05000280/LER-2002-001, Inadvertent Auxiliary Feedwater Pumps Autostarts Due to Relay Failure
| ML030690387 | |
| Person / Time | |
|---|---|
| Site: | Surry |
| Issue date: | 03/03/2003 |
| From: | Blount R Virginia Electric & Power Co (VEPCO) |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| 03-121, SPS:TJN R1 LER 02-001-00, LER-02-001-00 | |
| Download: ML030690387 (6) | |
| Event date: | |
|---|---|
| Report date: | |
| Reporting criterion: | 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications 10 CFR 50.73(a)(2)(iii) 10 CFR 50.73(a)(2) 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(i)(A), Completion of TS Shutdown |
| 2802002001R00 - NRC Website | |
text
1 OCFR50.73 Virginia Electric and Power Company Surry Power Station 5570 Hog Island Road Surry, Virginia 23883 March 3, 2003 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D. C. 20555-0001 Serial No.:
SPS: TJN Docket No.:
License No.:
03-121 R1i" 50-280 DPR-32
Dear Sirs:
Pursuant to 10CFR50.73, Virginia Electric and Power Company hereby submits the following Licensee Event Report applicable to Surry Power Station Unit 1.
Report No. 50-280/2002-001-00 This report has been reviewed by the Station Nuclear Safety and Operating Committee and will be forwarded to the Management Safety Review Committee for its review.
Very truly yours Richar H. Blount, Site Vice President Surry Power Station Enclosure Commitments contained in this letter:
- 1. Evaluations were initiated to determine the causes of these events. The approved recommendations from these evaluations will be implemented.
cc:
United States Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23 T85 Atlanta, Georgia 30303-8931 Mr. R. A. Musser NRC Senior Resident Inspector Surry Power Station
APPROVED BY OMB NO. 3150-0104 EXPIRES 7-31-2004 NRC FORM 366 U S. NUCLEAR REGULATORY (7-2001)
COMMISSION request 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> Reported lessons learned are incorporated into the licensing process and fed back to industry Send comments regarding burden estimate to the Records Management Branch (T-6 E6), U S Nuclear Regulatory Commission, Washington. DC 20555-0001. or by internet e-mail to bisi @nrc gov, and to the Desk Offcer, Office of Information and Regulatory Affairs, NEOB-10202 (3150-0104),
LICENSEE EVENT REPORT (LER)
Office of Management and Budget, Washington, DC 20503 If a means used to (See reverse for required number of digits/characters for each block) impose information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection FACILITY NAME (1)
DOCKET NUMBER (2)
PAGE (3)
SURRY POWER STATION, Unit 1 05000 - 280 1OF4 TITLE (4)
Inadvertent Auxiliary Feedwater Pumps Autostarts Due to Relay Failure EVENT DAT (5)
LER NUMBER. (6, l REPORT DATE (7) l OTHER FACILITIES INVOLVED (8)
MONTH DAY YEAR YEAR SEQUENTIAL REVISION MONTH DAY YEAR FACILTY NAME DOCUMENT NUMBER NUMBER NUMBER 05000-12 31 2002 2002 001 00 03 03 2003 FACILITY NAME DOCUMENT NUMBER OPERATING THIS REPORT IS SUBMITTED PURSUANTTO THE REQUIREMENTS OF 10 CFR §: (Check all that apply) (11)
MODE (9) l NA ll_ 20.2201(b) 20.2203(a)(3)(ii) 50.73(a)(2)(i)(B) 50 73(a)(2)(ix)(A)
POWER l
20 2201(d) 20.2203(a)(4) 50.73(a)(2)(iii) 50 73(a)(2)(x)
LEVEL(10) 100 20 2203(a)(1) 50 36(c)(1)(i)(A)
X 50.73(a)(2)(rv)(A) 73.71 (a)(4) 20 2203(a)(2)(i) 50 36(c)(1)(ii)(A) 50 73(a)(2)(v)(A) 73.71 (a)(5) 20 2203(a)(2)(ii) 50 36(c)(2) 50 73(a)(2)(v)(B)
OTHER 20 2203(a)(2)(iii) 50.46(a)(3)(li) 50.73(a)(2)(v)(C)
Specdy in Abstract below or 20 2203(a)(2)(iv) 50.73(a)(2)(i)(A) 50.73(a)(2)(v)(D) in (If more space is required, use additional copies of (If more space is required, use additional copies of NRC Form 366A) (17) 6.0 ACTIONS TO PREVENT RECURRENCE Evaluations are in progress to determine the causes of these events.
The approved recommendations from these evaluations will be implemented.
7.0 SIMILAR EVENTS
On December 14, 2002 while performing a different PT, a temporarily installed jumper alligator clip failed to establish continuity due to a high resistance connection. The cause of the high resistance was attributed to oxidation on the terminal screw to which the jumper's alligator clip was attached. The jumper's alligator clip was removed from the terminal point screw, the jumper's alligator clip was reconnected to the wire landed on the terminal point, and the PT was performed satisfactorily.
8.0 MANUFACTURER/MODEL NUMBER The failed Train "A" MDAFWP starting relay was a Westinghouse model BFD-24S.
9.0 ADDITIONAL INFORMATION
None.