05000282/LER-1979-024, Forwards LER 79-024/03L-0

From kanterella
Jump to navigation Jump to search
Forwards LER 79-024/03L-0
ML19276G902
Person / Time
Site: Prairie Island Xcel Energy icon.png
Issue date: 08/24/1979
From: Mayer L
NORTHERN STATES POWER CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19276G903 List:
References
NUDOCS 7908280586
Download: ML19276G902 (1)


LER-1979-024, Forwards LER 79-024/03L-0
Event date:
Report date:
2821979024R00 - NRC Website

text

'h NSP NORTHEAN STATES POWER COMPANY M t N N E A PO L.t e, M I N N E S OTA 55401 Augus-24, 1979 Mr J G Keppler Office of Inspection & Enforcement U S Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137

Dear Mr Keppler:

PRAIRIE ISLAND NUCLEAR GENERATING PLANT Docket No. 50-282 License No. DPE-42 Failure to Perform S1 Pump Test SP1088 before Leaving Cold Shutdown The Licensee Event Report for this occurrence is reproduced on the back of this letter.

Enclosed are three copies.

This event is reported in compliance with Technical Specification 6.7.B.2(c) since it represents an inadequacy in the implementation of administrative controls.

Yours very truly, I

k wa Fo A L 0 Mayer, PE Manager of Nuclear Support Services LOM/DMM/jh cc:

Director, IE, USNRC (30)

  • Ttrector, MIPC, USNRC (3)

MPCA Attn: J W Ferman M

- over-g '{

k9 1908280Ffd