| | Q | CCA | Title |
|---|
| 05000289/FIN-2010009-02 | 2010Q3 | | MSSV Design Basis Calculations Inaccurate |
| 05000289/FIN-2010009-01 | 2010Q3 | P.2 | Deficient Extent Of Condition Evaluation for a 2007 \'B\' EDG Scavenging Air Box Gasket Leak Which Affected the Reliability and Availability of the \'A EDG |
| 05000289/FIN-2010009-03 | 2010Q3 | | Multiple MSSVs test failures due to improper evaluation of Operating Experience |
| 05000289/FIN-2010009-04 | 2010Q3 | | Potential Concern Regarding TMI\'s Internal and External Flood Protection Barriers and Mitigation Strategies |
| 05000289/FIN-2010004-01 | 2010Q3 | H.8 | Deficient Control of Transient Material in Seismic Class I Buildings |
| 05000289/FIN-2010005-01 | 2010Q4 | P.5 P.2(a) | Inadequate Preventative Maintenance for Signal Converter Causes Turbine Trip and Plant Transient |
| 05000289/FIN-2010005-02 | 2010Q4 | P.5 P.2(b) | Deficient Internal and External Flood Barrier Inspection Program |
| 05000289/FIN-2011403-01 | 2011Q1 | | Security |