Title | Inadequate Testing Procedure Causes an Emergency Bus to Deenergize |
Description | A self-revealing, Green NCV of Surry TS 6.4.A.7 was identified because the Unit 2 H emergency bus was lost during performance of 2-PT-2.33A, Emergency Bus Undervoltage and Degraded Protection Test H Train, on September 16, 2015. An inadequate procedure allowed steps in the procedure to continue without verification that a tripped relay had not reset. Specifically, 2-PT-2.33A did not have instructions necessary to validate the state of the normally energized undervoltage (UV) relays once power was restored to the relay. This allowed an UV relay to remain in a deenergized state when the next relay was tested. As a consequence, the two of three coincidence was met for the Unit 2 H emergency bus to deenergize and automatically start and load the #2 emergency diesel generator (EDG) onto the Unit 2 H bus. This issue was documented in the licensees CAP as CR 1009999. The inspectors concluded that the failure of the licensee to have the instructions necessary to successfully accomplish the purpose of 2-PT-2.33A, as required by Dominion procedure SPAP-0504, was a PD. Using IMC 0612, Appendix B, Issue Screening, dated September 7, 2012, the inspectors determined that the performance deficiency was more than minor because it was associated with the procedural quality attribute of the Initiating Events Cornerstone and adversely affected the cornerstone objective to limit the likelihood of events that upset stability and challenge critical safety functions during shutdown as well as power operations. Using IMC 0609.04, Initial Characterization of Findings, Table 2, dated June 19, 2012; the finding was determined to affect the Initiating Events Cornerstone. The inspectors screened the finding using IMC 0609, Appendix A, SDP for Findings at-Power, dated June 19, 2012, and determined that it screened as Green because the deficiency did not involve the complete or partial loss of a support system that contributes to the likelihood, or cause, an initiating event and affected mitigation equipment. This finding has a cross-cutting aspect in the documentation aspect of the human performance area, H.7, because the licensee did not create and maintain complete and accurate documentation to validate that an emergency bus UV relay had been restored to its normal energized state during testing. |
Site: | Surry |
---|---|
Report | IR 05000281/2015004 Section 1R12 |
Date counted | Dec 31, 2015 (2015Q4) |
Type: | NCV: Green |
cornerstone | Initiating Events |
Identified by: | Self-revealing |
Inspection Procedure: | IP 71111.12 |
Inspectors (proximate) | A Sengupta C Jones D Bacon P Mckenna R Kellner S Rose W Loo |
Violation of: | Technical Specification - Procedures Technical Specification |
CCA | H.7, Documentation |
INPO aspect | WP.3 |
' | |