| Title | Failure to Implement Fire Protection Compensatory Actions for Out-of-Service Appendix R Heat Exchanger |
| Description | The inspectors identified a non-cited violation of license condition DPR-50 section 2.C.(4), Fire Protection, for Exelons failure to implement compensatory actions during planned maintenance on the A nuclear service heat exchanger (NS-C-1A). Specifically, on May 10, 2010, Exelon failed to return Appendix R breakers to their correct position within the seven day allowed outage time and implement compensatory actions in accordance with administrative procedure (AP) 1038, Fire Protection Program. The inspectors determined Exelons failure to implement compensatory actions during planned maintenance on NS-C-1A in accordance with AP 1038 was a performance deficiency that was within Exelons ability to foresee and correct. Exelon performed an extent of condition review and created a requirement to review the fire hazard analysis report for applicability before removing equipment from service. Exelon has entered this issue in the corrective action program for resolution as IR 1347403. This finding is more than minor because it was associated with the protection against external factors attribute of the Mitigating Systems cornerstone and affected the cornerstone objective to ensure the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. In accordance with Inspection Manual Chapter 0609.04, Phase 1 Initial Screen and Characterization of Findings, the inspectors conducted a phase 1 SDP screening using Appendix F, Fire Protection Significance Determination Process, and determined that a detailed phase 2 analysis was required due to the elevated calculated delta core damage frequency. The inspectors performed a detailed walkdown of the control cables associated with the nuclear river system valves and identified no fire ignition sources and concluded that the finding was very low safety significance (Green). This finding has a cross-cutting aspect in the area of Human Performance, Resources, because Exelon failed to ensure complete, accurate, and up-to-date procedures were used to determine if compensatory actions were required for planned work activities |
| Site: | Crane |
|---|---|
| Report | IR 05000289/2012002 Section 1R04 |
| Date counted | Mar 31, 2012 (2012Q1) |
| Type: | NCV: Green |
| cornerstone | Mitigating Systems |
| Identified by: | NRC identified |
| Inspection Procedure: | IP 71111.04 |
| Inspectors (proximate) | T Moslak D Werkheiser G Hunegs C Cahill C Crisden J Heinly D Everhart M Orr B Cook |
| CCA | H.7, Documentation |
| INPO aspect | WP.3 |
| ' | |
Finding - Crane - IR 05000289/2012002 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Finding List (Crane) @ 2012Q1