to remain watertight during a probable maximum flood (PMF) event, as required by the TMI design. Specifically, the design requirement for the seismic gap seal specified that it was to be watertight. However, the installed seal configuration had measurable leakage when tested. The inspectors determined that the failure to construct, maintain, and inspect the seismic gap flood seal consistent with its design (e.g., watertight) was a performance deficiency within Exelon\'s ability to foresee and prevent. Exelon entered this issue into their corrective action program, took appropriate interim corrective actions, and completed permanent modifications to restore the watertight function of the seismic gap barrier. This finding was more than minor because it was similar to the more than minor example 3.j in Inspection Manual Chapter (IMC) 0612 Appendix E, Examples of Minor Issues, in that the seal\'s as-built and maintained configuration resulted in a condition where there was reasonable doubt regarding the functionality of the seismic gap seal to remain watertight during a PMF event. Also, this finding was associated with the protection against external factors attribute of the Mitigating Systems Cornerstone and adversely affected the cornerstone objective of ensuring the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. In accordance with IMC 0609, Appendix G, Shutdown Operations Significance Determination Process, the inspectors performed a bounding risk evaluation using an unavailability period of greater than one year for the watertight seal, and determined this finding was of very low safety significance (Green). This finding has a cross-cutting aspect, as described in IMC 0310, in the area of Human Performance, Decision Making, because Exelon failed to verify the validity of underlying assumptions or continued functionality of the seismic gap flood seal following an external flood re-analysis which revised the design basis PMF conditions. |
Site: | Three Mile Island |
---|---|
Report | IR 05000289/2012005 Section 4OA2 |
Date counted | Dec 31, 2012 (2012Q4) |
Type: | NCV: Green |
cornerstone | Mitigating Systems |
Identified by: | NRC identified |
Inspection Procedure: | IP 71152 |
Inspectors (proximate) | C Cahill D Kem D Werkheiser G Hunegs J Heinly J Laughlin J Richmond S Galbreath T Moslak |
CCA | H.14, Conservative Bias |
INPO aspect | DM.2 |
' | |